Providing And Laying Premix Carpet On Road From Bifurcation Point ( Near Khairi Bridge ) To Water Filtration Plant At Chelly Colony Banikhet Distt Chamba Providing And Laying Premix Carpet On Road From Bifurcation Point ( Near Khairi Bridge )
Tender Overview
Project Description
Providing And Laying Premix Carpet On Road From Bifurcation Point ( Near Khairi Bridge ) To Water Filtration Plant At Chelly Colony Banikhet Distt Chamba Providing And Laying Premix Carpet On Road From Bifurcation Point ( Near Khairi Bridge ) To Water Filtration Plant At Chelly Colony, Banikhet Distt Chamba
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Aug-2021 | Corrigendum-I | Technical Bid | 31-Aug-2021 |
| 2 | 31-Aug-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 07-Sep-2021 |
| 3 | 10-Sep-2021 | CORRIGENDUM-II | Date | 17-Sep-2021 |
| 4 | 18-Sep-2021 | Corrigendum-III | Date | 23-Sep-2021 |
| 5 | 23-Sep-2021 | Corrigendumum IV | Date | 27-Sep-2021 |
BOQ
| Sl. No. | Item Description |
| 1 | Surface dressing on old surface with hot bitumen of grade VG - 10 of approved quality using 1.95 kg of bitumen per sqm with 1.50 cum of stone chippings 11.2 mm nominal size per 100 sqm of road surface, including consolidation with road roller of 6 to 8 tonne capacity, etc. complete. |
| 2 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.With rapid setting bitumen emulsion On bituminous surface @ 0.25kg/sqm |
| 3 | 2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt |
| 4 | Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents