Assistance In Major Shutdown / Breakdown / Mechanical Maintenance Works Of Belt Conveyors Of Trs Section Of New Chp, Dipka Expansion Project On As And When Required Basis For A Period Of 180 Days. , Dipka Expansion Project, Dipka Area-Chhattisgarh

South Eastern Coalfields Limited-SECL has published Assistance In Major Shutdown / Breakdown / Mechanical Maintenance Works Of Belt Conveyors Of Trs Section Of New Chp, Dipka Expansion Project On As And When Required Basis For A Period Of 180 Days. . Submission Date for this Tender is 16-08-2021. Conveyors and Accessories Tenders in Dipka Expansion Project, Dipka Area Chhattisgarh. Bidders can get complete Tender details and download the document.




Tender Notice

28708429
Assistance In Major Shutdown / Breakdown / Mechanical Maintenance Works Of Belt Conveyors Of Trs Section Of New Chp, Dipka Expansion Project On As And When Required Basis For A Period Of 180 Days.
Open Tender
Indian
Chhattisgarh
Dipka Expansion Project, Dipka Area
16-08-2021

Tender Details

Assistance In Major Shutdown / Breakdown / Mechanical Maintenance Works Of Belt Conveyors Of Trs Section Of New Chp, Dipka Expansion Project On As And When Required Basis For A Period Of 180 Days.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 36.98 Lakhs /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description
1Dismantling/disassembling/handling job in major shut down/ break-down mechanical maintenance works:- Dismantling/lowering of counter-weights, dismounting of idlers and idler frames; pulling of damaged/ existing steel cord belt/ Nylon-Nylon belt; dismantling and disassembly of damaged assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take-up units etc. and other allied works at various locations of TRS Area of New CHP.
2Assembling/installation/handling job in major shutdown/ break-down mechanical maintenance works:- Handling of counter-weights; mounting of idlers and idler frames; laying/ placing/ positioning of new steel cord/ Nylon-Nylon belt; re-installation/ re-erection, setting of new/ repaired assembly/ sub-assembly, pulleys, rolling elements, drive units, conveyor take-up units etc. and other allied works at various locations of TRS Area of New CHP.
3Scope of Contractor:-1). The work will be taken up as and when required basis on a very short notice as per availability and shutdown of circuits. 2). All tools, tackles and safety standards to engaged personnel will be provided by the Contractor. 3). Atleast 02 nos. welding machine and accessories must be provided by the Contractor. 4). For installation of drive units/ other sub-assemblies desired preparation should be done. 5). Work should be carried out as per existing design. 6). The repairing /maintenance work carried out on site will be as per instruction of Engineer I/c. Scope of SECL:-1). The welding electrode, Industrial Gas, other consumables will be provided by the Department. 2). Iron steel, crane, truck will be provided by the Department. Note: The contract may be foreclosed at any point of time during the contract period as per requirement of the work.
4Total impact of GST for the purpose of CTC
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail