Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii M And I Shutdown - August 2021 Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii , CPCL, Manali - Chennai.-Tamil Nadu

Chennai Petroleum Corporation Limited-CPCL has published Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii M And I Shutdown - August 2021 Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii . Submission Date for this Tender is 13-08-2021. Coats and Jackets Tenders in CPCL, Manali - Chennai. Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

28816951
Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii M And I Shutdown - August 2021 Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii
Open Tender
Indian
Tamil Nadu
CPCL, Manali - Chennai.
13-08-2021

Tender Details

Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii M And I Shutdown - August 2021 Carryout Maintenance Jobs In Reformer In Plant 214 And Piping Replacement Jobs In Plant 211 During Refinery Iii M And I Shutdown - August 2021 , Carryout Maintenance Jobs In Reformer In , <H>Carryout Maintenance Jobs In Reformer In Plant-214 And Piping Replacement Jobs In Plant-211 During Refinery-3 M&I Shutdown-Aug-2021. </> , <H>Supply, Erection & Dismantling Of Steel Scaffolding-</>The Job Includes Supply, Transportaiton Of Scaffolding Materials Is In Contractors Scope Of Supply , Erection Of Scaffolding At Site Covering The Areas Specified Including Providing Vertical Posts Of Pipes At Inter Distance Of 1.5M And Horizontal Numbers At A Inter Distance Of 0.5 To 0.75 Meter, Providing Rods At Corners To Give Sufficient Strength To The Structure, Placing Thesteel Planks / Frp Gratings On Top For Making Sufficient Area. Dismantling Scaffolding After Completion Of Job.Necessary Quantity Of Scaffolding Pipes At Various Lengths, Rolling / Fixed Clamps, Metal Jolleyincluding All Tools, Tackles, Consumables, Labours And Contractors Supervision To Be Mobilised For Completion Of The Jobs Scope.<H><U>Note</></>: I) For Measurement In Sqm : 2( Length + Width) X Height Area Covered By The Scaffolding Is To Be Taken. Ii) Scaffolding Measurement To Be Done By Breaking The Height Into Parts As Per Height Slab Mentioned Below And Adopting Respective Rates Against Mentioned Height Slabs.<H><U>Remarks</></>: (I) Mode Of Measurement For The Above Items Shall Be In Meter Square. Measurement Shall Be Taken As 2 Times Length + Bredth Multiplied By Height. This Shall Be Applicable For Outside Of The Confined Space. (Ii) For Scaffolding Erected From Any Platform,Height Of The Scaffolding Shall Be Taken From The Platform I.E Platform Shall Be Taken As Zero Meter Level. (Iii) In Addition To Above For Any Other Locations The Measurement Of Eic Shall Be Final And Binding To Contractor. (Iv) Erection Of Scaffolding And Removal / Dismantling Of The Same Scaffolding After Completion Of Job Shall Be Considered As Completed Job. No Separate Payment For Removal Of Scaffolding Shall Be Made. , <H>Supply, Scaffolding Erection & Dismantling (External)</> , Up To 6M Height. , Above 6 M Up To 10 M Height. , Above 10 M Up To 20 M Height. , Above 20 M Up To 30 M Height. , Above 30 M Up To 40 M Height. , Above 40M Up To 50M Height. , Intermediate Platform. , <H>Supply,Scaffolding Erection & Dismantling (Internal Scaffolding)- For Reformer 214</> , Erection & Dismatlingof Scaffolding Inside The Reformer. , <H>Blinding And De-Blinding</>The Job Includes Collection & Transportation Of Required Quantity Of Materials Like Blinds, Gaskets, Fasteners, Etc., From Owners Storage Point, Loosening & Tightening Of Studs (Cold / Gas Cutting If Required), Wedge Opening, Cleaning Of Flanges, Insertions Andremoval Of Blind & Gaskets, Providing New Gaskets After Removal Of Blinds, Overhauling Of Fasteners Using Oil, Replacing The Defective Studs / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting.The Job Also Includes Supplying Of All Types Of Tools & Tackles, L Ifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H><U>Note</></>: (1) Nominal Diameter Of The Flanges Shall Be Taken For All Measurements. (2) In Case Of Either One Of The Activity Like Blinding Or De-Blinding Arise, 50% Of The Applicable Rate Shall Be Paid For The Single Activity. (3)This Rate Will Be Applicable Only For The Pipeline Replcement Job / Modification Jobs Only. For All Other Jobs Bliding & Deblinding Is Included Inlumpsum. , <H>Blinding And Deblinding For 150# & 300# Ratings:</> , Blinding & Deblinding - Size Upto1-1/2 Inch Dia. , Blinding & Deblinding - Size 2 Inch Dia. To 5 Inch Dia. , Blinding & Deblinding - Size 6 Inch Dia. To 10 Inch Dia. , Blinding & Deblinding - Size 12 Inch Dia. To 16 Inch Dia. , Blinding & Deblinding - Size 18 Inch Dia. To 24 Inch Dia. , Blinding & Deblinding - Size 36 Inch Dia To 48 Inch Dia. , <H>Removal / Installation / Refixing Of Flanged Valves</>The Job Includes Removal Of Flanged Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting And Transportation Of The Valve To The Maintenance Valve Shop Or Any Other Designated Place Inside The Refinery Premises For Repair / Disposal.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , <H>Valve Rating - 150# & 300#</> , Removal Of Valves - Size 2 Inch Dia. To 3 Inch Dia. , Removal Of Valves - Size 4 Inch Dia. To 6 Inch Dia. , <H>Installation Of Flanged Valves (Other Than Safety Valves)</>The Job Includes Transportation Of Valves, Gaskets, Fasteners, Etc., From The Owners Storage Point Or Valve Maintenance Shop, Cleaning, Checking, Tightening The Gland, Greasing & Freeing Up Etc., Servicing Of All The Fasteners Using Oil, Replacing With New Fasteners Wherever Required, Hydrotesting The Valve If Required, At The Specified Pressure At Valve Maintenance Shop,Installation Of Flanged Valve At All Heights & Grades Using Proper Gaskets & Studs.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Dumping The Generated Scrap Material To The Designated Area, All Consumables And Labour To Complete The Job In All Respects. , <H>Valve Rating - 150# & 300#</> , Installation Of Valves - Size 2 Inch Dia. To 3 Inch Dia. , Installation Of Valves - Size 4 Inch Dia. To 6 Inch Dia. , <H>Removal & Refixing Of Flanged Safety Valves</>The Job Includes Removal Of Flanged Safety Valves At All Grades & Elevations By De-Bolting / Cold Cutting / Gas Cutting, Providing A Temporary Blind Flange At The Inlet & Outlet Of Safety Valve, Providing Identification Mark On The Safety Valve With A Tag And Transportation Of The Valve To The Maintenance Valve Shop For Servicing / Testing.The Job Also Includes Transportation Of Safety Valves From Maintenance Valve Shop After Servicing & Testing, Servicing Of All The Fasteners Using Oil, Replacing With New Fasteners Wherever Required, Installation Of The Safety Valve At All Heights & Grades Using Proper Gaskets & Studs.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Required Materials Like Gaskets & Fasteners From Owners Storage Point, Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , <H>Valve Rating - 150# &300# - Above 15 Metres Elevation From Ground Level</> , Removal & Re-Fixing Of Safety / Relief Vavles - Size Above 6 Inch Dia. & Upto 10 Inch Dia. , <H>Opening & Boxing Of Manways / Covers / Panels /</>The Job Involves Opening Of Furnace Manways, Covection Panels, Header Box Covers, Header Plugs, Etc., By De-Bolting (Cold / Gas Cutting If Required), Cleaning, And Finally Boxing Up With Proper Gasket, Packing, Servicing Of Bolts & Nuts, Replacing Defective Bolts / Nuts To Ensure Zero Leak Of Joints Including Hot Bolting.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Etc., Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Material From Owners Storage Point To The Work Site & Unused Materials Back To The Storage Point And Dumping The Generated Scrap Material To The Designated Area As Per Eic Instructions. , <H>Opening And Boxing Up</> , Opening And Boxing Up Of Manways. , Opening And Boxing Up Of Convection Panels. , Opening And Boxing Up Of Header Box Covers. , <H>Burners</> , <H>Burner Assembly /Air Register / Burner Manifold - Servicing</>The Job Involves Disconnection Of All Piping Connected To The Burners, Dropping Fuel Gas Manifold, Pilot Gas Riser Pipe And Oil Guns, Dropping The Entire Assembly Of The Burner (With Identification Marks) With Or Without Air Register Depending On The Type Of Burner, Covering The Burner Opening Of The Bottom Plate / Plenum Plate / Burner Housing Barrel Using Aluminium Sheet, Cleaning The Burner Assembly, Servicing Of Primary & Secondary Air Registers, Disassembling The Oil Tip, Atomiser, And Cleaning & Blowing The Same With Steam, Replacement Of Damaged Burner Tips & Oil Gun If Required, Straightening Of Flapper Wherever Required.The Job Also Involves Replacement Of Studs / Ceramic Fibre Lining In The Wind Box, Replacement Of Regen Tiles If Required And Checking The Movement Of The System And Offering To Maintenance / Mfg. Personnel, Removing The Aluminium Sheet, Boxing Up The Total Burner Assembly By Providing Proper Gasket, Re-Assembling The Gas Manifold With Gas Pipe, Pilot Gas Pipe And Oil Guns, Fixing Back The Same To Original Position Of The Burner And Connecting All The (Auxilliary Connections) Old Hoses After Proving Or With New Hoses, Flange Connections For Proper Alignment.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transp Ortation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H><U>Note</></>: (1) Refractory Repairs On The Regen Tiles & Ceramic Fiber Lining Inside Burner Housing Barrel, If Required Will Be Done By Cpcl. (2) The Rate For Sor Is For Dismantling, Servicing & Fixing Back All The Guns / Tips. , Carryout 214-F-01 Steam Reformer Burner Removal, Complete Servicingfixing Back. , <H>Shell Casing Welding Jobs</> , <H>Casing Plate Replacement / Insert Plate On Shell Casing / Duct - Carbon Steel</>Job Involves Cutting & Removal Of Old Casing Plate / Duct As Marked By Inspection, Cutting The New Plate To The Required Size, Edge Preparation, Bending It To The Desired Curvature, Providing Stiffeners / Supports, Fitting The Insert Plate In Position, Welding On All Four Sides, Dp Testing If Required.Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Materials From Owners Storage Point / Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , Casing Plate Replacement - Filletwelding - Carbon Steel. , Insert Plate Welding - Butt Weld - Carbon Steel. , <H>Patch Plate Welding - Carbon Steel</> , <H>Patch Plate Welding - Carbon Steel - Using E 6013 Electrodes</>The Job Includes Collection & Transportation Of Required Materials From Owners Storage Point, Marking To The Required Size, Cutting, Bending To The Desired Curvature Wherever Required, Edge Preparation, Fit Up & Fillet Welding On All Four Sides Using E 6013Electrodes, Flushing The Finished Weld Surface By Grinding And Offering Dpt At All Grades & Elevations.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H><U>Note</></>: (1) The Above Rates Are Applicable For All External Welding Jobs And Internal Welding Jobs In Heat Exchangers Using E 6013 / E 7018 Electrodes As Applicable. , Patch Plate Welding - Carbon Steel - Upto 6 Mm Thickness Using E 6013 Electrodes. , Patch Plate Welding - Carbon Steel - 8Mmthickness Using E 6013 Electrodes. , Patch Plate Welding - Carbon Steel - 10 Mm Thickness Using E 6013 Electrodes. , Patch Plate Welding - Carbon Steel - 12 Mm Thickness Using E 6013 Electrodes. , <H>Cutting / Fabrication Work</> , <H>Plate Rolling</>The Job Includes Spreading The Required Plate For Marking,Cutting,Marking Of Plates, Edge Preparation, Chipping, Shifting Of Plate To Rolling Machine, Rolling Of Plates Including Transportation And Shifting Of Rolled Plates To Work Site.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects, Transportation Of Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H><U>Note</></>: (1) The Contractor Can Have The Rolling Facility Made Available Inside The Refinery Premises Or Shall Get The Job Done Through His Sub-Contractor Outside The Refinery Premises.In Case Oftransportation Involved To Shift The Plates Outside The Refinery Premises, The Cost Of Transportation At Actuals Shall Be Paid Additionally As Per Eic. (2) The Finished Rolled Plate Dimensions Shall Be Taken For Measurement Purposes. (3) Cutting Of Plates On Sides After Rolling Is Included In The Above Scope Of Work And There Is No Additional Payment. However, Rates For Cutting Shall Be Paid Additionally, In Case The Required Size Of Plates Are Cut From A Bigger Size Plate Provided By Cpcl.<H><U>Note</></>: (1) Dp Test Shall Be Done By Cpcl. , <H>Plate Rolling Cs/As - Upto 1500 Mm Dia.</> , Plate Rolling - Carbon Steel / Alloy Steel - 3Mm To 5 Mm Thickness. , Plate Rolling - Carbon Steel / Alloy Steel - 6 To 10 Mm Thickness. , <H>Plate Rolling Cs/As - Above 1500 Mm Dia.</> , Plate Rolling - Carbon Steel / Alloy Steel - 3Mm To 5 Mm Thickness. , Plate Rolling - Carbon Steel / Alloy Steel - 6 To 10 Mm Thickness. , <H>Plate Rolling - Ss - Upto 1500 Mm Dia.</> , Plate Rolling - Stainless Steel- 3 Mm To 5 Mm Thickness. , Plate Rolling - Stainless Steel - 6 Mm To 10 Mm Thickness. , <H>Plate Rolling - Ss - More Than 1500 Mm Dia.</> , Plate Rolling - Stainless Steel- 3 Mm To 5 Mm Thickness. , Plate Rolling - Stainless Steel - 6 Mm To 10 Mm Thickness. , <H>Gas Cutting Of Plates- Carbon Steel / Alloy Steel</>The Job Includes Gas Cutting Of Carbon Steel / Alloy Steel Plates At All Heights & Grades Including Area Preparation For Hot Work.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, Gas, All Consumables And Labour To Complete The Job In All Respects And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , Gas Cutting Of Plates - Carbon Steel / Alloy Steel - Thickness Upto 6 Mm. , Gas Cutting Of Plates-Carbon Steel / Alloy Steel-Thickness 8 Mm. , Gas Cutting Of Plates-Carbon Steel/Alloy Steel-Thickness 10 Mm. , <H>Cutting Of Stainless Steel Plates - By Grinding</>The Job Includes Cutting Of Ss Plates By Grinding Wheel At All Heights & Grades Including Area Preparation For Hot Work.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , Cutting Of Plate-Stainless Steel-Thickness Above 2 Mm & Upto 4 Mm. , Cutting Of Plate-Stainless Steel-Thickness Above 4 Mm & Upto 6 Mm. , <H>Fillet Welding</> , <H>Fillet Welding - Carbon Steel (Using E-6013 Electrode)</>The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Grinding, Fillet Welding On Plate Surfaces Using E 6013 Electrodes At All Grades & Elevations.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , Fillet Welding - Carbon Steel - 5 To 6 Mm Thickness Using E 6013 Electrodes. , Fillet Welding - Carbon Steel - 8 Mm Thickness Using E 6013 Electrodes. , <H>Fillet Welding - Stainless Steel</>The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Grinding, Fillet Welding On Plate Surfaces Using Suitable Stainless Steel Electrodes At All Grades & Elevations.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , Fillet Welding - Stainless Steel - Upto 4Mm Thicknessusing Electrodes Of Grades - E - 308, 308H, 308L, 347 - Inside Columns & Vessels. , Fillet Welding - Stainless Steel - Upto 4Mm Mm Thicknessusing Electrodes Of Grades - E - 309, 309 Mo, 316, 316L - Inside Columns & Vessels. , <H>Fabrication & Erection Of Structurals:(<U>For Pipe Supportjobs</>). <U>As Per Eil Std:7-44-0621-Rev-2</>.</>The Job Includes Fabrication And Erection Of Carbon Steel Structurals In Position Such As Platforms, Ladders, Stairs, Brackets, <H><U>Pipe Supports</></>, Pipe Shoe, Using The Structural Materials Like Angles, Flats, Channels, Beams, Rounds, Plates Etc. At All Grades & Elevations.The Job Also Includes Transportation Of The Required Structural Materials From Owners Storage Point To Worksite, Cutting To The Required Size, Bolting And / Or Welding Of Joints Etc. As Per Drawings, Specifications & Instructions Of Eic And Preparing The Area For Hot Work.The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H><U>Note</></>: (1) For Scaffolding Work Wherever Required, Rates Shall Be Paid Separately As Per Sor. , <H>Fabrication And Erection Of Structurals</> , Fabrication And Erection Of Structurals. , <H>Dismantling & Removal Of Structurals / Gratings</>The Job Involves Removal Of Existing Above Ground, Overhead Structurals Including Platforms, Ladders, Gi & Steel Gratings By Unfastening / Coldcutting / Gas Cutting / Grinding, Etc., From Various Locations At All Grades & Elevations Without Damaging Any Other Portion Of The Existing Unit, Lowering Down The Same To Ground Level, Transportation Of The Same To The Designated Area Or Scrap Yard As Per The Instructions Of Engineer-In-Charge Including Weighment Of The Material At The Appropriate Place Within The Refinery Premises, If Required.The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects.<H><U>Note</></>: (1) For Scaffolding Work Wherever Required, Rates Shall Be Paid Separately As Per Sor. , <H>Dismantling & Removal Of Structurals / Gratings</> , Dismantling & Removal Of Structurals / Gratings. , <H>Erection And Welding Of Platform / Ladder Gratings:</>The Job Includes Erection & Welding Of Gratings In Position Under The Support Structure In Columns, Vessels, Tanks, Staircase, Platforms, Step Ladders, Etc., At All Grades & Elevations With Necessary Corrections At Work Site On The Supplied Grating To Fit To The Site Requirements.The Job Also Includes Transportation Of The Required Structural Materials From Owners Storage Point To Worksite, Cutting To The Required Size, Bolting And / Or Welding Of Joints Etc. As Per Drawings, Specifications & Instructions Of Eic And Preparing The Area For Hot Work.The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions. , <H>Erection And Welding Of Gratings</> , Erection And Welding Of Gratings Upto 15 M Elevation. , Erection And Welding Of Gratings Above 15 M Elevation. , <H>Carbon Steel Piping Work - Above Ground</>The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication, Laying, Welding & Erection Of Carbon Steel Piping At All Locations Above Ground Level, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles, Providing Tappings From The Existing Pipelines At All Grades & Elevations Including Under Road Culverts.The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling, Etc.,All Types Of Flanges Like Slip On / Raised Face, Etc., All Types Of Inline Instruments Like Rotameter / Pressure Gauges / Thermowells, Etc., Valves, Expansion Joints, Steam Traps, Orifice Assemblies, Strainers, Vents, Drains, Funnels, Etc., Of Different Schedules, Pressure Ratings And For Various Temperature Applications.The Piping Job Includes Providing Shoe Supports, Pads At Support Locations, Reinforcement Pads, Etc., Wherever Required.The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Socket, Fillet, Butt Welding Using E 6010 / E 6013 / E 7018 Electrodes / Er 70S2 Filler Wire As Required, Post Weld Heat Treatment (Pwht - Stress Relieving) After Welding Wherever Required, Dpt Wherever Required,Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest.The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To The Designated Area As Per Eic Instructions.<H>The Rates For The Following Items Shall Be Exclusive Of Blinding & Deblinding, Radiography, Stress Relieving, Reinforcement Pad Welding, Removal Of Old Piping For Replacement And Erection & Removal Of Scaffolding.</><H>The Rates For The Following Items Shall Be Inclusive Of Fabrication, Laying, Erection, Welding, Providing Shoe Supports, Pads At Support Locations, Flushing Of The Piping System, Offering Stagewise Inspection, Hydrotesting And Draining / Drying Of The Piping System.</><H>With Cpcl Supply Of Free Power & Contractors Welding Machine. </> , <H>Socket Welding - All Elevations</> , Carbon Steel - Above Ground Piping - Socket / Fillet Welding Joint - With Hydrotest. , Carbon Steel - Above Ground Piping - Socket / Fillet Welding Joint - Without Hydrotest. , <H>Butt Welding - Above Ground Level - Using Er-70S2 Filler Wire / E-7018 Electrodes</> , Carbon Steel - Above Ground Piping - Butt Welding Joint - Upto 8.8 Mm Thickness - With Hydrotest (Root Er-70S2 / Filling E-7018). , Carbon Steel - Above Ground Piping - Butt Welding Joint - Above 8.8 Mm And Upto 12.7 Mm Thickness - With Hydrotest (Root Er-70S2 / Filling E-7018). , <H>Carbon Steel Under Ground Piping</> <H>Butt Welding - Upto 8.8 Mm Piping Thickness</> , Carbon Steel - Underground Piping - Butt Welding Joint - Upto 8.8 Mm Piping Thickness -With Two Times Hydro / Pneumatic Testing. , Carbon Steel - Underground Piping - Butt Welding Joint - Upto 8.8 Mm Piping Thickness -With One Hydro / Pneumatic Testing. , <H>Alloy Steel Piping Work - Above Ground</>The Job Includes Transporation Of All Free Issue Materials From Owners Storage Point To Work Site, Handling At Site, Cutting, Bevelling, Fabrication, Laying, Welding & Erection Of Alloy Steel Piping Above Ground Level At All Locations, Overhead, Over Sleepers, Piperacks, Crossovers, Pipe Sleeves, Trenches, Stand Posts, Connecting With Equipments & Nozzles, Providing Tappings From The Existing Pipelines At All Grades & Elevations Including Under Road Culverts.The Piping Job Includes All Modification And Replacement Jobs Involving Pipes & All Types Of Fittings Like Elbows / Tees / Reducers / Half Coupling / Full Coupling, Etc.,All Types Of Flanges Like Slip On / Raised Face, Etc., All Types Of Inline Instruments Like Rotameter / Pressure Gauges / Thermowells, Etc., Valves, Expansion Joints, Steam Traps, Orifice Assemblies, Strainers, Vents, Drains, Funnels, Etc., Of Different Schedules, Pressure Ratings And For Various Temperature Applications.The Piping Job Includes Providing Shoe Supports, Pads At Support Locations, Reinforcement Pads, Etc., Wherever Required.The Job Includes Flushing, Preparing Work Area For Executing Hot Work, Bending To Suit The Contours Wherever Required, Socket, Fillet, Butt Welding Using Tig Welding Process For Root Run Followed By Manual Arc Welding Process For The Filling Passes With Relevant Filler Wires / Electrodes As Required With Necessary Pre-Heating Prior To Welding, Dpt Wherever Required, Post Weld Heat Treatment (Pwht - Stress Relieving) After Welding, Hydraulic / Pneumatic Test As Per Codes, Specification, Drawings And Draining Of Water & Drying With Compressor Air After Hydrotest.The Job Also Includes Supplying Of All Types Of Tools & Tackles,Lifting Arrangements Like Chain Pulley Blocks, Machineries, All Consumables And Labour To Complete The Job In All Respects, Returning Back The Unused Materials To Owners Storage Point And Dumping The Generated Scrap Material To Designated Area As Per Eic Instructions.<H>The Rates For The Following Items Shall Be Exclusive Of Blinding & Deblinding, Reinforcement Pad Welding,Radiography , Removal Of Old Piping For Replacement And Erection & Removal Of Scaffolding. </><H>The Rates For The Following Items Shall Be Inclusive Of Fabrication, Laying, Erection, Preheating, Welding,100% Stress Relieving Of Joints,Providing Shoe Supports, Pads At Support Locations, Flushing Of The Piping System, Offering Stagewise Inspection, Hydrotesting And Draining / Drying Of The Piping System.</><H>With Cpcl Supply Of Free Power & Contractors Welding Machine. </> , <H>Socket Welding - All Elevations - Alloy Steel</> , Alloy Steel - Above Ground Piping - Socket / Fillet Welding Joint Usingalloy Welding Filler Wire / Electrode Upto P5 Grades - With Hydrotest. , <H>Butt Welding - Upto 5 Metres From Ground Level - Alloy Steel</> , Alloy Steel -Above Ground Piping - Butt Welding Joint Using Alloy Welding Filler Wire / Electrode Upto P5 Grades - Upto 8.8 Mm Piping Thickness - With Hydrotest. , Alloy Steel -Above Ground Piping - Butt Welding Joint Using Alloy Welding Filler Wire / Electrode Upto P5 Grades - Above 8.8 Mm And Upto 12.7 Mm Piping Thickness - With Hydrotest. , <H>Concrete Breaking / Road Cutting /Earth Work Excavation & Back Filling For Laying Or Removal Of Underground Piping / Dewatering</> , <H>Earth Work Excavation & Back Filling</>The Job Involves Earth Work Excavation Below Ground Level Upto 2 Metres Depth & To A Required Width For Laying Underground Piping In All Types Of Soils Including Removal Of Vegetation, If Required, Dressing Of Sides, Levelling, Grading, Ramming Of Bottom, Back Filling On Completion Of Laying Of Pipes With Available Excavated Soil, Watering, Rolling, Ramming Of By Manual Methods / Mechanical Compactors, Dressing, Trimming, Etc.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , Earth Work Excavation & Back Filling - Upto 2 Metres Depth. , <H>Concrete Dismantling (Plain And Reinforced)</>Demolishing Plain Cement Concrete In Foundation And Super Structure Including Disposal Of Unserviceable Material Upto 3Km Lead As Directedand Serviceable Materials To Stores Including Scaffolding, All Labour, Tools Supervision, Safety Permits, Safety Precaution Etc. Complete.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables And Labour To Complete The Job In All Respects As Per Eic Instructions. , <H>Dismantling Plain Cement Concrete (Pcc).</>The Job Involves Dismantling Of Reinforced Cement Concrete Pavements Includingcuttingofreinforcement Bars, Returning Of Scrapsteelsto Designated Area, Breaking The Rcc Work Into Piecesand Disposal Of Unserviceable Material Upto 3.0Km Lead As Directed , Etc. As Per The Direction Of The Engineer-In-Charge. , <H>Dismantling Reinforced Cement Concrete (Rcc).</> , <H>Wrapping And Coating Of Vessels/ Underground Piping Etc</> , <H>Carryout Wrapping And Coating Of Under Ground Cbd Pipeline As Per Eilspec: 6-65-0032</> , Supply And Application Of Wrapping And Coating On 50 Mm Nb Pipe. , Supply And Application Of Wrapping And Coating On 80 Mm Nb Pipe. , Supply And Application Of Wrapping And Coating On 100 Mm Nb Pipe. , <H>Stress Relieving -For Carbon Steel Welding Job</>The Job Involves Post Weld Heat Treatment (Pwht) / Stress Relieving Of Carbon Steel / Alloy Steel Metal Surfaces, Weld Seams Or Haz, Etc., Shop Fabricated Or Site Fabricated Or Existing Piping / Static Equipment At All Grades & Elevation.The Job Also Includes Cleaning The Adjoining Surfaces, Welding Of Required Thermocouples, Insulating The Portion Using Super Fine Glass Wool / Asbestos Tape, Heating The Metal Surface Using A Induction Heating Equipment As Per The Requirement, Ensuring Uniform Temperature Attainment At All Points, Recording The Temperatures By Means Of Thermocouples / Pyrometer / Automatic Temperature Recorders Suitably Calibrated, Removal Of Insulation, Providing Assitance For Hardness Testing, Submitting Recorded Charts For Approval, Removal & Dressing Of Thermocouple Leads, Etc., As Per The Instructions Of Eic.The Job Also Includes Supplying Of All Types Of Tools & Tackles, Machineries, All Consumables, Labour & Supervision To Complete The Job In All Respects Including Transportation Of All The Required Materials To The Work Site. , Stress Relieving - Pipe Weld Joints. , <H>Close Proximity Radiography</>The Contractor Shall Carryout Close Proximity Radiography Jobs At The Location As Instructed By The Eicin Plants- 1 & 2 During Refienry-1 M &I Shutdown-2019. , Radiography Se-75 Cpr With Equivalent Shielding And Accessories. <H><U>(Unitea = 24 Hours Per Day)</></>. , Upto 2Inch Dia. Elliptical Shot. <H><U>(Unit Ea = Per Exposure)</></>. , 4Inch Film Width. <H><U>(Unit Ea = Per Inch Length Of Film)</></>. , <H>Man Power Supply For Inspection Assistance & Miscellaneous Jobs </> , Provide Semi Skilled Man Power Assistance For 12 Hrs Shift Basis Shutting Down / Start Up Assistance & Miscellaneous Jobsas Per Eic Instruction.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Carryout Maintenance jobs in reformer in Plant 214 and Piping replacement jobs in Plant 211 during Refinery III M & I Shutdown – August 2021
Sl. No. Item Description
1CARRYOUT MAINTENANCE JOBS IN REFORMER IN
2CARRYOUT MAINTENANCE JOBS IN REFORMER IN PLANT-214 AND PIPING REPLACEMENT JOBS IN PLANT-211 DURING REFINERY-3 M&I SHUTDOWN-AUG-2021.
3SUPPLY, ERECTION & DISMANTLING OF STEEL SCAFFOLDING-The job includes supply, transportaiton of scaffolding materials is in contractors scope of supply , erection of scaffolding at site covering the areas specified including providing vertical posts of pipes at inter distance of 1.5m and horizontal numbers at a inter distance of 0.5 to 0.75 meter, providing rods at corners to give sufficient strength to the structure, placing thesteel planks / FRP gratings on top for making sufficient area. Dismantling scaffolding after completion of job.Necessary quantity of scaffolding pipes at various lengths, rolling / fixed clamps, metal jolleyincluding all tools, tackles, consumables, labours and contractor"s supervision to be mobilised for completion of the jobs scope.NOTE: i) For measurement in SQM : 2( Length + Width) x height area covered by the scaffolding is to be taken. ii) Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs.Remarks: (i) Mode of measurement for the above items shall be in meter square. Measurement shall be taken as 2 times length + bredth multiplied by height. This shall be applicable for outside of the confined space. (ii) For scaffolding erected from any platform,height of the scaffolding shall be taken from the platform i.e platform shall be taken as zero meter level. (iii) In addition to above for any other locations the measurement of EIC shall be final and binding to contractor. (iv) Erection of scaffolding and removal / dismantling of the same scaffolding after completion of job shall be considered as completed job. No separate payment for removal of scaffolding shall be made.
4Supply, Scaffolding Erection & Dismantling (External)
5Up to 6m height.
6Above 6 m up to 10 m height.
7Above 10 m up to 20 m height.
8Above 20 m up to 30 m height.
9Above 30 m up to 40 m height.
10Above 40m up to 50m height.
11intermediate platform.
12Supply,Scaffolding Erection & Dismantling (Internal scaffolding)- For Reformer 214
13Erection & dismatlingof scaffolding inside the Reformer.
14BLINDING AND DE-BLINDINGThe job includes collection & transportation of required quantity of materials like blinds, gaskets, fasteners, etc., from owner"s storage point, loosening & tightening of studs (cold / gas cutting if required), wedge opening, cleaning of flanges, insertions andremoval of blind & gaskets, providing new gaskets after removal of blinds, overhauling of fasteners using oil, replacing the defective studs / nuts to ensure zero leak of joints including hot bolting.The job also includes supplying of all types of tools & tackles, l ifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.NOTE: (1) Nominal diameter of the flanges shall be taken for all measurements. (2) In case of either one of the activity like Blinding or de-blinding arise, 50% of the applicable rate shall be paid for the single activity. (3)This rate will be applicable only for the pipeline replcement job / modification jobs only. For all other jobs bliding & deblinding is included inlumpsum.
15Blinding and deblinding for 150# & 300# ratings:
16Blinding & Deblinding - Size Upto1-1/2 inch dia.
17Blinding & Deblinding - Size 2 inch dia. to 5 inch dia.
18Blinding & Deblinding - Size 6 inch dia. to 10 inch dia.
19Blinding & Deblinding - Size 12 inch dia. to 16 inch dia.
20Blinding & Deblinding - Size 18 inch dia. to 24 inch dia.
21Blinding & Deblinding - Size 36 inch dia to 48 inch dia.
22REMOVAL / INSTALLATION / REFIXING OF FLANGED VALVESThe job includes removal of flanged valves at all grades & elevations by de-bolting / cold cutting / gas cutting and transportation of the valve to the maintenance valve shop or any other designated place inside the refinery premises for repair / disposal.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.
23Valve rating - 150# & 300#
24Removal of valves - Size 2 inch dia. to 3 inch dia.
25Removal of valves - Size 4 inch dia. to 6 inch dia.
26Installation of Flanged valves (Other than safety valves)The job includes transportation of valves, gaskets, fasteners, etc., from the owner"s storage point or valve maintenance shop, cleaning, checking, tightening the gland, greasing & freeing up etc., servicing of all the fasteners using oil, replacing with new fasteners wherever required, hydrotesting the valve if required, at the specified pressure at valve maintenance shop,installation of flanged valve at all heights & grades using proper gaskets & studs.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, dumping the generated scrap material to the designated area, all consumables and labour to complete the job in all respects.
27Valve rating - 150# & 300#
28Installation of valves - Size 2 inch dia. to 3 inch dia.
29Installation of valves - Size 4 inch dia. to 6 inch dia.
30REMOVAL & REFIXING OF FLANGED SAFETY VALVESThe job includes removal of flanged safety valves at all grades & elevations by de-bolting / cold cutting / gas cutting, providing a temporary blind flange at the inlet & outlet of safety valve, providing identification mark on the safety valve with a tag and transportation of the valve to the maintenance valve shop for servicing / testing.The job also includes transportation of safety valves from maintenance valve shop after servicing & testing, servicing of all the fasteners using oil, replacing with new fasteners wherever required, installation of the safety valve at all heights & grades using proper gaskets & studs.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of required materials like gaskets & fasteners from owner"s storage point, transportation of unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.
31Valve rating - 150# &300# - Above 15 metres elevation from ground level
32Removal & re-fixing of Safety / relief vavles - Size Above 6 inch dia. & upto 10 inch dia.
33OPENING & BOXING OF MANWAYS / COVERS / PANELS /The job involves opening of furnace manways, covection panels, header box covers, header plugs, etc., by de-bolting (cold / gas cutting if required), cleaning, and finally boxing up with proper gasket, packing, servicing of bolts & nuts, replacing defective bolts / nuts to ensure zero leak of joints including hot bolting.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, etc., machineries, all consumables and labour to complete the job in all respects, transportation of material from owner"s storage point to the work site & unused materials back to the storage point and dumping the generated scrap material to the designated area as per EIC instructions.
34Opening and boxing up
35Opening and boxing up of Manways.
36Opening and boxing up of Convection panels.
37Opening and boxing up of Header box covers.
38BURNERS
39Burner Assembly /Air register / burner manifold - ServicingThe job involves disconnection of all piping connected to the burners, dropping fuel gas manifold, pilot gas riser pipe and oil guns, dropping the entire assembly of the burner (with identification marks) with or without Air register depending on the type of burner, covering the burner opening of the bottom plate / plenum plate / burner housing barrel using Aluminium sheet, cleaning the burner assembly, servicing of primary & secondary air registers, disassembling the oil tip, atomiser, and cleaning & blowing the same with steam, replacement of damaged burner tips & oil gun if required, straightening of flapper wherever required.The job also involves replacement of studs / ceramic fibre lining in the wind box, replacement of regen tiles if required and checking the movement of the system and offering to Maintenance / Mfg. personnel, removing the aluminium sheet, boxing up the total burner assembly by providing proper gasket, re-assembling the gas manifold with gas pipe, pilot gas pipe and oil guns, fixing back the same to original position of the burner and connecting all the (auxilliary connections) old hoses after proving or with new hoses, flange connections for proper alignment.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transp ortation of unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.NOTE: (1) Refractory repairs on the regen tiles & ceramic fiber lining inside burner housing barrel, if required will be done by CPCL. (2) The rate for SOR is for dismantling, servicing & fixing back all the guns / tips.
40Carryout 214-F-01 Steam reformer burner removal, complete servicingfixing back.
41SHELL CASING WELDING JOBS
42Casing plate replacement / Insert plate on Shell casing / duct - Carbon steelJob involves cutting & removal of old casing plate / duct as marked by Inspection, cutting the new plate to the required size, edge preparation, bending it to the desired curvature, providing stiffeners / supports, fitting the insert plate in position, welding on all four sides, DP testing if required.Job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of materials from owner"s storage point / unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.
43Casing plate replacement - Filletwelding - Carbon steel.
44Insert plate welding - Butt Weld - Carbon steel.
45Patch plate welding - Carbon steel
46Patch plate welding - Carbon steel - using E 6013 electrodesThe job includes collection & transportation of required materials from owner"s storage point, marking to the required size, cutting, bending to the desired curvature wherever required, edge preparation, fit up & fillet welding on all four sides using E 6013electrodes, flushing the finished weld surface by grinding and offering DPT at all grades & elevations.The job also includes supplying of all types of tools & tackles, lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.NOTE: (1) The above rates are applicable for all external welding jobs and internal welding jobs in heat exchangers using E 6013 / E 7018 electrodes as applicable.
47Patch plate welding - Carbon steel - Upto 6 mm thickness using E 6013 electrodes.
48Patch plate welding - Carbon steel - 8mmthickness using E 6013 electrodes.
49Patch plate welding - Carbon steel - 10 mm thickness using E 6013 electrodes.
50Patch plate welding - Carbon steel - 12 mm thickness using E 6013 electrodes.
51CUTTING / FABRICATION WORK
52Plate RollingThe job includes spreading the required plate for marking,cutting,marking of plates, edge preparation, chipping, shifting of plate to rolling machine, rolling of plates including transportation and shifting of rolled plates to work site.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects, transportation of unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.NOTE: (1) The contractor can have the rolling facility made available inside the refinery premises or shall get the job done through his sub-contractor outside the refinery premises.In case oftransportation involved to shift the plates outside the refinery premises, the cost of transportation at actuals shall be paid additionally as per EIC. (2) The finished rolled plate dimensions shall be taken for measurement purposes. (3) Cutting of plates on sides after rolling is included in the above scope of work and there is no additional payment. However, rates for cutting shall be paid additionally, in case the required size of plates are cut from a bigger size plate provided by CPCL.NOTE: (1) DP Test shall be done by CPCL.
53Plate rolling CS/AS - upto 1500 mm dia.
54Plate Rolling - Carbon steel / Alloy Steel - 3mm to 5 mm thickness.
55Plate Rolling - Carbon steel / Alloy Steel - 6 to 10 mm thickness.
56Plate rolling CS/AS - above 1500 mm dia.
57Plate Rolling - Carbon steel / Alloy Steel - 3mm to 5 mm thickness.
58Plate Rolling - Carbon steel / Alloy Steel - 6 to 10 mm thickness.
59Plate rolling - SS - Upto 1500 mm dia.
60Plate Rolling - Stainless steel- 3 mm to 5 mm thickness.
61Plate Rolling - Stainless steel - 6 mm to 10 mm thickness.
62Plate rolling - SS - More than 1500 mm dia.
63Plate Rolling - Stainless steel- 3 mm to 5 mm thickness.
64Plate Rolling - Stainless steel - 6 mm to 10 mm thickness.
65Gas Cutting of Plates- Carbon Steel / Alloy steelThe job includes gas cutting of carbon steel / Alloy steel plates at all heights & grades including area preparation for hot work.The job also includes supplying of all types of tools & tackles, machineries, gas, all consumables and labour to complete the job in all respects and dumping the generated scrap material to designated area as per EIC instructions.
66Gas Cutting of Plates - Carbon Steel / Alloy steel - Thickness upto 6 mm.
67Gas Cutting of Plates-Carbon Steel / Alloy steel-Thickness 8 mm.
68Gas Cutting of Plates-Carbon Steel/Alloy steel-Thickness 10 mm.
69Cutting of Stainless steel Plates - By grindingThe job includes cutting of SS plates by grinding wheel at all heights & grades including area preparation for hot work.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects and dumping the generated scrap material to designated area as per EIC instructions.
70Cutting of Plate-Stainless steel-Thickness Above 2 mm & upto 4 mm.
71Cutting of Plate-Stainless steel-Thickness Above 4 mm & upto 6 mm.
72FILLET WELDING
73Fillet welding - Carbon Steel (Using E-6013 Electrode)The job includes flushing, preparing work area for executing hot work, grinding, fillet welding on plate surfaces using E 6013 electrodes at all grades & elevations.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
74Fillet welding - Carbon Steel - 5 to 6 mm thickness using E 6013 electrodes.
75Fillet welding - Carbon Steel - 8 mm thickness using E 6013 electrodes.
76Fillet welding - Stainless steelThe job includes flushing, preparing work area for executing hot work, grinding, fillet welding on plate surfaces using suitable stainless steel electrodes at all grades & elevations.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
77Fillet welding - Stainless steel - Upto 4mm thicknessusing electrodes of grades - E - 308, 308H, 308L, 347 - Inside columns & vessels.
78Fillet welding - Stainless steel - Upto 4mm mm thicknessusing electrodes of grades - E - 309, 309 Mo, 316, 316L - Inside Columns & Vessels.
79Fabrication & erection of structurals:(For pipe Supportjobs). As per EIL Std:7-44-0621-Rev-2.The job includes fabrication and erection of carbon steel structurals in position such as platforms, ladders, stairs, brackets, pipe supports, pipe shoe, using the structural materials like angles, flats, channels, beams, rounds, plates etc. at all grades & elevations.The job also includes transportation of the required structural materials from owner"s storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.The job also includes supplying of all types of tools & tackles,lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.NOTE: (1) For scaffolding work wherever required, rates shall be paid separately as per SOR.
80Fabrication and erection of structurals
81Fabrication and erection of structurals.
82Dismantling & Removal of Structurals / GratingsThe job involves removal of existing above ground, overhead structurals including platforms, ladders, GI & steel gratings by unfastening / coldcutting / gas cutting / grinding, etc., from various locations at all grades & elevations without damaging any other portion of the existing unit, lowering down the same to ground level, transportation of the same to the designated area or scrap yard as per the instructions of Engineer-in-charge including weighment of the material at the appropriate place within the refinery premises, if required.The job also includes supplying of all types of tools & tackles,lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects.NOTE: (1) For scaffolding work wherever required, rates shall be paid separately as per SOR.
83Dismantling & Removal of Structurals / Gratings
84Dismantling & Removal of Structurals / Gratings.
85Erection and welding of Platform / ladder gratings:The job includes erection & welding of gratings in position under the support structure in columns, vessels, tanks, staircase, platforms, step ladders, etc., at all grades & elevations with necessary corrections at work site on the supplied grating to fit to the site requirements.The job also includes transportation of the required structural materials from owner"s storage point to worksite, cutting to the required size, bolting and / or welding of joints etc. as per drawings, specifications & instructions of EIC and preparing the area for hot work.The job also includes supplying of all types of tools & tackles,lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.
86Erection and welding of Gratings
87Erection and welding of Gratings upto 15 m elevation.
88Erection and welding of Gratings above 15 m elevation.
89Carbon Steel Piping Work - Above groundThe job includes transporation of all free issue materials from owner"s storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of carbon steel piping at all locations above ground level, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts.The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc.,all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications.The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using E 6010 / E 6013 / E 7018 electrodes / ER 70S2 filler wire as required, Post weld heat treatment (PWHT - stress relieving) after welding wherever required, DPT wherever required,hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.The job also includes supplying of all types of tools & tackles,lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner"s storage point and dumping the generated scrap material to the designated area as per EIC instructions.The rates for the following items shall be exclusive of blinding & deblinding, radiography, stress relieving, reinforcement pad welding, removal of old piping for replacement and erection & removal of scaffolding.The rates for the following items shall be inclusive of fabrication, laying, erection, welding, providing shoe supports, pads at support locations, flushing of the piping system, offering stagewise inspection, hydrotesting and draining / drying of the piping system.WITH CPCL SUPPLY OF FREE POWER & CONTRACTOR"S WELDING MACHINE.
90SOCKET WELDING - ALL ELEVATIONS
91Carbon Steel - Above ground Piping - Socket / fillet welding Joint - With Hydrotest.
92Carbon Steel - Above ground Piping - Socket / fillet welding Joint - Without Hydrotest.
93BUTT WELDING - Above GROUND LEVEL - USING ER-70S2 Filler wire / E-7018 ELECTRODES
94Carbon Steel - Above ground Piping - Butt welding Joint - Upto 8.8 mm thickness - With hydrotest (Root ER-70S2 / Filling E-7018).
95Carbon Steel - Above ground Piping - Butt welding Joint - Above 8.8 mm and upto 12.7 mm thickness - With hydrotest (Root ER-70S2 / Filling E-7018).
96CARBON STEEL UNDER GROUND PIPING BUTT WELDING - UPTO 8.8 mm PIPING THICKNESS
97Carbon Steel - Underground Piping - Butt welding Joint - Upto 8.8 mm piping thickness -With two times Hydro / pneumatic testing.
98Carbon Steel - Underground Piping - Butt welding Joint - Upto 8.8 mm piping thickness -With one Hydro / pneumatic testing.
99Alloy Steel Piping Work - Above groundThe job includes transporation of all free issue materials from owner"s storage point to work site, handling at site, cutting, bevelling, fabrication, laying, welding & erection of alloy steel piping above ground level at all locations, overhead, over sleepers, piperacks, crossovers, pipe sleeves, trenches, stand posts, connecting with equipments & nozzles, providing tappings from the existing pipelines at all grades & elevations including under road culverts.The piping job includes all modification and replacement jobs involving pipes & all types of fittings like elbows / tees / reducers / half coupling / full coupling, etc.,all types of flanges like slip on / raised face, etc., all types of inline instruments like rotameter / pressure gauges / thermowells, etc., valves, expansion joints, steam traps, orifice assemblies, strainers, vents, drains, funnels, etc., of different schedules, pressure ratings and for various temperature applications.The piping job includes providing shoe supports, pads at support locations, reinforcement pads, etc., wherever required.The job includes flushing, preparing work area for executing hot work, bending to suit the contours wherever required, socket, fillet, butt welding using TIG welding process for root run followed by manual arc welding process for the filling passes with relevant filler wires / electrodes as required with necessary pre-heating prior to welding, DPT wherever required, Post weld heat treatment (PWHT - stress relieving) after welding, hydraulic / pneumatic test as per codes, specification, drawings and draining of water & drying with compressor air after hydrotest.The job also includes supplying of all types of tools & tackles,lifting arrangements like chain pulley blocks, machineries, all consumables and labour to complete the job in all respects, returning back the unused materials to owner"s storage point and dumping the generated scrap material to designated area as per EIC instructions.The rates for the following items shall be exclusive of blinding & deblinding, reinforcement pad welding,radiography , removal of old piping for replacement and erection & removal of scaffolding. The rates for the following items shall be inclusive of fabrication, laying, erection, preheating, welding,100% stress relieving of joints,providing shoe supports, pads at support locations, flushing of the piping system, offering stagewise inspection, hydrotesting and draining / drying of the piping system.WITH CPCL SUPPLY OF FREE POWER & CONTRACTOR"S WELDING MACHINE.
100SOCKET WELDING - ALL ELEVATIONS - ALLOY STEEL
101Alloy Steel - Above ground Piping - Socket / fillet welding Joint usingalloy welding filler wire / electrode upto P5 grades - With hydrotest.
102BUTT WELDING - UPTO 5 METRES FROM GROUND LEVEL - ALLOY STEEL
103Alloy Steel -Above ground Piping - Butt welding Joint using alloy welding filler wire / electrode upto P5 grades - Upto 8.8 mm piping thickness - with hydrotest.
104Alloy Steel -Above ground Piping - Butt welding Joint using alloy welding filler wire / electrode upto P5 grades - above 8.8 mm and upto 12.7 mm piping thickness - with hydrotest.
105Concrete breaking / Road cutting /Earth work excavation & back filling for laying or removal of underground piping / Dewatering
106Earth work excavation & back fillingThe job involves earth work excavation below ground level upto 2 metres depth & to a required width for laying underground piping in all types of soils including removal of vegetation, if required, dressing of sides, levelling, grading, ramming of bottom, back filling on completion of laying of pipes with available excavated soil, watering, rolling, ramming of by manual methods / mechanical compactors, dressing, trimming, etc.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
107Earth work excavation & back filling - Upto 2 metres depth.
108Concrete dismantling (PLAIN and REINFORCED)Demolishing plain cement concrete in foundation and super structure including disposal of unserviceable material upto 3KM lead as directedand serviceable materials to stores including scaffolding, all labour, tools supervision, safety permits, safety precaution etc. complete.The job also includes supplying of all types of tools & tackles, machineries, all consumables and labour to complete the job in all respects as per EIC instructions.
109Dismantling Plain cement concrete (PCC).The job involves dismantling of reinforced cement concrete pavements includingcuttingofreinforcement bars, returning of scrapsteelsto designated area, breaking the RCC work into piecesand disposal of unserviceable material upto 3.0km lead as directed , etc. as per the direction of the Engineer-in-charge.
110Dismantling Reinforced cement concrete (RCC).
111WRAPPING and COATING OF VESSELS/ UNDERGROUND PIPING ETC
112Carryout wrapping and coating of under ground CBD pipeline as per EILspec: 6-65-0032
113Supply and application of wrapping and coating on 50 mm NB pipe.
114Supply and application of wrapping and coating on 80 mm NB pipe.
115Supply and application of wrapping and coating on 100 mm NB pipe.
116STRESS RELIEVING -For Carbon steel welding jobThe job involves Post weld heat treatment (PWHT) / Stress relieving of carbon steel / alloy steel metal surfaces, weld seams or HAZ, etc., shop fabricated or site fabricated or existing piping / static equipment at all grades & elevation.The job also includes cleaning the adjoining surfaces, welding of required thermocouples, insulating the portion using super fine glass wool / asbestos tape, heating the metal surface using a induction heating equipment as per the requirement, ensuring uniform temperature attainment at all points, recording the temperatures by means of thermocouples / pyrometer / automatic temperature recorders suitably calibrated, removal of insulation, providing assitance for hardness testing, submitting recorded charts for approval, removal & dressing of thermocouple leads, etc., as per the instructions of EIC.The job also includes supplying of all types of tools & tackles, machineries, all consumables, labour & supervision to complete the job in all respects including transportation of all the required materials to the work site.
117Stress Relieving - Pipe weld joints.
118Close Proximity RadiographyThe contractor shall carryout Close Proximity Radiography jobs at the location as instructed by the EICin Plants- 1 & 2 during Refienry-1 M &I Shutdown-2019.
119Radiography Se-75 CPR with equivalent shielding and accessories. (UnitEA = 24 hours per day).
120Upto 2inch Dia. Elliptical shot. (Unit EA = Per Exposure).
1214inch Film Width. (Unit EA = Per inch length of film).
122Man power supply for Inspection assistance & miscellaneous jobs
123Provide semi skilled man power assistance for 12 hrs shift basis Shutting down / Start up assistance & miscellaneous jobsas per EIC instruction.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail