| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in all kinds of soil over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns |
| 4 | Providing and laying in position specified grade of Reinforced Cement concrete, excluding the cost of centering,shuttering,finishing and reinforcement-All work upto plinth level. 1:1.5:3(1cement:1.5coarse sand:3graded stone aggregate 20mm nominal size) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 6 | Providing and laying factory made chamfered edge Cement Concrete paver blocks In foot path, park & lawns driveway or light & traffic parking etc. of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of course sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, all complete as per manufacturer\"s specifications & direction of Engineerin- Charge.80mm thick Cement concrete paver block of M-30 grade with approved colour, design & pattern. |
| 7 | Plastering using 12mm cement plaster of mix 1:4 (1 cement:4 fine sand) including all cost of materials,labour charges etc.complete |
| 8 | Supplying and filling quarry muck in trenches of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.50m |
| 9 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 10 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar |
| 11 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 12 | Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth(up to 1.5m above plinth) with thickness 15cm in: CM 1:6 (1 cement : 6 coarse sand) etc complete |
| 13 | Finishing walls with Deluxe multi surface paint system for interiors and exteriors using primer as per manufactures specifications -Two or more coat applied on walls @1.25 Ltr/10m2 over and including one coat ofspecial primer [email protected] Ltr/10m2) |