Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Doda By Way Of Clearance Of Slips Likely To Occur During Financial Year 2021-2022- Pkg. No. Jk04-287, Jk04-270, Jk04-289, Jk04-288, Jk04-540, Jk04-476, Jk04-307 Total Length 73.375 Kms , Assar-Jammu And Kashmir
TDR : 28587021
Tender Notice
BOQ
Expired
Assar
Jammu And Kashmir
Restoration Of Roads Under The Jurisdiction Of Pmgsy Division Doda By Way Of Clearance Of Slips Likely To Occur During Financial Year 2021-2022- Pkg. No. Jk04-287, Jk04-270, Jk04-289, Jk04-288, Jk04-540, Jk04-476, Jk04-307 Total Length 73.375 Kms
Name of Work:Restoration of roads under the jurisdiction of PMGSY Division Dodaon emergency basis i.e. (Motorable paths only) by way of clearance of snow/slips likely ot occur during financial year 2021-2022 on :-1. Khellani Dranga Bhargran to Behota,Part-I,Package No:- JK04-287, Length = 15.00 Kms. 2. Khellani Dranga Bhargran to Behota Part-II, Package No. JK04-270 Length = 22.00Kms. 3. Bhargran to Rote, Package No. JK04-289, Length = 13.00 Kms 4.Gangalwar to Sarsi, Part-I, Package No. JK04- 288, Length = 11.50 Kms. 5. Gangalwar to Sarsi. Part-II, Package No. JK04-540, Length = 3.875 Kms 6. Khellani Dranga Hud to Saras, Package No JK04-476, Length = 4.00 Kms7. Gangalwar to Sarsi, Upgradation, Pkg No. JK04-307, Length = 4.00 Kms Total Length:- 73.375 Kms
Sl. No.
Item Description
1
Clearing Snow (With Frost) from Roads, Manually / Mechanically using picks and shovels, snow depth upto 150mm
2
Clearing snow (without frost) from roads manually / Mechanically
3
Snow depth upto 150mm
4
Snow depth over 150mm but upto 250mm
5
Snow depth over 250 mm but upto 350mm
6
Snow depth over 350 mm but upto 450mm
7
Snow depth over 450 mm but upto 550 mm
8
Snow depth over 550 mm but upto 650 mm
9
Snow depth over 650 mm but upto 750 mm
10
Snow depth over 750 mm but upto 850 mm
11
Snow depth over 850 mm but upto 950 mm
12
Snow depth over 950 mm but upto 1050 mm
13
Snow depth over 1050 mm but upto 1150 mm
14
Snow depth over 1150 mm but upto 1250 mm
15
Galla Cutting in Compressed Snow
16
1200mm deep and 4m wide
17
Slip Clearance
18
In ordinary soil disposal lead upto 5 m and lift upto 1.5 m
19
In soils; mixed with moorum kankar/shingle/Boulders; disposal lead upto 50 m and lift upto 1.5 m
20
In soils; mixed with Decomposed Rocks; by blastingor any other means.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.