| 1 | Part I :- Working charges |
| 2 | Supply of Lead Wool |
| 3 | Supply of Hemp |
| 4 | Leak rectification work in 63 mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 5 | Leak rectification work in 75 mmPVC (Class 2 to 6) pipe line including detectingand locating leak,earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting andlowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersincluding the cost of pipe and PVC specials;PVC Pipes and specials shall be of good quality and conforming to relevant standards;PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 6 | Leak rectification work in 90 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing. |
| 7 | Leak rectification work in 90mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing. |
| 8 | Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damages to the existing utilities, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing. |
| 9 | Leak rectification work in 110mmPVC (Class 2 to 6) pipe line including detectingand locating leak, earth work excavation in all kinds ofsoilfor for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned,and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site without causing any damage to the existing utilities,including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe& specials but excluding the cost ofCIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing. |
| 10 | Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing. |
| 11 | Repairing leakage/breakage of 100 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. |
| 12 | Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 13 | Repairing leakage/breakage of 200 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 14 | Repairing leakage/breakage of 250 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 15 | Repairing leakage/breakage of 300 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 16 | Repairing leakage/breakage of 350 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 1.5 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 17 | Repairing leakage/breakage of 100 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 18 | Repairing leakage/breakage of 150 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 19 | Repairing leakage/breakage of 200 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 20 | Repairing leakage/breakage of 250 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 21 | Repairing leakage/breakage of 300 mm ACpipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valvesif any,conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned,and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, charges for removingsurplus soil from work site, including hire for tools and plant, conveyance oftools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officersexcluding the cost of pipe and CID Joints. |
| 22 | Repairing leakage/breakage of 350 mm AC pipe line by cutting and dismantling the damaged pipe portion (Up to 3.0 m) including charges for earth work excavation in all kinds of soil including tar / concrete cutting for for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new AC pipe to the required length, rejointing the pipeline using CID Joints , testing the pipe line by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers excluding the cost of pipe and CID Joints. |
| 23 | Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete. |
| 24 | Supplying andfixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for toolsand as per the direction of the department officers etc complete. |
| 25 | Leak rectification work insluice valve afterdismanitingthe same from the valve chamber, cleaning , reconditioning, repacking wherever necessery and refiting the same orginal position including hire for tools cost of bolt and nuts etc.complete 250/200/150mm. |
| 26 | Leak rectification work insluice valve afterdismanitingthe same from the valve chamber, cleaning , reconditioning, repacking wherever necessery and refiting the same orginal position including hire for tools cost of bolt and nuts etc.complete 500mm to 300 mm. |
| 27 | Fixing gland packing to 250/200/150 CI sluice valve including dismaniting and refitting the top of the valve and cost of gland packing etc.complete. |
| 28 | Fixing gland packing to 500/400/300 CI sluice valve including dismaniting and refitting the top of the valve and cost of gland packing etc.complete. |
| 29 | Rectification of joint leakages in 300mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providingcaution boards, traffic diversion, including cost ofmaterials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. |
| 30 | Rectification of joint leakages in 500mm CI Pipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and joint, conveying hemp and lead and providing lead joint after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providingcaution boards, traffic diversion, including cost ofmaterials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. |
| 31 | Rectification of leakages of 150 mm GI Pipes by replacing lengths up to 1.0m including earth work excavation in all kindss of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with GI Pipes of suitable size and jointing bythraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost ofpipe and as per the direction of departmental officers etc. complete. |
| 32 | Rectification of joint leakages in 400mm premoPipe including earth work excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged hemp and lead, conveying hemp and lead and providing lead joint after cleaning the joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providingcaution boards, traffic diversion, including cost ofmaterials and as per the direction of departmental officers etc. complete, but excluding the cost of pig lead. |
| 33 | Disconnectingwaterconnection from service mains along Asphaltroad without causing any damage to the existing lineincluding charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depthincluding consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost ofmaterials and as per the direction of departmental officers etc. complete. |
| 34 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 35 | Supply of 400mm premo pipe suit mechanical drum collar |