Kerala State Electricity Board-KSEB has published 110Kv Substation Westhill Construction Of Trailer Road Power Cable Culvert And Cable Trench Clearing Jungle Earthwork Excavation Demolishing Brick Laterite Stone Rubble Cement Concrete Sectioning Loading Transporting Filling Earth Supply And Compaction Of. Submission Date for this Tender is 07-08-2021. Power Cable Tenders in 110kV Substation Westhill Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
2 | Earth work in excavation by mechanical means(hydraulic excavator)/manual means in foundation trenches or drains not exceeding(1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms,lift upto 1.50m,including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50m.All kinds of soil |
3 | Demolishing brick Laterite work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement morter |
4 | Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar |
5 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in - charge. |
6 | Sectioning up to 150mm and forming the surface ready for spreadingmetal |
7 | Loading and transporting the dumped earth in the yard by mechanical means (carriage including loading and unloading) and depositing the same to the places as directed by departmental officers( lead up to 1-2 km) androlling using power roller of 8-12 tonn capacity by layers under optimum moisture conditions to give atleast 95% proctor dry density including all labour charges etc. complete. |
8 | Supplying and filling quarry muck in trenches,of foundations etc. in layersnot exceeding 20 cm in depth, consolidating each deposited layer by ramming andwatering, lead up to50 m and lift up to 1.5 m. |
9 | Providing and laying in position cement concrete of specified grade excluding the cost of centeringand shuttering - All work up to plinth level1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
10 | Centering and shuttering including strutting,propping etc. and removal of form for foundations,footing and base of columns |
11 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
12 | Providing and laying specified grade of RCC excluding centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 -coarse sand - 20 mm stone aggregate |
13 | Reinforcement for RCC work including straightening, cutting, bending, placing in position complete. - Upto plinth level Thermo-Mechanically Treated bars. |
14 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
15 | Plastering using 12mm cement plaster of mix 1:4 (1 cement:4 fine sand) including all cost of materials,labour charges etc.complete |
16 | Compaction of earth work/Quarry muck in embankment/ filling (Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity) under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). |
17 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying 2 more coat synthetic enamel paint over a coat of priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete:Hot finished welded type tubes |
18 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
19 | Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 (1 cement : 6 coarse sand) etc |