| 1 | P/Laying P.V.C./XLPE insulated & P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor of IS:1554 P-I/IS:7098 P-I of Group 1of approved make in ground as per IS:1255 including excavation of 30 cmx75 cm size trench, 25 cm thick underlayer of sand, IInd class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size 185 sq. mm. 3.5 core |
| 2 | P/Laying P.V.C./XLPE insulated & P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor of IS:1554 P-I/IS:7098 P-I of Group 1of approved make in ground as per IS:1255 including excavation of 30 cmx75 cm size trench, 25 cm thick underlayer of sand, IInd class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size 70 sq. mm. 3.5 core |
| 3 | P/Laying P.V.C./XLPE insulated & P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor of IS:1554 P-I/IS:7098 P-I of Group 1of approved make in ground as per IS:1255 including excavation of 30 cmx75 cm size trench, 25 cm thick underlayer of sand, IInd class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size 10 sq. mm. 2 core |
| 4 | P/Laying P.V.C./XLPE insulated & P.V.C. sheathed cable of 1.1 KV grade with aluminium conductor of IS:1554 P-I/IS:7098 P-I of Group 1of approved make in ground as per IS:1255 including excavation of 30 cmx75 cm size trench, 25 cm thick underlayer of sand, IInd class bricks covering, refilling earth, compaction of earth, making necessary connection, testing etc. as required of size 16 sq. mm. 4 core |
| 5 | S & Laying following size earth wire/strip in horizontalor vertical run in ground/surface/recess includingriveting, soldering, saddles, making connection etc. asrequired. 8 SWG G.I. ( Hot Dipped ) Wire |
| 6 | P / L of Double wall corrugated HDPE pipe confirming toIS : 14930 P - 1 & 2 with HDPE Coupler at 1 mtr. Depthbelow the ground for laying cable including making thetrench and back filling , compaction of earth as requiredof Gemini or IS:14930 marked make.Outer Dia. / Inner dia. 120 / 103.5 mm |
| 7 | Supply and erection of P.C.C./R.C.C. pole as per RECmanual no 15/1979 conforming to IS: 2905/1966including excavation of pit and back filling with stoneaggregate/boulders and soil in 0.45m consolidating eachdeposited layer of 0.45m by ramming and watering etccomplete in all respect. 8.0 Mtr long as per Discom specification |
| 8 | S & F of IP - 65 protected impact resistantpolycarbonate / Polysterene enclosures of followingsizes. 300 x 450 x 132 mm |
| 9 | S & F of IP - 65 protected impact resistantpolycarbonate / Polysterene enclosures of followingsizes. 320 x 640 x 179 mm |
| 10 | P&F following size aluminium bus bar on insulators atapproved spacing in existing bus bar chamber includingmaking holes etc. as required. 50 x 5 mm |
| 11 | LT Cable Note : 8 - Add @ 50/- p.m. if trench excavation in C.C. flooring / Tar road Deduct |
| 12 | Supplying and making one end termination with heavyduty single compression brass gland SIBG type, heavyduty aluminium lugs duly crimped with crimping tool,PVC tape etc for following size of Armoured PVCinsulated & PVC sheathed/ XLPE aluminium conductorcable of 1100 volt grade as required of size. 3 x 185.0 sq.mm |
| 13 | Pipe Earthing as per IS:3043 with perforated 3.0 Mtr. Long, 40 mm dia. \" B \" class G.I. Pipe including all accessories like nut, bolts, reducer, nipple, wire meshed funnel, and C.C.finished chamber covered with hinged type with locking arrangement C.I. Cover,C.I. Frame of size 300mm x 300 mm and embodying the pipecomplete with alternate layers salt and coke/ charcoal, testing of earth resistance as required. |