|
| 1 | OXYGEN SYSTEM Supply, erection, Installation, Testing & Commissioning of 5+5 Size (or combination thereof as specfied in specifications) of Main oxygen manifold complete with 10 nos. pig tail pipes & 10 nos. of non return valves with middle frame complete in all aspect. Fully Complies and meets with HTM02-01/NFPA99/ISO 7396-1. Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST. |
| 2 | OXYGEN SYSTEM Supply, Installation, Testing & Commissioning of Fully automatic oxygen control panel - 500 LPM capacity .Fully Complies and meets with HTM02- 0/NFPA99/ISO 7396-1.Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST. |
| 3 | OXYGEN SYSTEM Supply, Erection, Installation,Testing & Commissioning of 1 X 5 cylinders (or combination thereof as specfied in specifications) Emergency manifold complete with 5 nos. pig tail pipes & 5 nos. of non return valves with middle frame complete in all aspect.Fully Complies and meets with HTM02-01/NFPA99/ISO 7396-1. Refer to specifications for details.The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 4 | OXYGEN SYSTEM Supply, fixing, testing and commissioning of Oxygen Terminal Unit ( Gas outlet points), with probe/adaptor complete in all aspect. Fully Complies and meets with HTM02-01/NFPA99/ISO 7396-1.. Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 5 | OXYGEN SYSTEM Supply, Installation,Testing & Commissioning of Oxygen flow meter with Humidifier Bottle DUAL Y-TYPE. 0-15L/min standard flow rate. Fully Complies and meets with HTM02-0/NFPA99/ISO 7396-1. Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 6 | MEDICAL GRADE COPPER PIPING Supply, Installation,Testing & Commissioning of MEDICAL GRADECopper Pipes of 12mm OD x 0.9 mm thk Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 7 | MEDICAL GRADE COPPER PIPING Supply, Installation, Testing & Commissioning of MEDICAL GRADE Copper Pipes of 15mm OD x 0.9mm thk Refer to specifications for details. Supply, Installation,Testing & Commissioning ofRefer to specifications for details. Fully Complies and meets with HTM02-01/NFPA99/ISO 7396-1. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 8 | MEDICAL GRADE COPPER PIPING Supply, Installation,Testing & Commissioning of MEDICAL GRADE Copper Pipes of 22mm OD x 0.9mm thk Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 9 | AREA ALARM Supply, Installation,Testing & Commissioning of area alarm. Fully Complies and meets with HTM02- 01/NFPA99/ISO 7396-1.Refer to specifications for details. The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 10 | LOCKABLE LINE VALVES Supply, Installation,Testing & Commissioning of 15mm lockable line valves. Refer to specifiations for details.The rates shall be inclusive of all labour, material, wastage, scaffolding, transportation,import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |
| 11 | LOCKABLE LINE VALVES Supply, Installation,Testing & Commissioning of 22mm lockable line valves. Refer to specifiations for details. The rates shall be inclusive of all labour, material, wastage, scaffolding, transportation, import duties, transit insurances, including all leads and lifts at all levels and shall be as directed by Engineer in charge, however shall be excluding GST |