Consultancy Services For Carrying Out Feasibility Study And Detailed Project Report For Construction Of Rcc Artificial Tunnel With Earth Cushion After Reclaiming The Damaged Nh From Km 347 / 250 To Km 347 / 510 On Nh-22 ( New Nh-05 ) In The Stat, Rampur-Himachal Pradesh

Ministry Of Road Transport And Highways has published Consultancy Services For Carrying Out Feasibility Study And Detailed Project Report For Construction Of Rcc Artificial Tunnel With Earth Cushion After Reclaiming The Damaged Nh From Km 347 / 250 To Km 347 / 510 On Nh-22 ( New Nh-05 ) In The Stat. Submission Date for this Tender is 04-09-2021. Feasibility Studies Tenders in Rampur Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28782638
Consultancy Services For Carrying Out Feasibility Study And Detailed Project Report For Construction Of Rcc Artificial Tunnel With Earth Cushion After Reclaiming The Damaged Nh From Km 347 / 250 To Km 347 / 510 On Nh-22 ( New Nh-05 ) In The Stat
Open Tender
Indian
Himachal Pradesh
Rampur
04-09-2021

Tender Details

Consultancy Services For Carrying Out Feasibility Study And Detailed Project Report For Construction Of Rcc Artificial Tunnel With Earth Cushion After Reclaiming The Damaged Nh From Km 347 / 250 To Km 347 / 510 On Nh-22 ( New Nh-05 ) In The State Of Himach Consultancy Services For Carrying Out Feasibility Study And Detailed Project Report For Construction Of Rcc Artificial Tunnel With Earth Cushion After Reclaiming The Damaged Nh From Km 347 / 250 To Km 347 / 510 On Nh-22 ( New Nh-05 ) In The State Of Himach

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of work: Consultancy Services for Carrying out Feasibility Study and Detailed Project Report for construction of RCC artificial Tunnel with earth cushion after reclaiming the damaged NH from Km 347/250 to km 347/510 on NH-22( New NH-05) in the State of Himachal Pradesh.
Sl. No. Item Description
1Remuneration for Local Staff (inclusive of per diem allowance)
2Team Leader cum Senior TunnelEngineer
3Tunnel Design Expert
4Senior Geophysicist
5Senior GeoTechnicalEngineer
6Senior E & M Expert
7Senior Geologist
8Environment Specialist
9Material Engineer
10Highway cum, Pavement Engineer
11Quantity Surveyor cum Documentation expert
12Senior Survey Engineer
13Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
14Position
15Position
16Position
17Position
18Position
19Position
20Position
21Support Staff (inclusive of per diem allowance) Note: To be assessed by consultant as per requirement of assignment
22Office Manager
23Typist
24Office Boy
25Night Watchman
26Transportation (Fixed Costs)
27The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
28Duty Travel to Site (Fixed Costs)
29Trips
30Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
31Office Rent
32Office Supplies, Utilities and Communication (Fixed Costs)
33Office Supplies drafting
34Supplies Computer
35Running Costs
36Domestic and International Communication
37Office Furniture and Equipment (Rental)
38Office Furniture and Equipment
39Reports and Document Printing
40Monthly Report (3 copies per month)
41Inception Report & QAP
42Environment and Social Impact Screening Report
43Draft Feasibility Report
44Final Feasibility Report including GIR, GBR and GFR
45Strip Plan with L.A. Reports
46Draft LA and Clearances I Report
47Final LA and Clearances I Report
48Draft Environmental Assessment report& RAP
49Final Environmental Assessment report& RAP
50Draft Detailed Design Report & Drawings etc. Draft EMP
51Draft Bidding Documents
52Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
53Final Bidding Documents
54Draft 3(a), 3(A) and 3(D) notification for land acquisition(3 copies each)
55LA & Clearances II Report
56Survey and Investigation A. Topographical Survey (Fixed Rate)
57Topographic Survey including hire charges for equipmentand supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
58Detailed topographic Surveys using Mobile/Aerial LiDAR or better technology
59Investigation (Fixed cost)(lumpsum)
60Road and Bridge Inventory
61FWD test and Pavement Evaluation
62Roughness Survey
63Axle Load Survey
64Material Survey And Investigation
65Sub grade Investigation
66Traffic Survey
67Socio-economic and Census Survey/Studies
68Land Acquisition Studies
69Any other investigations/surveys
70Sub-Soil Investigation (Boring) (Rate/m)
71a) In soil other than hard rock
72b) In hard rock
73Network survey and GPR
74Network survey of the existing highways as a repository for civil work as per directions from authority
75GPR survey for detection of underground utilities
76Fixing Boundary pillars
77Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/orconstruction of New Bypasses, Consultant shall fixboundarypillarsalongtheproposedalignmentontheextreme boundary on either side of the project Highway at 50 m interval
78Land Acquisition Team including support staff and logistics/transportation
79Ex-Land Revenue Inspector/Officer or equivalent(1 No.)
80Ex-Kanoogo/Girdwar or equivalent (1 No.)
81Ex-Patwari or equivalent(1 No.)
82Typist (2 nos.)
83Peon
84Logistics for Land acquisition Team
85Computer including necessary peripherals (2 nos.)
86Printers (2 nos.)
87Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
88Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder)
89Position (Value= 0)
90Position (Value= 0)
91Position (Value= 0)
92Position (Value= 0)
93Position (Value= 0)
94Position (Value= 0)
95Position (Value= 0)
96Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns)
97Position (Value= 0)
98Position (Value= 0)
99Position (Value= 0)
100Position (Value= 0)
101Position (Value= 0)
102Position (Value= 0)
103Moblization and Demoblization-Inland Travel in Home country (Fixed Costs)
104Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail