Supply Of Api 610 Multistage Centrifugal Pumps , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Bidder To Arrange Tpia Including All Tp, IOCL Gujarat - Vadodara-Gujarat

Indian Oil Corporation Limited-IOCL has published Supply Of Api 610 Multistage Centrifugal Pumps , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Bidder To Arrange Tpia Including All Tp. Submission Date for this Tender is 13-09-2021. Centrifugal Pump Tenders in IOCL Gujarat - Vadodara Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

28694623
Corrigendum : Supply Of Api 610 Multistage Centrifugal Pumps , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Bidder To Arrange Tpia Including All Tp
Open Tender
Indian
Gujarat
IOCL Gujarat - Vadodara
13-09-2021

Tender Details

Supply Of Api 610 Multistage Centrifugal Pumps , Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia ( Bidder To Arrange Tpia Including All Tpia Charges ) , Packing, Supply Of The Following Pumps As Specified In The Document, Including Supply Of All Commissioning Spares ( Please Refer Note-3 ) & Special Tools And Tackles, All Auxiliaries & Documentation As Per The Enclosed Standard Specifications, Job Specification, Data Sheets Etc. And Other Codes And Standards Attached Or Referred In Material Requisition. , Lcn Splitter Bottom Pumps: 603-P-27 A / B ( N ) , Supervision At Site: , Supervision During Erection, Pre-Commissioning And Commissioning ( Refer Note: 7 Above ) - Per Diem Charges For Upto 8 Hours Work On Normal Working Days , Supervision During Erection, Pre-Commissioning And Commissioning ( Refer Note: 8 Above ) - Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days , Supervision During Erection, Pre-Commissioning And Commissioning ( Refer Note: 8 Above ) - Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Project Site )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Aug-2021 Corrigendum-2 Date 13-09-2021
2 09-Sep-2021 Corrigendum-3 Technical Bid 13-09-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Design, Engineering, Manufacturing, Procurement of Materials and Bought out Components, Assembly at Shop, Testing at Manufacturer"s Works, Inspection by TPIA (Bidder to arrange TPIA including all TPIA charges), Packing, Supply of API 610 Multistage Centrifugal Pumps (BB5) as specified in the MR document, including Supply of all Commissioning Spares (Note-3) & Special Tools and Tackles, all Auxiliaries & Documentation as per the enclosed Standard Specifications, Job Specification, Data Sheets etc. and other Codes and Standards attached or referred in Material Requisition.
Sl. No. Item Description
1Design, Engineering, Manufacturing, Procurement of Materials and Bought out Components, Assembly at Shop, Testing at Manufacturer"s Works, Inspection by TPIA (Bidder to arrange TPIA including all TPIA charges), Packing, Supply of the following Pumps as specified in the document, including Supply of all Commissioning Spares (Please refer Note-3) & Special Tools and Tackles, all Auxiliaries & Documentation as per the enclosed Standard Specifications, Job Specification, Data Sheets etc. and other Codes and Standards attached or referred in Material Requisition.
2LCN SPLITTER BOTTOM PUMPS: 603-P-27 A/B (N)
3Supervision at Site:
4Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 7 above) - Per diem charges for upto 8 hours work on normal working days
5Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour beyond normal 8 Hours work on normal working days
6Supervision during Erection, Pre-Commissioning and Commissioning (Refer Note: 8 above) - Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail