| 1 | Reconnaissance Survey & Inception Report |
| 2 | Road |
| 3 | Topographic Survey including fixing of GPS pin |
| 4 | Road |
| 5 | Conducting survey for L.S. & C.S. |
| 6 | Road |
| 7 | Fixing Horizontal and Vertical Alignment as per IRC standards. |
| 8 | Road |
| 9 | Conducting 7-days traffic volume study at 2 locations |
| 10 | Road |
| 11 | Conductingorigin-Desitination study at4 locations |
| 12 | Road |
| 13 | Clearing the Light jungle to a width of 45m (3000x45x60%) |
| 14 | Road |
| 15 | Soil sample collection and conducting atterberg limits and CBR for road work |
| 16 | Road |
| 17 | Detailed Report on alignment (including three alternations), fixing Horizontal Alignment and Vertical Alignment as per IRC Standards |
| 18 | Road |
| 19 | Design for pavement composition based on Kilometer-wise field data |
| 20 | Road |
| 21 | Design of miscellaneous components like junction improvements, drain, retaining wall, CD works, etc. |
| 22 | Road |
| 23 | Preparation of Land Plan Schedule and its report |
| 24 | Road |
| 25 | Preparation of Detailed Estimate and Abstract Estimate including Power Point Presentation |
| 26 | Road |
| 27 | Report on Environment & Social Impact Assessment, Report writing and submission of report like Inspection Report, Alignment Report, Traffic Report, etc., complete. |
| 28 | Road |
| 29 | Draft Detailed Project Report |
| 30 | Road |
| 31 | Final Detailed Project Report |
| 32 | Road |
| 33 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 34 | Basic cost of value put to tender as per estimate |
| 35 | Add GST at 18% |
| 36 | Total Value put to Tender |
| 37 | Quoted value |
| 38 | Final Quoted Value |
| 39 | Add GST at 18% of Final Quoted Value |
| 40 | Total Value of Contract Including 18% of GST |
| 41 | Basic cost of value put to tender as per Estimate |
| 42 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |