Cost Of Construction Of 35 Nos. Of Permanent Cairns Using 50 Percentage Of Locally Collected Hardstones At Cherumanali, Valiyamanali Areas In Kallar Section Of Palode Range Cost Of Construction Of 35 Nos. Of Permanent Cairns Using 50 Percentage Of Locall
Tender Overview
Project Description
Cost Of Construction Of 35 Nos. Of Permanent Cairns Using 50 Percentage Of Locally Collected Hardstones At Cherumanali, Valiyamanali Areas In Kallar Section Of Palode Range Cost Of Construction Of 35 Nos. Of Permanent Cairns Using 50 Percentage Of Locally Collected Hardstones At Cherumanali, Valiyamanali Areas In Kallar Section Of Palode Range
BOQ
| Sl. No. | Item Description |
| 1 | Clearing the jungle including uprooting of rank Vegetation, grass, brushwood, trees and saplings a girth up to 30 an measured at a hight of 1M above ground level and removal of rubbish up to a 50M outside the philiphery of the area cleared (2.31) |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means our areas (excluding 30cm in depth,1.50m in width as well as 10 m2 on lan) indlucing disposal of excavtor earth, level upto 50m and lift upto 1.50m, disposal erth to be leveled and newatly dressed all kinds of soil (2.8.1) |
| 3 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6 etc complete as per the direction of departmental officers(7.1.1) with head loads of stone average 400 m |
| 4 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6 etc complete as per the direction of departmental officers(7.1.1) with head loads of stone average 400 m |
| 5 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. (13.9.1) |
| 6 | Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement. (13.9.1) |
| 7 | Pointing stone work with CM 1:3 (13.33.2) |
| 8 | Pointing stone work with CM 1:3 (13.33.2) |
| 9 | GST - 12% |
| 10 | Unforeseen items |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender