Public Health Engineering Department-PHED has published Item Rate Contract For Improvement / Replacement / Maintenance Of Parts Of Horizontal Centrifugal Pumps And Motors And Submersible Pumps And Motors And Other Allied Related Works For The Year 2021-22 In Respect Of Jal Shakti ( Phe ) Division Poo. Submission Date for this Tender is 30-07-2021. Lathe Machine Tenders in Poonch Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | HCP RKB Make |
2 | Repairing of pump shaft by jointing welding & turning to bearing size. |
3 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (5 Stage Pump) |
4 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (6 Stage Pump) |
5 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (7 Stage Pump) |
6 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (8 Stage Pump) |
7 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (9 Stage Pump) |
8 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (10 Stage Pump) |
9 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (12 Stage Pump) |
10 | Providing, Fabrication & fitting of new pump shaft as per size and specification. (14 Stage Pump) |
11 | Providing and fitting of Brass Impeller |
12 | Providing and fitting of C.I Impeller |
13 | Repairing of brass Impeller |
14 | Repairing of C.I Impeller |
15 | Fabrication & fitting of neck ring. |
16 | Fabrication & fitting of diffuser bush |
17 | Fabrication of Stainless steel gland bush |
18 | Fabrication of chuck nut |
19 | Providing & Fitting of pump bowl |
20 | Repair to bearing housing by sleeve fitting & boring for bearing size |
21 | Providing of bearing housing along with side cover plate |
22 | Providing and fitting of Delivery Body |
23 | Providing and fitting of Suction Body |
24 | Replacement of ball thrust bearing-7307 |
25 | Replacement of ball thrust bearing-7308 |
26 | Replacement of ball thrust bearing-7309 |
27 | Providing of diffuser |
28 | Replacement of Rollerbearing-N-307 |
29 | Replacement of Rollerbearing-N-308 |
30 | Replacement of Rollerbearing-N-309 |
31 | Providing & Fitting of Oil seal |
32 | Providing & Fitting of Heavy Duty Coupling Pulley |
33 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
34 | Dismantling & fitting of Pump. |
35 | Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
36 | Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Repairs to thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
37 | Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
38 | Repairs to submersible motor (V-8) by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Repairs to thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
39 | Repair to submersible Motor (V-6)by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. |
40 | Repair to submersible Motor (V-8)by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. |
41 | Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit. |
42 | Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit. |
43 | Repairs to V-6 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
44 | Repairs to V-8 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud withnuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit. |
45 | Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
46 | Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
47 | Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
48 | Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
49 | Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
50 | Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
51 | Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. |
52 | Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
53 | Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
54 | Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
55 | Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. |
56 | Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
57 | Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. |
58 | Repair 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers& then assembling of motor. |
59 | Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
60 | Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
61 | Repair to 25 HP motor by way of replecement of bearing at DE end and assembling of motor. |
62 | Repair to 40 HP motor by way of replecement of bearing at DE end and assembling of motor. |
63 | Repair to 50 HP motor by way of replecement of bearing at DE end and assembling of motor. |
64 | Repair to 60 HP motor by way of replecement of bearing at DE and assembling of motor. |
65 | Repair to 100 HP motor by way of replecement of bearing at DE and assembling of motor. |
66 | Repair to 25 HP motor by way of replecement of bearing at NDE and assembling of motor. |
67 | Repair to 40 HP motor by way of replecement of bearing at NDEand assembling of motor. |
68 | Repair to 50 HP motor by way of replecement of bearing at NDEand assembling of motor. |
69 | Repair to 60 HP motor by way of replecement of bearing at NDEand assembling of motor. |
70 | Repair to 100 HP motor by way of replecement of bearing at NDEand assembling of motor. |
71 | Repair to 25 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
72 | Repair to 40 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
73 | Repair to 50 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
74 | Repair to 60 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
75 | Repair to 100 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
76 | Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
77 | Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
78 | Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
79 | Repair to 75 HP motor by way of replecement of bearing at DE & NDE and assembling of motor. |
80 | Repair to 75 HP motor by way of replecement of bearing at DE end and assembling of motor. |
81 | Repair to 75 HP motor by way of replecement of bearing at NDE end and assembling of motor. |
82 | HCP FNC Make |
83 | Repairing of pump shaft by jointing welding & turning to bearing size. |
84 | Providing, Fabrication & fitting of new pump shaft as per size and specification (9 Stage) |
85 | Providing and fitting of Brass Impellers |
86 | Providing and fitting of C.I Impellers |
87 | Repairing of brass Impellers |
88 | Repairing of C.I Impellers |
89 | Fabrication & fitting of neck ring. |
90 | Fabrication & fitting of body bushes. |
91 | Fabrication of Stainless steel gland bushes |
92 | Fabrication of chuck nut |
93 | Providing & Fitting of pump bowl |
94 | Repair to bearing housing by sleeve fitting & boring for bearing size |
95 | Providing of bearing housing along with side cover plates |
96 | Providing and fitting of Delivery Body |
97 | Providing and fitting of Suction Body |
98 | Providing, Fabrication & fitting of new pump shaft as per size and specification (10 Stage) |
99 | Replacement of Rollerbearing-N-204 |
100 | Replacement of Rollerbearing-N-205 |
101 | Providing, Fabrication & fitting of new pump shaft as per size and specification (12 Stage) |
102 | Providing & Fitting of Oil seal |
103 | Fabrication & fitting of balancing plate |
104 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
105 | Dismantling & fitting of Pump. |
106 | HCP Mather & Platt Make |
107 | Repairing of pump shaft by jointing welding & turning to bearing size. |
108 | Providing, Fabrication & fitting of new pump shaft as per size and specification (7 Stage) |
109 | Providing and fitting of Brass Impellers |
110 | Providing and fitting of C.I Impellers |
111 | Repairing of brass Impellers |
112 | Repairing of C.I Impellers |
113 | Fabrication & fitting of neck ring. |
114 | Fabrication & fitting of spacer bushes. |
115 | Fabrication of Stainless steel gland bushes |
116 | Fabrication of chuck nut |
117 | Providing & Fitting of pump bowl |
118 | Repair to bearing housing by sleeve fitting & boring for bearing size |
119 | Providing of bearing housing along with side cover plates |
120 | Providing and fitting of Delivery Body |
121 | Providing and fitting of Suction Body |
122 | Replacement of ball thrust bearing-6306 |
123 | Providing, Fabrication & fitting of new pump shaft as per size and specification (9 Stage) |
124 | Replacement of Rollerbearing-NU-306 |
125 | Providing, Fabrication & fitting of new pump shaft as per size and specification (10 Stage) |
126 | Providing & Fitting of Oil seal |
127 | Fabrication & fitting of balancing plate |
128 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
129 | Dismantling & fitting of Pump. |
130 | Providing, Fabrication & fitting of new pump shaft as per size and specification 10 Stage |
131 | Providing, Fabrication & fitting of new pump shaft as per size and specification 14 Stage |
132 | HCP KSB Make |
133 | Repairing of pump shaft by jointing welding & turning to bearing size. |
134 | Providing, Fabrication & fitting of new pump shaft as per size and specification. |
135 | Providing and fitting of Brass Impellers |
136 | Providing and fitting of C.I Impellers |
137 | Repairing of brass Impellers |
138 | Repairing of C.I Impellers |
139 | Fabrication & fitting of neck ring. |
140 | Fabrication & fitting of spacer bushes. |
141 | Fabrication of Stainless steel gland bushes |
142 | Fabrication of chuck nut |
143 | Providing & Fitting of pump bowl |
144 | Repair to bearing housing by sleeve fitting & boring for bearing size |
145 | Providing of bearing housing along with side cover plates |
146 | Providing and fitting of Delivery Body |
147 | Providing and fitting of Suction Body |
148 | Replacement of ball thrust bearing-7309 |
149 | Replacement of ball thrust bearing-7308 |
150 | Providing & Fitting of Oil seal |
151 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
152 | Dismantling & fitting of Pump. |
153 | Repairing of Submersible Pump {V-8} |
154 | Repairing of pump shaft |
155 | Fabrication of pump shaft |
156 | Fabrication of Neck Ring |
157 | Fabrication of Brass Impeller |
158 | Repairs to Impellers |
159 | Fabrication of Body Bushes |
160 | Fabrication of Guide Bush |
161 | Fabrication of Spacer Bush |
162 | Providing of Cotter |
163 | Fabrication of Pump Body |
164 | Providing of Suction Body |
165 | Providing of NRV with adaptor |
166 | Labour Charges for dismantling and fitting of pump |
167 | Providing of Adaptor for V-8 Submersible motor |
168 | Providing of Coupling pulley with cotter for V-6 Submersible motor |
169 | Repairing of Submersible Pump {V-6} |
170 | Repairing of pump shaft |
171 | Fabrication of pump shaft |
172 | Fabrication of Neck Ring |
173 | Fabrication of Brass Impeller |
174 | Repairs to Impellers |
175 | Fabrication of Body Bushes |
176 | Fabrication of Guide Bush |
177 | Fabrication of Spacer Bush |
178 | Providing of Cotter |
179 | Fabrication of Pump Body |
180 | Providing of Suction Body |
181 | Labour Charges for dismantling and fitting of pump |
182 | Providing of Adaptor for V-6 Submersible motor |
183 | Providing of Coupling pulley with cotter for V-6 Submersible motor |
184 | Miscelleanous |
185 | Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side |
186 | Fabrication & providinf of 65 mm dia. flanged adaptor with threading at other side |
187 | Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side |
188 | Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side |
189 | Fabrication & providing of MS Clamp 2½" |
190 | Fabrication & providing of MS Clamp 3" |
191 | Fabrication & providing of MS Clamp 4" |
192 | Fabrication & providing of MS Clamp 6" |
193 | Fabrication of Shling for holding of 05 Ton capacity Chain block for same load |
194 | Fabrication of GI column pipes of 100 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
195 | Fabrication of GI column pipes of 80 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
196 | Fabrication of GI column pipes of 65 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
197 | Fabrication of Top column pipe of 100 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
198 | Fabrication of Top column pipe of 80 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
199 | Fabrication of Top column pipe of 65 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment.The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
200 | Fabrication of Foundation Bolts 21 No.welded with extended Steel and Chuck Nut |
201 | Fabrication of Foundation Bolts 24 No.welded with extended Steel and Chuck Nut |
202 | Fabrication of Foundation Bolts 27 No.welded with extended Steel and Chuck Nut |
203 | Fabrication of Foundation Bolts 32No.welded with extended Steel and Chuck Nut |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail