Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Wsss Of Phe Mechanical Sub-Division Pampore ( District Pulwama ) -1 Providing, Fitting And Testing Of Copper Thimbles At Site 2 1. 10 Sq. M, Awantipora-Jammu And Kashmir

Public Health Engineering Department-PHED has published Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Wsss Of Phe Mechanical Sub-Division Pampore ( District Pulwama ) -1 Providing, Fitting And Testing Of Copper Thimbles At Site 2 1. 10 Sq. M. Submission Date for this Tender is 26-08-2021. Wrenches and Drivers Tenders in Awantipora Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

28755768
Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Wsss Of Phe Mechanical Sub-Division Pampore ( District Pulwama ) -1 Providing, Fitting And Testing Of Copper Thimbles At Site 2 1. 10 Sq. M
Open Tender
Indian
Jammu And Kashmir
Awantipora
26-08-2021

Tender Details

Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Wsss Of Phe Mechanical Sub-Division Pampore ( District Pulwama ) -1 Providing, Fitting And Testing Of Copper Thimbles At Site 2 1. 10 Sq. Mm 3 2. 16 Sq. Mm 4 3. 25 Sq. Mm 5 4. 50 Sq. Mm 6 5. 90 Sq. Mm 7 6. 120 Sq. Mm 8 7. 150 Sq. Mm 9 Providing, Fitting And Testing Of Aluminum Thimbles At Site 10 1. 10 Sq. Mm 11 2. 16 Sq. Mm 12 3. 25 Sq. Mm 13 4. 50 Sq. Mm 14 5. 90 Sq. Mm 15 6. 120 Sq. Mm 16 7. 150 Sq. Mm 17 Providing, Fitting Of Below Mentioned Item For Repairs To 25Kva To 50 Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 18 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 19 Bush Rod With Porcelain Insulator And Packing 20 Rewinding / Re-Taping / Re-Insulation Of Coils 21 T-Oil 22 Copper Strip 23 Filtration / Dehydration Of T-Oil 24 Cost Of Scrap Copper Dismattled Windings 25 Cost Of Damaged Lamination 26 Providing, Fitting Of Below Mentioned Item For Repairs To 50Kva -100 Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 27 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 28 Bush Rod With Porcelain Insulator And Packing 29 Rewinding / Re-Taping / Re-Insulation Of Coils 30 T-Oil 31 Copper Strip 32 Filtration / Dehydration Of T-Oil 33 Cost Of Scrap Copper Dismattled Windings 34 Cost Of Damaged Lamination 35 Providing, Fitting Of Below Mentioned Item For Repairs To 100 Kva - Below 150 Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 36 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 37 Bush Rod With Porcelain Insulator And Packing 38 Rewinding / Re-Taping / Re-Insulation Of Coils 39 T-Oil 40 Copper Strip 41 Filtration / Dehydration Of T-Oil 42 Cost Of Scrap Copper Dismattled Windings 43 Cost Of Damaged Lamination 44 Providing, Fitting Of Below Mentioned Item For Repairs To 150 Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 45 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 46 Bush Rod With Porcelain Insulator And Packing 47 Rewinding / Re-Taping / Re-Insulation Of Coils 48 T-Oil 49 Copper Strip 50 Filtration / Dehydration Of T-Oil 51 Cost Of Scrap Copper Dismattled Windings 52 Cost Of Damaged Lamination 53 Providing, Fitting Of Below Mentioned Item For Repairs To 200Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 54 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 55 Bush Rod With Porcelain Insulator And Packing 56 Rewinding / Re-Taping / Re-Insulation Of Coils 57 T-Oil 58 Copper Strip 59 Filtration / Dehydration Of T-Oil 60 Cost Of Scrap Copper Dismattled Windings 61 Cost Of Damaged Lamination 62 Providing, Fitting Of Below Mentioned Item For Repairs To 250Kva Voltage Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 63 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 64 Bush Rod With Porcelain Insulator And Packing 65 Rewinding / Re-Taping / Re-Insulation Of Coils 66 T-Oil 67 Copper Strip 68 Filtration / Dehydration Of T-Oil 69 Cost Of Scrap Copper Dismattled Windings 70 Cost Of Damaged Lamination 71 Providing, Fitting Of Below Mentioned Item For Repairs To Voltage Regulator ( Plate Type Switch ) Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 72 1. 150Mmx150mm 73 2. 225Mm X 225Mm 74 3. 200Mm X 200Mm 75 4. 250Mm X 250Mm 76 1. 300Mmx300mm 77 2. 350Mm X 350Mm 78 3. 400Mm X 400Mm 79 4. 450Mm X 450Mm 80 Providing, Fitting Of Below Mentioned Item For Repairs To Voltage Regulator ( Drum Type Switch ) Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 81 1. 32A 82 2. 63A 83 3. 100A 84 4. 200A 85 Providing, Fitting And Testing Of Voltmeters At Site 86 Analog 0-200V 87 Analog 0-500V 88 Digital 0-500V 89 Providing, Fitting And Testing Of Ammeters At Site 90 1. 0-50A With Ct Ratio Of 5 / 50 Analog 91 2. 0-100A With Ct Ratio Of 5 / 100 Analog 92 3. 0-150A With Ct Ratio Of 5 / 150 Analog 93 4. 0-200A With Ct Ratio Of 5 / 200 Analog 94 0-200A Digital 95 Providing, Fitting And Testing Of Post Type Drop Out Set Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 96 Suitable For 25Kva Ss 97 Suitable For 63Kva Ss 98 Suitable For 100Kva Ss 99 Suitable For 250Kva Ss 100 Suitable For 400Kva Ss 101 Providing, Fitting And Testing Of Link Set Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 102 Suitable For 25Kva Ss 103 Suitable For 63Kva Ss 104 Suitable For 100Kva Ss 105 Suitable For 250Kva Ss 106 Suitable For 400Kva Ss 107 Providing, Fitting And Testing Of Submersible Copper Cables Of Below Mentioned Specifications Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 108 1. 10 Sq Mm 109 2. 16 Sq Mm 110 3. 25 Sq Mm 111 3. 35 Sq Mm 112 Providing, Fitting And Testing Of Copper Cables Of Below Mentioned Specifications Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 113 1. 19 / 0.0064 114 2. 37 / 0.083 115 3. 61 / 0.093 116 4. 19 / 0.044 117 7 / 16.00 118 Providing, Fitting And Testing Of 3.5 Core Xlpe Aluminum Conductor Of Below Mentioned Specifications Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 119 1. 35 Sq. Mm 120 2. 50 Sq. Mm 121 3. 70 Sq. Mm 122 3. 95 Sq. Mm 123 4. 120 Sq. Mm 124 5. 185 Sq. Mm 125 Providing, Fitting And Testing Of 11Kv Post Type Lightening Arrestor Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 126 Providing, Fitting And Testing Of G.O.D Set Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 127 Providing, Fitting And Testing Of Cross Arms Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 128 1. Channels 75X40 And Channels 100 X 50 129 2. Angle Iron Support 130 3. F-Top 131 4. U Clamps 132 5. Guy-Wire With Turn Buckle 133 6. Guy-Insulator 134 Providing, Fitting And Testing Of Acsr Conductor Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 135 1. 0.03 136 2. 0.05 137 Providing, Fitting And Testing Of Mccbs ( 04 Pole ) Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 138 63 Amps 139 100 Amps 140 125 Amps 141 160 Amps 142 200 Amps 143 250 Amps 144 320 Amps 145 400 Amps 146 630 Amps 147 Providing, Fitting And Testing Of Mccbs ( 03 Pole ) Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 148 63Amps 149 100Amps 150 125Amps 151 160Amps 152 200Amps 153 Providing, Fitting And Testing Of Change Over Switch Including Extraction Of Damaged Ones, Transportation, Loading, Unloading, Fitting And Successful Testing On No And Full Load At Site. 154 63 A 155 100 A 156 200 A 157 300 A 158 400 A 159 630 A 160 Providing, Fitting And Testing Of Combined Volt-Ammeter For Mu-G Starters 161 30A 162 60A 163 75A 164 100A 165 125A 166 Providing, Fitting And Testing Of 415V Indicating Lamps 167 Red / Yellow / Green 168 Providing, Fitting And Testing Of 415V Single Phase Preventor 169 Providing, Fitting And Testing Of Ml Contactors For Starters 170 Ml 1.5 171 Ml 2 172 Ml 3 173 Ml 4 174 Ml 6 175 Ml 10 176 Ml 12 177 Providing, Fitting And Testing Of Power Contactors For Fasd Starters 178 Lcif 400 179 Lcif 650 180 Lcif 350 181 Ck 95 Be-300 182 Mnx 185 183 Mnx 325 184 Ac3-25A 185 Ac3-32A 186 Ac3-40A 187 Ac3-50A 188 Mc X 70 189 Ac3- 60A 190 Ac3- 63A 191 Ac3- 80A 192 Ac3- 100A 193 Ac3- 115A 194 Ac3- 125A 195 Ac3- 150A 196 Ac3- 185A 197 Ac3- 200A 198 Providing, Fitting And Testing Of Ml Relays 199 Ml1 Range 4-6.5 200 Ml1 Range 6-10 201 Ml1 Range 10-16 202 Ml2 / Ml3 9-14 203 Ml2 / Ml3 13-21 204 Ml2 / Ml3 20-32 205 Ml2 / Ml3 28-42 206 Providing, Fitting And Testing Of Fasd Panel Accessories 207 Electronic Timer 0- 30Sec 208 Electronic Timer 0- 60Sec 209 Single Phase Preventer ( Three Phase Type ) 210 Overload Relay 4A-6A 211 Overload Relay 5A-8A 212 Overload Relay 6A-9A 213 Overload Relay 7A-10A 214 Overload Relay 9A-13A 215 Overload Relay 12A-16A 216 Overload Relay 14A-22A 217 Overload Relay 17A-25A 218 Overload Relay 23A-32A 219 Overload Relay 30A-40A 220 Overload Relay 37A-50A 221 Overload Relay 48A-65A 222 Overload Relay 55A-70A 223 Overload Relay 63A-80A 224 Overload Relay 80A-93A 225 Overload Relay 85A- 105A 226 Overload Relay 80A- 115A 227 Overload Relay 125A- 200A 228 Overload Relay 160A- 250A 229 Overload Relay 200A- 315A 230 Replacement Of Damaged 1 Sq Mm Copper Power Wiring 231 Providing, Fitting And Testing Of Ats Star Delta Starter 232 Pneumatic Timer ( On Delay / Off Delay ) 233 Electromagnetic Power Contactor Assembly ( 10A-250A ) 234 Providing, Fitting And Testing Of Contact Points For Star / Delta Starters 235 20Hp 236 30Hp 237 40Hp 238 50Hp 239 Providing, Fitting And Testing Of Terminal Block 240 30A-5 Way 241 60A-3Way 242 60A-6 Way 243 100A-3 Way 244 120A-3 Way 245 Providing, Fitting And Testing Of Power Contactor For Mu-G Starters 246 Mu-G10 247 Mu-G15 248 Mu-G20 249 Mu-G30 250 Mu-G40 251 Mu-G50 252 Mu-G75 253 Providing, Fitting And Testing Of Overload Relay / Under Voltage Relay / Single Phase Preventer / Timer For Mu-G Starters 254 Mu-G10 255 Mu-G15 256 Mu-G20 257 Mu-G30 258 Mu-G40 259 Mu-G50 260 Mu-G75 261 Providing, Fitting And Testing Of Single Phase Preventer / Timer For Mu-G Starters 262 Mu-G10 263 Mu-G15 264 Mu-G20 265 Mu-G30 266 Mu-G40 267 Mu-G50 268 Mu-G75 269 Providing And Fitting Of Air Circuit Breaker 800 Amp Manual Draw Out Type 270 Providing And Fitting Of Multi-Function Meter Square Dial Type 271 Providing, Fitting And Testing Of Motor Protection Circuit Breakers With Thermal Adjustable Ranges From 0-100 Amp 272 0-32 Amp ( 16 Steps ) 273 28-63 Amp ( 03 Steps ) 274 55-100 Amp ( 03 Steps ) 275 Nuts And Bolts Of Different Size 276 Selector Switch 277 Providing, Fitting Of Below Mentioned Item For Repairs To 10Kva To 50Kva Servo Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 278 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 279 Bush Rod With Porcelain Insulator And Packing 280 Rewinding / Re-Taping / Re-Insulation Of Coils 281 T-Oil 282 Copper Strip 283 Filtration / Dehydration Of T-Oil 284 Cost Of Scrap Copper Dismattled Windings 285 Replacement Of Digital Micro Controlled Processor Based Control Card 286 Replacement Of Ac Syncronous Servo Motor 287 Replacement Of Copper Wound Motorized Auto Transformer 288 Replacement Of Buck And Boost Series Transformer 289 Providing, Fitting Of Below Mentioned Item For Repairs To 50Kva To 100Kva Servo Stabilizer Including Extraction Of Damaged Items, Transportation, Loading, Unloading, Shifting Back And Then Fitting And Successful Testing On No And Full Load At Site. 290 Copper Wire Of Specific Gauge For Fabrication Of Primary / Secondary Coil 291 Bush Rod With Porcelain Insulator And Packing 292 Rewinding / Re-Taping / Re-Insulation Of Coils 293 T-Oil 294 Copper Strip 295 Filtration / Dehydration Of T-Oil 296 Cost Of Scrap Copper Dismattled Windings 297 Replacement Of Digital Micro Controlled Processor Based Control Card 298 Replacement Of Ac Syncronous Servo Motor 299 Replacement Of Copper Wound Motorized Auto Transformer 300 Providing, Fitting Of Outdoor Type Led Lamp 301 25Watt 302 45Watt 303 48Watt 304 50Watt 305 60Watt 306 90Watt 307 100Watt 308 120Watt 309 Repairs To Led Lights At Site By Way Of Replacing Strips 310 25Watt 311 45Watt 312 48Watt 313 50Watt 314 60Watt 315 90Watt 316 100Watt 317 120Watt 318 Erection Of Ms Tubular 9M / 11M Tilted Pole By Way Of Excavation Of New Trench And Concrete Bottoming Including Fitting / Fixing Of Departmental Acsr Conductor On The Insulators 319 Repairs To Vt Motor With Rating Above 50Hp To 150Hp ) Dismantling Of The Vt Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 320 Copper Wire Used In Rewinding The Motor. 321 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 322 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 323 Cost Of Scrap Copper Dismanttled Windings 324 Repairs To Horizontal Motor With Rating From 5Hp To 50Hpdismantling Of The Horizontal Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 325 Copper Wire Used In Rewinding The Motor. 326 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 327 Providing / Fitting Of Connection Platefor Horizontal Motors From 05Hp To 50 Hp 328 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 329 Cost Of Scrap Copper Dismanttled Windings 330 Repairs To Horizontal Motor With Rating Above 50Hp To 100Hp ) Dismantling Of The Horiontal Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 331 Copper Wire Used In Rewinding The Motor. 332 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 333 Providing / Fitting Of Connection Platefor Horizontal Motors From 05Hp To 50 Hp 334 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 335 Cost Of Scrap Copper Dismanttled Windings 336 Repairs To Borewell Submersible Motor With Rating From And Above 5Hp To 25Hpdismantling Of The Submersible Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 337 Copper Wire Used In Rewinding The Motor. 338 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 339 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 340 Cost Of Scrap Copper Dismanttled Windings 341 Cost For Replacement Of Thrust Bearing Racer Ratchet 342 Cost On Account Of Replacement Of Gun Metal Bushes 343 Repairs To Borewell Submersible Motor With Rating From And Above 25Hp To 50Hpdismantling Of The Submersible Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 344 Copper Wire Used In Rewinding The Motor. 345 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 346 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 347 Cost Of Scrap Copper Dismanttled Windings 348 Cost For Replacement Of Thrust Bearing Racer Ratchet 349 Cost On Account Of Replacement Of Gun Metal Bushes 350 Repairs To Borewell Submersible Motor With Rating From And Above 50Hp To 75Hpdismantling Of The Submersible Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 351 Copper Wire Used In Rewinding The Motor. 352 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 353 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 354 Cost Of Scrap Copper Dismanttled Windings 355 Cost For Replacement Of Thrust Bearing Racer Ratchet 356 Cost On Account Of Replacement Of Gun Metal Bushes 357 Repairs To Open Well Submersible Motor With Rating From And Above 5Hp To 25Hpdismantling Of The Submersible Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 358 Copper Wire Used In Rewinding The Motor. 359 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 360 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 361 Cost Of Scrap Copper Dismanttled Windings 362 Cost For Replacement Of Thrust Bearing Racer Ratchet / Mechanical Seal 363 Cost On Account Of Replacement Of Gun Metal Bushes / Bearings 364 Cost Of Cooling Oil 365 Repairs To Open Well Submersible Motor With Rating From And Above 25Hp To 50Hpdismantling Of The Submersible Motor At Site, Shifting To The Workshop, Repairing, Shifting Back To Site, Re-Fitting And Successfull Testing On Full Load. Job Includes Repairing / Fabrication And Providing / Replacement Of Following Items. 366 Copper Wire Used In Rewinding The Motor. 367 Rewinding, Skilled Labor, Insulated Paper And Sleeves Used During Rewinding And Testing Of Motor At Site. 368 Cost On Account Of Associated / Consumable Items Like Crimpled Paper, Sleeves, Pvc Paper, Bamboo Sticks, Thread, Varnish Etc 369 Cost Of Scrap Copper Dismanttled Windings 370 Cost For Replacement Of Thrust Bearing Racer Ratchet / Mechanical Seal 371 Cost On Account Of Replacement Of Gun Metal Bushes / Bearings 372 Cost Of Cooling Oil 373 Replacing Of Damages Illumination Single Core Multistranded Copper Wiring 374 Providing / Fitting Of Avr Relayto Dg Set As Per Sample ( 25 Kva To 62.5Kva ) 375 Providing / Fitting Of Avr Relay To Dg Set As Per Sample ( 62.5 Kva To 162.5Kva ) 376 Repair And Rewinding Of Dg Set Cooling Fan 377 Minor Repair To Wiring Of Dg Set 378 Providing / Fitting Of Battery Connection Leads With Copper Connectors 379 Replacing Of Damages Illumination Single Core Multistranded Copper Wiring 380 Replacement Of Damaged Electrification And Electrification Of Pump House Including Cost Of Channels / Conduits, Fitting Charges, Transportation And Testing On Load At Site 381 Lighting Points In 1.0Mm2 Copper Wire Including 5W Led Lamp 382 Heating Points In 2.5 Mm2 Copper Wire Including 16Amp Ss Combined 383 Providing Of 5W / 7W Led Lamp 384 Providing / Fitting Of Steel Coupling For Submersible Motors From 05Hp To 50 Hp Including Cotter 385 Repairs To The Rotor / Body, Fan, Shield Of Horizontal Motor 386 Repairs To Self / Dynamo Of Dg Set

Key Value

Document Fees
INR 500 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work:Fixing of rate contract for repairs/replacement to electrical equipment installed at different WSSs of PHE Mechanical Sub-Division PAMPORE (District Pulwama) for the financial year 2021-22
Sl. No. Item Description
1Providing, fitting and testing of Copper thimbles at site
21.     10 Sq. mm
32.     16 Sq. mm
43.     25 Sq. mm
54.     50 Sq. mm
65.     90 Sq. mm
76.     120 Sq. mm
87.     150 Sq. mm
9Providing, fitting and testing of Aluminum thimbles at site
101.     10 Sq. mm
112.     16 Sq. mm
123.     25 Sq. mm
134.     50 Sq. mm
145.     90 Sq. mm
156.     120 Sq. mm
167.     150 Sq. mm
17Providing, fitting of below mentioned item for repairs to 25KVA to 50 KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
18Copper wire of specific gauge for fabrication of primary / secondary coil
19Bush rod with porcelain insulator and packing
20Rewinding/Re-taping /re-insulation of coils
21T-Oil
22Copper strip
23Filtration / dehydration of T-oil
24Cost of scrap copper dismattled windings
25Cost of damaged lamination
26Providing, fitting of below mentioned item for repairs to 50KVA -100 KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
27Copper wire of specific gauge for fabrication of primary / secondary coil
28Bush rod with porcelain insulator and packing
29Rewinding/Re-taping /re-insulation of coils
30T-Oil
31Copper strip
32Filtration / dehydration of T-oil
33Cost of scrap copper dismattled windings
34Cost of damaged lamination
35Providing, fitting of below mentioned item for repairs to 100 KVA - below 150 KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
36Copper wire of specific gauge for fabrication of primary / secondary coil
37Bush rod with porcelain insulator and packing
38Rewinding/Re-taping /re-insulation of coils
39T-Oil
40Copper strip
41Filtration / dehydration of T-oil
42Cost of scrap copper dismattled windings
43Cost of damaged lamination
44Providing, fitting of below mentioned item for repairs to 150 KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
45Copper wire of specific gauge for fabrication of primary / secondary coil
46Bush rod with porcelain insulator and packing
47Rewinding/Re-taping /re-insulation of coils
48T-Oil
49Copper strip
50Filtration / dehydration of T-oil
51Cost of scrap copper dismattled windings
52Cost of damaged lamination
53Providing, fitting of below mentioned item for repairs to 200KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
54Copper wire of specific gauge for fabrication of primary / secondary coil
55Bush rod with porcelain insulator and packing
56Rewinding/Re-taping /re-insulation of coils
57T-Oil
58Copper strip
59Filtration / dehydration of T-oil
60Cost of scrap copper dismattled windings
61Cost of damaged lamination
62Providing, fitting of below mentioned item for repairs to 250KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
63Copper wire of specific gauge for fabrication of primary / secondary coil
64Bush rod with porcelain insulator and packing
65Rewinding/Re-taping /re-insulation of coils
66T-Oil
67Copper strip
68Filtration / dehydration of T-oil
69Cost of scrap copper dismattled windings
70Cost of damaged lamination
71Providing, fitting of below mentioned item for repairs to Voltage regulator (plate type switch) including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
721.     150mmx150mm
732.     225mm x 225mm
743.     200mm x 200mm
754.     250mm x 250mm
761.     300mmx300mm
772.     350mm x 350mm
783.     400mm x 400mm
794.     450mm x 450mm
80Providing, fitting of below mentioned item for repairs to Voltage regulator (drum type switch) including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
811.     32A
822.     63A
833.     100A
844.     200A
85Providing, fitting and testing of Voltmeters at site
86Analog 0-200V
87Analog 0-500V
88Digital 0-500V
89Providing, fitting and testing of Ammeters at site
901.     0-50A with CT ratio of 5/50 Analog
912.     0-100A with CT ratio of 5/100 Analog
923.     0-150A with CT ratio of 5/150 Analog
934.     0-200A with CT ratio of 5/200 Analog
940-200A Digital
95Providing, fitting and testing of post type drop out set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
96Suitable for 25KVA SS
97Suitable for 63KVA SS
98Suitable for 100KVA SS
99Suitable for 250KVA SS
100Suitable for 400KVA SS
101Providing, fitting and testing of link set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
102Suitable for 25KVA SS
103Suitable for 63KVA SS
104Suitable for 100KVA SS
105Suitable for 250KVA SS
106Suitable for 400KVA SS
107Providing, fitting and testing of submersible copper cables of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
1081.    10 sq mm
1092.    16 sq mm
1103.    25 sq mm
1113.    35 sq mm
112Providing, fitting and testing of copper cables of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
1131.   19/0.0064
1142.   37/0.083
1153.   61/0.093
1164.   19/0.044
1177/16.00
118Providing, fitting and testing of 3.5 core XLPE aluminum conductor of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
1191.    35 Sq. mm
1202.    50 Sq. mm
1213.    70 Sq. mm
1223.    95 Sq. mm
1234.    120 Sq. mm
1245.    185 Sq. mm
125Providing, fitting and testing of 11KV post type lightening arrestor including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
126Providing, fitting and testing of G.O.D set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
127Providing, fitting and testing of Cross arms including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
1281.    Channels 75x40 AND Channels 100 x 50
1292.    Angle iron support
1303.    F-top
1314.    U Clamps
1325.    Guy-wire with turn buckle
1336.    Guy-Insulator
134Providing, fitting and testing of ACSR Conductor including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
1351.    0.03
1362.    0.05
137Providing, fitting and testing of MCCBs (04 Pole) including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
13863 Amps
139100 Amps
140125 Amps
141160 Amps
142200 Amps
143250 Amps
144320 Amps
145400 Amps
146630 Amps
147Providing, fitting and testing of MCCBs (03 Pole) including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
14863amps
149100amps
150125amps
151160amps
152200Amps
153Providing, fitting and testing of Change over switch including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site.
15463 A
155100 A
156200 A
157300 A
158400 A
159630 A
160Providing, fitting and testing of Combined volt-ammeter for MU-G starters
16130A
16260A
16375A
164100A
165125A
166Providing, fitting and testing of 415V Indicating lamps
167Red/Yellow/Green
168Providing, fitting and testing of 415V Single phase preventor
169Providing, fitting and testing of ML contactors for starters
170ML 1.5
171ML 2
172ML 3
173ML 4
174ML 6
175ML 10
176ML 12
177Providing, fitting and testing of Power contactors for FASD starters
178LCIF 400
179LCIF 650
180LCIF 350
181CK 95 BE-300
182MNX 185
183MNX 325
184AC3-25A
185AC3-32A
186AC3-40A
187AC3-50A
188MC X 70
189AC3- 60A
190AC3- 63A
191AC3- 80A
192AC3- 100A
193AC3- 115A
194AC3- 125A
195AC3- 150A
196AC3- 185A
197AC3- 200A
198Providing, fitting and testing of ML relays
199ML1 range 4-6.5
200ML1 range 6-10
201ML1 range 10-16
202ML2/ML3 9-14
203ML2/ML3 13-21
204ML2/ML3 20-32
205ML2/ML3 28-42
206Providing, fitting and testing of FASD Panel accessories
207Electronic timer 0- 30Sec
208Electronic timer 0- 60Sec
209Single Phase Preventer(Three phase type )
210Overload relay 4A-6A
211Overload relay 5A-8A
212Overload relay 6A-9A
213Overload relay 7A-10A
214Overload relay 9A-13A
215Overload relay 12A-16A
216Overload relay 14A-22A
217Overload relay 17A-25A
218Overload relay 23A-32A
219Overload relay 30A-40A
220Overload relay 37A-50A
221Overload relay 48A-65A
222Overload relay 55A-70A
223Overload relay 63A-80A
224Overload relay 80A-93A
225Overload relay 85A- 105A
226Overload relay 80A- 115A
227Overload relay 125A- 200A
228Overload relay 160A- 250A
229Overload relay 200A- 315A
230Replacement of damaged 1 Sq mm copper power wiring
231Providing, fitting and testing of ATS star Delta starter
232Pneumatic timer (on delay/off delay)
233Electromagnetic power contactor assembly (10A-250A)
234Providing, fitting and testing of Contact points for star/delta starters
23520HP
23630HP
23740HP
23850HP
239Providing, fitting and testing of Terminal block
24030A-5 way
24160A-3way
24260A-6 way
243100A-3 way
244120A-3 way
245Providing, fitting and testing of Power contactor for MU-G starters
246MU-G10
247MU-G15
248MU-G20
249MU-G30
250MU-G40
251MU-G50
252MU-G75
253Providing, fitting and testing of Overload relay/under voltage relay/single phase preventer/Timer for MU-G starters
254MU-G10
255MU-G15
256MU-G20
257MU-G30
258MU-G40
259MU-G50
260MU-G75
261Providing, fitting and testing of single phase preventer/Timer for MU-G starters
262MU-G10
263MU-G15
264MU-G20
265MU-G30
266MU-G40
267MU-G50
268MU-G75
269Providing and fitting of Air Circuit breaker 800 amp Manual Draw out type
270Providing and fitting of Multi-Function Meter Square Dial type
271Providing, fitting and testing of Motor protection circuit breakers with thermal adjustable ranges from 0-100 amp
2720-32 Amp (16 steps)
27328-63 Amp (03 steps)
27455-100 Amp (03 steps)
275Nuts and bolts of different size
276Selector Switch
277Providing, fitting of below mentioned item for repairs to 10KVA to 50KVA Servo Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
278Copper wire of specific gauge for fabrication of primary / secondary coil
279Bush rod with porcelain insulator and packing
280Rewinding/Re-taping /re-insulation of coils
281T-Oil
282Copper strip
283Filtration / dehydration of T-oil
284Cost of scrap copper dismattled windings
285Replacement of digital micro controlled processor based control card
286Replacement of AC syncronous servo motor
287Replacement of copper wound motorized auto transformer
288Replacement of buck and boost series transformer
289Providing, fitting of below mentioned item for repairs to 50KVA to 100KVA Servo Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.
290Copper wire of specific gauge for fabrication of primary / secondary coil
291Bush rod with porcelain insulator and packing
292Rewinding/Re-taping /re-insulation of coils
293T-Oil
294Copper strip
295Filtration / dehydration of T-oil
296Cost of scrap copper dismattled windings
297Replacement of digital micro controlled processor based control card
298Replacement of AC syncronous servo motor
299Replacement of copper wound motorized auto transformer
300Providing, fitting of Outdoor type LED Lamp
30125Watt
30245Watt
30348Watt
30450Watt
30560Watt
30690Watt
307100Watt
308120Watt
309Repairs to LED lights at site by way of replacing strips
31025Watt
31145Watt
31248Watt
31350Watt
31460Watt
31590Watt
316100Watt
317120Watt
318Erection of MS tubular 9m/11m tilted pole by way of excavation of new trench and concrete bottoming including fitting/fixing of Departmental ACSR conductor on the insulators
319Repairs to VT Motor with rating above 50HP to 150HP) Dismantling of the VT motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
320Copper wire used in rewinding the motor.
321Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
322Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
323Cost of scrap copper dismanttled windings
324Repairs to horizontal Motor with rating from 5HP to 50HP Dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
325Copper wire used in rewinding the motor.
326Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
327Providing/fitting of connection platefor Horizontal motors from 05HP to 50 HP
328Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
329Cost of scrap copper dismanttled windings
330Repairs to horizontal Motor with rating above 50HP to 100HP) Dismantling of the horiontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
331Copper wire used in rewinding the motor.
332Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
333Providing/fitting of connection platefor Horizontal motors from 05HP to 50 HP
334Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
335Cost of scrap copper dismanttled windings
336Repairs to borewell submersible Motor with rating from and above 5HP to 25HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
337Copper wire used in rewinding the motor.
338Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
339Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
340Cost of scrap copper dismanttled windings
341Cost for replacement of thrust bearing Racer Ratchet
342Cost on account of replacement of gun metal bushes
343Repairs to borewell submersible Motor with rating from and above 25HP to 50HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
344Copper wire used in rewinding the motor.
345Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
346Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
347Cost of scrap copper dismanttled windings
348Cost for replacement of thrust bearing Racer Ratchet
349Cost on account of replacement of gun metal bushes
350Repairs to borewell submersible Motor with rating from and above 50HP to 75HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
351Copper wire used in rewinding the motor.
352Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
353Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
354Cost of scrap copper dismanttled windings
355Cost for replacement of thrust bearing Racer Ratchet
356Cost on account of replacement of gun metal bushes
357Repairs to open well submersible Motor with rating from and above 5HP to 25HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
358Copper wire used in rewinding the motor.
359Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
360Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
361Cost of scrap copper dismanttled windings
362Cost for replacement of thrust bearing Racer Ratchet/ Mechanical Seal
363Cost on account of replacement of gun metal bushes/Bearings
364Cost of Cooling Oil
365Repairs to open well submersible Motor with rating from and above 25HP to 50HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items.
366Copper wire used in rewinding the motor.
367Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site.
368Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc
369Cost of scrap copper dismanttled windings
370Cost for replacement of thrust bearing Racer Ratchet/ Mechanical Seal
371Cost on account of replacement of gun metal bushes/Bearings
372Cost of Cooling Oil
373Replacing of damages illumination single core multistranded copper wiring
374Providing/fitting of AVR Relayto DG set as per sample (25 KVA to 62.5KVA)
375Providing/fitting of AVR Relay to DG set as per sample (62.5 KVA to 162.5KVA)
376Repair and rewinding of DG set cooling fan
377Minor Repair to wiring of DG Set
378Providing/fitting of Battery connection leads with copper connectors
379Replacing of damages illumination single core multistranded copper wiring
380Replacement of damaged electrification and electrification of pump house including cost of channels/conduits, fitting charges, transportation and testing on load at site
381Lighting points in 1.0mm2 copper wire including 5W LED lamp
382Heating points in 2.5 mm2 copper wire including 16Amp SS combined
383Providing of 5W/7W LED lamp
384Providing/fitting of Steel coupling for submersible motors from 05HP to 50 HP including cotter
385Repairs to the rotor/body, fan, shield of Horizontal motor
386Repairs to self / Dynamo of DG set
387Note: The Scrap Value mentioned above shall be deducted from the total valve of BOQ to arrive at value without scrap. The value thus attained shall be again deducted by total scrap value to get the effective amount on BOQ for ascertainingoverall L1. Unless specified, the old material shall be returned to divisional/sub divisional store
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail