| 1 | PART-I OPERATION AND MAINTENANCE OF E/M INSTALLATIONS |
| 2 | Operation and maintenance of Electric driven pump set at 1 CBPO pump houseby deploying adequate and experienced qualified skilled One operator, round the clock including Sunday and holidays in Three shifts per day of 08 hours each ( Ist shift from 0600 to 1400 hours,IInd shift from 1400 to 2200 hours and IIIrd shift from 2200 to 0600 hours) complete including its periodical maintenance such as gland packing, lubricants, cleaning properly to keep dust free all the time inclusive of daily, weekly , monthly and quarterly maintenancecomplete all as specified and as directed for the following pump sets :- (i)Pump sets of capacity 15 HP at 44 Mtrs head -02 Nos(ii) LT electrical control panel - 01 No(iii)Submersible Pump Set 5 HP with Filter Plant - 01 No |
| 3 | Operation and maintenance of Electric driven pump set at Anuj Vihar pump houseand Anuj Vihar sewage installation by deploying adequate and experienced qualified skilled One operator, round the clock including Sunday and holidays in Three shifts per day of 08 hours each ( Ist shift from 0600 to 1400 hours,IInd shift from 1400 to 2200 hours and IIIrd shift from 2200 to 0600 hours) complete including its periodical maintenance such as gland packing, lubricants, cleaning properly to keep dust free all the time inclusive of daily, weekly , monthly and quarterly maintenancecomplete all as specified and as directed for the following pumps sets :-(i)Pump sets of capacity 15 LPS at 30 Mtrs head - 03 Nos (ii) Chloranome plant (pressure feed type ) installed in the pump house - 01 No(iii)Diesel engine driven generating set of 50 KVA with control panel - 01 No (iv) Non clogging submersible/centrifugal sewage pump set (installed below ground level) of rated capacity 43 LPS at 25 Mtrs head driven with 28 HP electric motor-02 Nos (installed at anuj vihar sewage installation).(v)Submersible pump set 7.5 HP, 3 phase, 415 Volts,50 Hz including LT electrical control panel at Anuj vihar pump house-01 No |
| 4 | Operationand maintenance of Electric driven pump set at NOM Varuna pump houseby deploying adequate and experienced qualified skilled One operator, round the clock including Sunday and holidays in Three shifts per day of 08 hours each ( Ist shift from 0600 to 1400 hours,IInd shift from 1400 to 2200 hours and IIIrd shift from 2200 to 0600 hours) complete including its periodical maintenance such as gland packing, lubricants, cleaning properly to keep dust free all the time inclusive of daily, weekly , monthly and quarterly maintenancecomplete all as specified and as directed for the following pumps sets :- (i) Centrifugal pump sets 15 HP -04 Nos(ii)Centrifugal pump set of capacity 10 HP at 62 Mtrs head -03 Nos (iii) Submersible pump set 7.5 HP, 3 Phase,415 Volts,50 Hz including LT electrical control panel & cable at Shanker Vihar pump house -01 No (iv)Chlorine dozing system in pump house-02 Nos |
| 5 | Rates required to be quoted for executing the work as describrd in Srl.No. 2 to 4 here-in-before:- |
| 6 | Worker\"s wage per person as per existing rules |
| 7 | Employees Provident Fund as mentioned in the tender documents |
| 8 | Employees State Insurance Contribution as mentioned in the tender documents |
| 9 | Contribution of Bonus as mentioned in the tender documents |
| 10 | Over head & Profit on srl No 5.01 to 5.04 |
| 11 | LWC as mentioned in the tender documents |
| 12 | Notes for Srl No. 2 to 4 :- The quoted rate against EPF, ESIC and Bonus shall be considered for payment on actual basis. Contribution towards EPF, ESIC and Bonus is payable only after submission of valid and authentic document in support of having paid the requisite amount of bonus to the workmen, ie proof of payment |
| 13 | Notes for Srl No. 2 to 4:-The rates quoted by the contractor shall also deemed to be included for the following :- (i)Disinfection/treatment of water by using chemicals as issued by department under Sch \"B\" ,free for use, including operation and maintenance /repair/cleaning of Chlorine dozing pump and bleaching dozer including minor spares iebleaching dozer, rubber bladder, PVC pipe heavy duty, nuts, bolts and washers etc all as directed.(ii) Operating connected accessories such as all type ofsluice valve & connecting accessories.(iii) If any loss or damage takes place to the equipment, machinery, tools, stores, fittingand fixtures etc or any other equipmentinstalled in the pump house premises during the contract period,the same shall be made good/borneby the contractor. |
| 14 | (iv) Mixing of Bleaching powder/Calcium based solid granular chemicals/ disinfectant Granules sodium dichloro Iso-Cyanurate chemicals/sodium Hypochloride including transportation of the same from MES store yard to installation is deemed to be included in the quoted unit rate of the items.(v)Bleaching powder/Calcium based solid granular chemicals/ disinfectant Granules sodium dichloro Iso-Cyanurate chemicals/ sodium Hypochloride andDieselshall be issued under sch \"B\" free for mixing/pouringonly and transportation of the same from MES store to installations shall deemed to be included in the unit rate of the items. |
| 15 | (vi) The contractor will submit the complete details of the tradesmen along with their qualification certificate before commencement of work.(vii) The contractor shall be responsible for watch and guard of installations round the clock 24 hours.Any loss or damage to the plant, equipment installed and Govt. property in the Pump house premises shall be made good/borne by the contractor.(viii)General cleanliness and upkeeping the existing pump houseincluding vegetation within the primises of pump houses/sumps area upto 5 Mtrs allround ,within the boundary walls by deploying manpower with T&P if required , at any time all as directed.(ix) If any newequipment/machinary installed during currency of the contract , the contractor shall run/operate thenewly installed equipment without any extra cost.(x)Testing of earthing of machinary/equipment shall be carried out as directed. |
| 16 | PART-II REPAIR/REPLACEMENT OF LT CABLE UNDER AGE (U) W/S-III |
| 17 | Disconnecting, taking out and removing old existing unserviceable underground, LT cable of any description and in any position complete including taking downprotection pipe etc all as specified and directed for the following sizes:- |
| 18 | Supplying, Laying and jointingXLPE insulated, armoured, heavy duty, aluminum conductor cable1100 volts grade, laid in trenches/ducts, floors, fixed to walls etc. complete all as specified and directed for 25 Sqmm 4 core complete all as specified and directed by Engr-in-Charge. |
| 19 | Excavation in trenches in softloose soil not exceeding 1.5 m deep and not exceeding 1.5 m width and getting out including forming bottom surfaceforlaying cables/pipesall as specified and directed, removing cable protection i.e PCC covers/ bricks & stacking serviceable covers / bricks for reuse and disposal of unserviceable covers within 50 m all as specified and directed. |
| 20 | Returning, filling in including spreading, leveling, watering and well ramming in layers n exc25 cm thickafter the cablesare laid, jointed & tested complete all as specified and directed |
| 21 | Removing of surplus excavated spoil not exceeding 50 M distance and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified. |
| 22 | Material & labour for sand filling with clean dry find sand unwashed including gently punning around cables in trenches/Ducts for cable protection complete all as specified and directed. |
| 23 | Supplying & Laying Sub Class `B’ bricks old size with axis of the bricks perpendicular to the axis of the cable as in cable protection all as specified and directed. |
| 24 | PART-III Sch of Credit to be quoted by Contractor |
| 25 | Old Unserv LT cable of any size |
| 26 | Notes for srl No. 19:-Rate quoted in column 6 shall not be less than the estimated cost inserted by MES under column 5. In case bidder quotes rates less than the corresponding rate under column 5, the rate quoted shall be amended as per column 5 and total amount shall be amended accordingly. |