|
| 1 | Inspection of panel board of 5 KVA DG set and replacing and fixing of LOP switches -02 No, 12 V DC rellay- 01 No and servicing of engine including replacing and fixing of M-oil filter-01 No, Fuel filter-01 No, air filter-01 No and Moil including labour charges etc complete5 KVA DG set of Andrala post-1 |
| 2 | Inspection of panel board of 5 KVA DG set and replacing and fixing of LOP switches -02 No, 12 V DC rellay- 01 No and servicing of engine including replacing and fixing of M-oil filter-01 No, Fuel filter-01 No, air filter-01 No and Moil including labour charges etc complete5 KVA DG set of Balua post-1 |
| 3 | Inspection of panel board of 5 KVA DG set and replacing and fixing of LOP switches -02 No and servicing of engine including replacing and fixing of M-oil filter-01 No, Fuel filter-01 No, air filter-01 No, Fuel pump-01 No, Nozzle-1 No and Moil including labour charges etc complete.5 KVA DG set of Baruni post |
| 4 | Replacing and fixing of liner set of 125 KVA DG set |
| 5 | Replacing and fixing of piston ring set of 125 KVA DG set |
| 6 | Replacing and fixing of connecting bearing set of 125 KVA DG set |
| 7 | Replacing and fixing of head gasket of 125 KVA DG set |
| 8 | Replacing and fixing of M-oil filters -02 No, diesel filter-2 No, binjo washer kit set- 1 No, M-oil -30 Ltrincluding labour charges etc complete of 125 KVA DG set. |
| 9 | Repairingof fuel pump including replacing of delivery valve, elements, spring-06 No, govn rack, bearing etc complete and repairing of injecdtors including replacing of nozzles- 6 No etc complete of 125 KVA DG set |
| 10 | Repairing of engine head parts including repairing of valve-6 pairs, valve sheet- 6 pair, valve guide- 6 pair, sting seal-6 pair etc complete of 125 KVA DG set |
| 11 | Replacing and fixing Turbo charger corc complete set, wall seal kit-02 No, nozzle cap- 6 No including head length cutting and valve grinding complete of 125 KVA DG set |
| 12 | Rewinding of motor of alternator with new copper coilincl adjusting the cost ofretrieve copper and other material, replacing and fixing of siliping, carbon rocker-02 No. carbon- 4 no etc complete of 40 KVA DG set |
| 13 | Attending complaint of any defective DG set either by mechanical or electrical engineer/technician/mechanic, removing minor defects and submission of estimate of repairing of DG set after thoroughly inspection. |