|
| 1 | SH-I Service support engineer charges for maintaining IT Infrastructure |
| 2 | Service support with 1 Engineer on 24 X 7 X 365 Days – Round the clock (minimum 3 shifts per day) basis for ACTIVE NETWORK |
| 3 | Service support with 1 Engineer on 24 X 7 X 365 Days- Round the clock(minimum 3 shifts per day) basis for PASSIVE CABLING |
| 4 | One (01) Support Staff for (Active and passive) in General Shift |
| 5 | Sub Head- II |
| 6 | Supply of SM OFC. |
| 7 | Supply of SM OFC 24 Port LIU with accessories (Fully loaded adapters connectors and other accessories) |
| 8 | Supply of 3meter Fiber optic patch Cord (SC-LC/ LC-LC or in line with requirements) |
| 9 | Supply of Cat 6A cable-- 66 Boxes (305 mtrs. Per Box) or 40 Boxes (500 Mtrs) |
| 10 | Cat 6A UTP Information Outlet with Faceplate & Box set |
| 11 | Supply of RJ-45 connector |
| 12 | Supply of Wall Mount 12U Rack |
| 13 | Supply of Power Distribution Unit 5/15 Amp |
| 14 | Supply of 1.5” Casing and Capping |
| 15 | Supply of 25mm, ISI Certified Chemical Resistant PVC Conduit:[Other Specifications: Max. Service Temperature 140°F with De-Rating Factor of 0.50, Pressure Ratings 120 - 810psi] |
| 16 | Supply of 25MM, ISI certified MS conduit |
| 17 | Supply of 32mm ISI Certified Stress Crack Resistance PE100 HDPE Pipe.[Other Specifications: Density of 940.0 to 958.0 KG/M3, Melt Flow Rate of 0.2to1.1 g/10 Mins, Carbon Black Content of 2.5 + 0.5%, Heat Reversion of 3%, Pressure Grade of PN16 (Green), Thermal Conductivity of 0.4 W/MK] |
| 18 | Sub Head- III |
| 19 | Laying, Testing of Single Mode 6 core Fiber cable on surface/wall/false ceiling or terrace as required (inclusive of fixtures) |
| 20 | Laying, Testing of CAT 6, 4-Pair UTP cable (cable laying / relay/ Removing through PVC conduits, casing and capping etc.) |
| 21 | Installation charges PVC pipe / PVC Channel / GI pipe for Laying of OFC / UTP (inclusive of fixtures) |
| 22 | Fixing of 32mm ISI Certified Stress Crack Resistance PE100 HDPE on wall including fixtures |
| 23 | Installation charges MS conduit for Laying of OFC /UTP (inclusive of fixtures) |
| 24 | Fixing of I/O on surface and termination of UTP CAT 6 cable on I/O as per Industry Standard TSB 568 A/B |
| 25 | Installation charges for LIU |
| 26 | Fiber to Pigtail splicing & testing including manpower etc./ per core |
| 27 | Floor Cutting & Resurfacing- Granite/ marble/Tiles/RCC |
| 28 | Soft Soil digging upto 1.5 Mtrs and resurfacing |
| 29 | Hard Soil digging upto depth 1.5 Mtrs and resurfacing. |