Public Administrative Department Cooperative Closing in 0 days TDR #28731210

Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena

Issued by Cooperative · DEEKHATPURA, Madhya Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
09 Aug 2021
0 days left
EMD
36000
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
DEEKHATPURA → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena

BOQ

Name of Work:Construction of 200 MT Godown with New Office Building at DEEKHATPURA Distt. Morena (M.P.)
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in over areas foundation trencheds or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m 2.6.1 p/1 All kinds of soil
2Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, Footings, bases of columns, etc. for mass concrete up to plinth level 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete up to plinth level.
3providing and laying in position cement concrete of specified grade excluding the const of centring and shuttering - All work upto plinth level with 40mm nominal size graded stone aggregate 4.1.2.3M-7.5
4Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering shuttering, finishing and reinforcement All work up to plinth level. 5.1.1 M-20 Nominal Mix
5Suspended Floors, Roofs, Landings, Balconies and access platform, Shelves (Cast in Situ) Lintels, Beams, Girders, Bressumers and cantilevers, Columns, Pillars, Posts and Struts Walls in super Structure.
6Reinforcement cement concrete work in walls (any thickness) including attached pilasters, uttresses, Plinth and string courses, fillets, columns, pillars, posts and struts uspended floor, roof slab, beam, etc. upto floor two level excluding cost of centering shuttering finishing and reinforcement5.2.1M-20 Normal mix (with 20mm nominal size graded stone aggregate)
7Brick work with well brunt open bhatta, bricks, Crushing Strength not less than 25kg/Sqcm and water absorption not more than 20% in foundation and plinth 6.5.2 Cement Mortar 1:6 (1 Cement : 6 Sand)
8Extra for brick work in superstructure above floor II Level for each additional floor or part thereof
9Extra for brick work in superstructure above floor II Level for each additional floor or part thereof
10Reinforcement for RCC work including straightening, Cutting, Bending, Placing in Position and Binding Including Cost of binding wire upto Floor two level including all wastage etc Complete 5.16.3Cold Twisted bars (CTD)
11Filling available Excavated Earth (Excluding rock) in Trenches plinth sides of foundation etc. in layers not exceeding 20 cm in depth. Consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m
12Supplying and filling in plinth with hard muram/hard copra under floors including watering ramming consolidating and dressing complete
13Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priiming coat of approved steel primer using structural steel etc. as required. Hoisting fixing in position and applying a priming coat of approved steel 10.23.2 in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
14Providing and fixing 1mm thick M.S Sheet door with frame of 40 x 40 x 6 mm angle iron and 3mm M.S gusset plates at the junctions and corners, alll necessary fittings complete, including applying a priming coat of approved steel primer 10.5.1 Using M.S angele 40 x 40x 6 mm for diagonai braces
15Providing and fixin g welded steel wire fabric fencing with posts of specified material and of stadard design placed and embeded in cement concrete blocks 45 x 45 x 60 cm of mix 1:5:10 (1 cement 5 Fine Sand : 10 Graded stone aggregate 40mm nominal size) every 15th post, last but one end post and corner post on one side only and struts embeded in cement concrete blocks 45 x 50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately) 10.30.125 x 25 mm size 12 gauge
166 mm cement plaster 1:3 (1 cement 3 sand) finished with a floating coat of neat cement and thick coat of lime wash for bearing of RCC slabs and beams.
1712 mm Cement Plaster of Mix (1 Cement : 6 Sand)
1818 mm Cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 Cement : 5 Sand) finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand)
19Applying one coat of cement primer of approved brand and manufacture on wall surface : 13.32.1 Cement Primer
20Finishing walls with water proofing cement paint of required shade : New work (Two of more coats applied @ 3.84 kg /10 Sqm)
21Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 Sqm over and under coat of primer applied @ 0.80 ltr / 10 Sqm of approved brand or manufacture
22Add Extrafor Electrificate work and other miscellaneous and GST

AI Tender Summary

OUR REF NO 28731210
AUTHORITY Cooperative
TENDER VALUE Ref. Documents
LAST DATE 09-08-2021
Authority
Authority Name Integrated Cooperative Development Project
Work Description Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena Construction Of 200 Mt Godown With New Office Building At Deekhatpura Tehsil Morena Distt. Morena
Basic Detail
Tender No deekhatpura
Bidding Type Tender
Location
City DEEKHATPURA
State Madhya Pradesh
Key Dates
Publish Date 03 Aug 2021
Submission Date 09 Aug 2021
Open Date 11 Aug 2021
Finance
Tender Value Ref. Documents
Tender Fee 2000
EMD 36000
Exemption Not Available
Document List
59a1f17d-7fdf-457b-8406-050b4f7e0e98.html
BOQ_177469.xls
TENDERDOCPACSDEEKHATPURA.pdf
Tendernotice_1.pdf
TERMSANDCONDITIONDEEKHATP.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 03, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 09, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 11, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

59a1f17d-7fdf-457b-8406-050b4f7e0e98.html

xls

BOQ_177469.xls

pdf

TENDERDOCPACSDEEKHATPURA.pdf

pdf

Tendernotice_1.pdf

pdf

TERMSANDCONDITIONDEEKHATP.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders