}

Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Limited Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Lim, NUMALIGARH REFINERY LTD ASSAM-Assam

Numaligarh Refinery Limited has published Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Limited Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Lim. Submission Date for this Tender is 26-08-2021. Holding and Clamping Tools Tenders in NUMALIGARH REFINERY LTD ASSAM Assam. Bidders can get complete Tender details and download the document.




Tender Notice

28579071
Corrigendum : Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Limited Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Lim
Open Tender
Indian
Assam
NUMALIGARH REFINERY LTD ASSAM
26-08-2021

Tender Details

Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Limited Supply Of Gds Unit Shell And Tube Heat Exchangers Lot_1 As Per Technical Specifications Of The Mr For Numaligarh Refinery Limited , Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 For Nrep Project As Specified In Material Requisition. , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Make-Up Compressors Spillback Cooler (Tag. No. - 1P27-E-0856 ) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Lcn Splitter Post Condenser (Tag. No. -1P27-Ee-1356) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Stabilizer Post Condenser (Tag. No. -1P27-Ee-1756) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit(Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Shu Reactor Feed/Hds Effluent Exchangers (Tag. No. - 1P27-Ee-2556 & 1P27-Ee-2557) (Qty - 1 Nos. Each Tag) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Shu Reactor Feed/Effluent Exchanger (Tag. No. - 1P27-Ee-2558) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Shu Reactor Feed Preheater(Tag. No. -1P27-Ee-2559) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Hds Reactor Feed/Effluent Exchangers (Tag. No. - 1P27-Ee-2560 & 1P27-Ee-2561) (Qty - 1 Nos. Each Tag) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Effluent Post Condenser (Tag. No. -1P27-Ee-2756) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Gds Product Trim Cooler (Tag. No. - 1P27-Ee-3057) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Benzene Removal Column Reboiler (Tag. No. - 1P27-Ee-3356) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Benzene Product Trim Cooler (Tag. No. - 1P27-Ee-3357) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Lean Amine Preheater (Tag. No. - 1P27-Ee-9556) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Hds Reactor Feed / Effluent Exchangers (Tag. No. - 1P27-Ee-2562& 1P27-Ee-2563) (Qty - 1 Nos. Each Tag) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 – Hds Reactor Feed / Effluent Exchangers (Tag. No. - 1P27-Ee-2564& 1P27-Ee-2565) (Qty - 1 Nos. Each Tag) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner). , Design, Detail Engineering, Procurement, Fabrication, Site Assembly (As Mentioned In Mr/ Technical Specification) Inspection, Testing, Transportation, Route Survey (If Required) And Supply Of Gds Unit Shell & Tube Heat Exchangers Lot-1 –Stabilizer Reboiler (Tag. No. - 1P27-Ee-3056) (Qty - 1 Nos.) With Accessories, Commissioning Spares, Special Tools And Tackles And Supply Upto Delivery Point As Specified In The Nit (Excluding Charges For Hydraulic Bolt Tensioner).

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 12-Aug-2021 ADDENDUM_1_BOQ BOQ 18-08-2021
2 17-Aug-2021 Addendum_2 Date 26-08-2021
3 18-Aug-2021 Addendum_3_Technical Other 26-08-2021
4 24-Aug-2021 Addendum_4_Commclar1 Other 26-08-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 FOR NREP PROJECT
Sl. No. Item Description
1SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 FOR NREP PROJECT as Specified in Material Requisition.
2Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –MAKE-UP COMPRESSORS SPILLBACK COOLER (Tag. No. - 1P27-E-0856 ) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
3Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – LCN SPLITTER POST CONDENSER (Tag. No. -1P27-EE-1356) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
4Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – STABILIZER POST CONDENSER (Tag. No. -1P27-EE-1756) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT(excluding charges for hydraulic bolt tensioner).
5Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –SHU REACTOR FEED/HDS EFFLUENT EXCHANGERS (Tag. No. - 1P27-EE-2556 & 1P27-EE-2557) (QTY - 1 Nos. each tag) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
6Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – SHU REACTOR FEED/EFFLUENT EXCHANGER (Tag. No. - 1P27-EE-2558) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
7Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –SHU REACTOR FEED PREHEATER(Tag. No. -1P27-EE-2559) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
8Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –HDS REACTOR FEED/EFFLUENT EXCHANGERS (Tag. No. - 1P27-EE-2560 & 1P27-EE-2561) (QTY - 1 Nos. each tag) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
9Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –EFFLUENT POST CONDENSER (Tag. No. -1P27-EE-2756) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
10Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –GDS PRODUCT TRIM COOLER (Tag. No. - 1P27-EE-3057) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
11Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –BENZENE REMOVAL COLUMN REBOILER (Tag. No. - 1P27-EE-3356) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
12Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – BENZENE PRODUCT TRIM COOLER (Tag. No. - 1P27-EE-3357) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
13Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – LEAN AMINE PREHEATER (Tag. No. - 1P27-EE-9556) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
14Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – HDS REACTOR FEED / EFFLUENT EXCHANGERS (Tag. No. - 1P27-EE-2562& 1P27-EE-2563) (QTY - 1 Nos. each tag) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
15Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 – HDS REACTOR FEED / EFFLUENT EXCHANGERS (Tag. No. - 1P27-EE-2564& 1P27-EE-2565) (QTY - 1 Nos. each tag) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
16Design, detail engineering, procurement, fabrication, Site assembly (as mentioned in MR/ Technical Specification) inspection, testing, transportation, route survey (if required) and SUPPLY OF GDS UNIT SHELL & TUBE HEAT EXCHANGERS LOT-1 –STABILIZER REBOILER (Tag. No. - 1P27-EE-3056) (QTY - 1 Nos.) with accessories, Commissioning Spares, Special Tools and Tackles And Supply upto Delivery Point as specified in the NIT (excluding charges for hydraulic bolt tensioner).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail