Brahmapur Development Authority has published Construction Of Childrens Play Ground Over Beda Open Space Layout No 3132/24.08.2001 In Front Of Maa Saraswati Sisu Bidya Mandir At Andhapasara Road Mouza Puruna Brahmapur Brahmapur Works. Submission Date for this Tender is 21-08-2021. Playground Construction Tenders in BRAHMAPUR Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Children"s Playgroundover BeDA open space Lay-outNo:-3132 dt.24.08.2001 |
2 | Earthwork in excavation of foundation in all kinds of soil with 5 km leadby mechanical means including loading and unloading from trucks etc. and filling the earthin the lower area of the town |
3 | Providing, supplying, fillingin foundation and plinth with sand including watering and ramming etc. complete |
4 | Cement Concrete 1:4:8 using 40mm size BHG metal of approved qualityin foundation concrete including watering curing with cost of all material, labour, T&P, taxes, royalty etc. complete |
5 | Cement Concrete soli blockmachine mix and hydraulically compressed having crushing strength not less than 75 kg/sq cm with masonry 1:6 in Foundation and plinth including cost of all material, labour, T&P, taxes, Royalty, scaffolding etc. complete |
6 | Brick workwith fly ash bricks 23 cmx 11 cm xcmsize having crushing strenth not less than 75 kg/sq cm with dimensional tolerance +2 o/o masonary 1:6 in superstructer including cost of all material, labour, T&P, Taxes, royalty, scaffolding etc.complete |
7 | M-20 grade cement Concrete work using 20 mm size graded BHG CB chips including cost of material, labour, T&P etc. complete. |
8 | Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawingand Technical Specifications |
9 | 12 mm thick Cement plaster in 1:6 mix , finished smooth including cost of all Material lobour, T&P ect complete |
10 | 16 mm thick cement plaster using 1:6 cement mortar over brickwork finished smooth with all cost of material labour, T&P, etc complete |
11 | Transportation of selected earth from borrowing area and rolling with PRR for levelling the grounded, complete with minimum 5 km leadand as per direction of Engineer-in-charge |
12 | Spplying, Fitting & Fixing of revolving MS grill for the entrance with 25 mm hollow pipe frame with 1 mm thick with all cost of material, labour, T&P etc complete as per direction of EIC. |
13 | Wall painting two coats with paintis plastic emulssion exterior paint of approved shade on new works including all cost of material, labour, T&P etc complete |
14 | Supplying, fitting and fixing of FRP bench with cost of material, labour, T&P, taxes and necessary foundation if required |
15 | Supplying, fitting and fising of double swing with cost of material, labour, T&P, Taxes and necessary foundations if required Price Rate of Arihant company |
16 | Painting one coat with any approved primer including cost of primer & labour taxes etc. complete |
17 | Painting two coats with any approved paint including cost of primer & labour taxes etc. complete |
18 | Provision for site cleaning, pre and post photograph of work site, display board with details of name of the work, Estimated cost, Head of account and innaugural / foundation stone, other unfoeseen items etc. complete |
19 | Supply and installation of Smart, Integrared Solar all-in-one street light with 140lume / w , MPTT charge Controller, tilteble LED Panel, adjustable A10 mounting angle, mono crystalline soar panel, PIR motion censor system wattage 30, solar panel 75, Battery 12.8v30AH |
20 | Supply of 5 mtr height, 5 inch dia, GI(avarage dia tappered from bottom to top), tubuiar pole and at the bottom one base plate of size 30 x 30 x 5 mm having a through hole of size 14 mm dia at the centre of the base pate with required nuts & bolts with pole top cap |
21 | Painting of Tubular pole with arms with one coat of red oxide primer and two coats of alluminium paint and bottom one mtr with black paint with supply of paints and labour |
22 | Lobour charges towards installation of 5 mtr height stret tubular pole including concreting of poles base and couplingwith supply of concreting materials as per following specifications, planting depth 1.5 mtrpole pit size 1.2 x 1.2 x 1.8 m concreting 1:4:8 with 4 cm HG metal size and couping of standard size into 40 cmx 40 cm x 50 cm with cement concreting 1:2:4 using 20 mm BHCBG chips.This includes the cost of concreting materials, labour and hie charges of all T&P materials. The pole is to be installed in proper alignment as per the direction of Engineer-in-charge, and enclosed drawings and specifications. |