Annual Rate Contract For Material Handling At Bongaigaon Refinery Stores Annual Rate Contract For Material Handling At Bongaigaon Refinery Stores
Tender Value
1.32 Crore
Estimated cost
Bid Submission
12 Aug 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
DHALIGAON → Assam
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Annual Rate Contract For Material Handling At Bongaigaon Refinery Stores Annual Rate Contract For Material Handling At Bongaigaon Refinery Stores
BOQ
| Sl. No. | Item Description |
| 1 | Handling & Local Transportation of Mater |
| 2 | Collection/delivery of the consignment from/to carrier godown/Rly yard / Bank / Post Office/ Central dispatch / Bongaigaon / Dhaligaon and safe delivery to BGR Store/ Trans porter / Vendor\"s godown at BNGN including all activity i.e. loading, unloading at both end and transportation , stacking segregating,tagging,racking etc. in receipt section Manually |
| 3 | Collection/delivery of the consignment from/to carrier godown/Rly yard / Bank / Post Office/ Central dispatch / Bongaigaon / Dhaligaonand safe delivery to BGR Store/ Trans porter / Vendor\"s godown at BNGN including all activity i.e. loading, unloading at both end and transportation , stacking segregating,tagging,racking etc. in receipt section by Hand Cart. |
| 4 | Collection/delivery of the consignment from/to carrier godown/Rly yard / Bank / Post Office/ Central dispatch / Bongaigaon / Dhaligaonand safe delivery to BGR Store/ Trans porter / Vendor\"s godown at BNGN including all activity i.e. loading, unloading at both end and transportation , stacking segregating,tagging,racking etc. in receipt section by Contractor\"s Truck. Rate per MT |
| 5 | Collection/delivery of the consignment from/to carrier godown/Rly yard / Bank / Post Office/ Central dispatch / Bongaigaon / Dhaligaon safe delivery to BGR Store/ Trans porter / Vendor\"s godown at BNGN including all activity i.e. loading, unloading at both end and transportation , stacking segregating,tagging,racking etc. in receipt section By BGR Van. |
| 6 | All Operation i.e. handling,loading,unloading tagging,packing,marking ,stacking,re-arranging of all direct delivery cargo to stores by Vendor/Transporter. Non-hazardous /Hazardous Chemicals/Steel matls / Pipes/Cement/ Packed cargo Manually-from Truck/Trailer. |
| 7 | All Operation i.e. handling,loading,unloading tagging,packing,marking ,stacking,re-arranging of all direct delivery cargo to stores by Vendor/Transporter. Non-hazardous /Hazardous Chemicals/Steel matls / Pipes/Cement/ Packed cargo Hazardous/ Non-hazardous By BGR Crane. |
| 8 | All Operation i.e. handling,loading,unloading tagging,packing,marking ,stacking,re-arranging of all direct delivery cargo to stores by Vendor/Transporter. Non-hazardous /Hazardous Chemicals/Steel matls / Pipes/Cement/ Packed cargo Manually otherthan Truck/trailer. |
| 9 | All receipt activities in Receipt Section including opening, breaking ,stacking , loading ,shifting ,counting, marking, tagging, unloading ,staging etc and handingover to issue section after inspection and to assist in inspection activity |
| 10 | Taking out of small items from bins/racks and proper stacking and tagging after verification |
| 11 | All receipt activities in respect of bulk Chemicals and liquids without handling to complete related job. Per tanker. |
| 12 | All receipt activities in respect of bulk Chemicals and liquids without handling to complete related job. Per tanker. |
| 13 | All issue/receipt activities including handling ,shifting, counting ,verifying ,painting ,/ marking etc. from bin/box/inside/outside of Ware House (Inclusive of issue from Receipt Section) and receipt of returned matls. from consultants/Contractor/Dep\"t. All items(coded) excluding of steel,cement,scrap & stationery. |
| 14 | All issue/receipt activities including handling ,shifting, counting ,verifying ,painting ,/ marking etc. from bin/box/inside/outside of Ware House (Inclusive of issue from Receipt Section) and receipt of returned matls. from consultants/Contractor/Dep\"t. Stationery item(without code). |
| 15 | All issue/receipt activities including handling ,shifting, counting ,verifying ,painting ,/ marking etc. from bin/box/inside/outside of Ware House (Inclusive of issue from Receipt Section) and receipt of returned matls. from consultants/Contractor/Dep\"t. Steel,Cement,Scrap(only counting,verification of items,weighment exclusive of handling). |
| 16 | Shifting, counting stacking rebinning rearranging, marking with paint, packing etc. of matls.from one place to another /one W/H to other / one store yard to other yard. (irregular job max 4 days a week ),manually. Per item code. |
| 17 | Shifting, counting stacking rebinning rearranging, marking with paint, packing etc. of matls.from one place to another /one W/H to other / one store yard to other yard. (irregular job max 4 days a week ),By Hand Cart. Per MT. |
| 18 | Paking Wooden Boxes/Crates as required,writing addresse ect.on the Box(irregular job max.5 days a week) Rate per Cubic meter. |
| 19 | Repacking,rebagging,weighment,Stacking of Bulk Materials including cleaning of the area as per the instruction of EIC,irregular job as and when required basis. Rate per item code. |
| 20 | All Preservation activities for Pipes/Pipe fittings/Machines/Equipments etc.Derusting with Emery paper ,Wire brush,cleaning with cotton waste/cotton cloth,applying coat of preservative.For machine/equipment ,removing the rust,paint coat,cleaning,applying the coat of primer,paint as per the instruction of EIC as & when required. |
| 21 | Derusting of Cylinders, removing previous layer of paints with emery papers, cleaning of the surface, drying, applying a coat of primer & then painting as per Standard color Code. Finally after drying the cyl. Writing the cyl. Nos. on the cylinder with paint. |
| 22 | Trip of tractor from Bongaigaon Refinery to plant for misc jobs. |
| 23 | Trip of tractor from Bongaigaon Refinery to Township for misc jobs. |
| 24 | Assisting in checking of Seals of Loaded Chemical Tanker Vehicle and weightment of Loaded/decanted Chemical Tankers etc. |
| 25 | Hiring and operation of Crane at Stores |
| 26 | Supply & operation of Hydraulic mobile crane (10 to 12 Tons capacity) - 1 no during normal working hours ( 8 hrly basis from morning 8.00 AM to evening 5.00 PM with 1hr lunch break) |
| 27 | Mobiliastion/De-mobilisation charges for supplied crane |
| 28 | Hiring and operation of FORKLIFT truck |
| 29 | Supply & Operation of FORKLIFT TRUCK (2-3 MT capacity) - 1 no during normal working hours day basis (As & when required basis) |
AI Tender Summary
Tender Timeline
Jul 29, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedAug 12, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 13, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender