|
| 1 | Dismantling tiles floor laid in mortar upto floor two level including stacking of serviceable materials and disposal of unserviceable materials (wooden/ concrete joints to be measured and paid for separately) within 50 m. |
| 2 | For thickness of lintels above 25 mm and upto 40 mm |
| 3 | Demolition above G.L.upto floor two level including disposal of unserviceable materials with 50 m lead |
| 4 | Unreinforced cement concrete upto 15 cm. thickness |
| 5 | Demolition of brick work above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 50 m lead. |
| 6 | Dismantling old plaster or skirting raking out & cleaning the surface for re-plaster i/c disposal of rubbish within 50 metres. |
| 7 | Earth work in surface excavation exceeding 30 cm in depth but exceeding 1.5 metres in width as well as 10 sqm on plan i/c disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposal soil to be levelled and neatly dressed in |
| 8 | Hard/Dense Soil. |
| 9 | Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering |
| 10 | i) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 11 | i) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 12 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 13 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). |
| 14 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete |
| 15 | Thermo-Mechanically Treated bars |
| 16 | Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in : [Using 12 mm shuttering ply] |
| 17 | a) Foundation, footings, bases of columns etc. and mass concrete. |
| 18 | Providing and laying 22 mm thick precast cement concrete chequered tiles on footpath over 20 mm thick bed of cement mortar 1:3 complete as per drawing and technical specifications. |
| 19 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, ( for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 20 | 15 mm cement plaster 1:3 (1 cement: 3 fine sand) |
| 21 | Painting on wall with (two coats) of plastic emulsion paint of approved quality in all shades on new work to give an even shade. |