}

Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa, GE (AF) SIRSA-Haryana

Military Engineer Services-MES has published Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa. Submission Date for this Tender is 14-08-2021. Cranes Tenders in GE (AF) SIRSA Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

28554230
Corrigendum : Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa
Open Tender
Indian
Haryana
GE (AF) SIRSA
14-08-2021

Tender Details

Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa Repair/Maintenance/ Improvement Of Lt Panels, Apfc, Voltage Stablizer And Eot Crane Along With Allied Works At Af Stn Sirsa

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-Aug-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 14-08-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 50000.0 /-
Tender Value
Refer document

BOQ Items

NAME OF WORK : REPAIRS/MAINT/ IMPROVEMENT OF LT PANEL, APFC, VOLTAGE STABLIZER AND EOT CRANE ALONWITH ALLIED WORKS AT AF STN SIRSA
Sl. No. Item Description
1Disconnecting LT Cable Connections with carefully from Automatic Power Factor Panel and checking thoroughly at Site and replacement of unserviceable parts like indication lamp, Selector Switches, NO/ NC switches, push button and other minor parts as required at Site suitable for 35 to 80 KVAR Automatic Power Factor Panel including replacement of Internal Wiring with Copper Conductor Cable and Beading, etc. complete all as specified and as directed. Note : Engineer-in-Charge and contractor will be inspected panel before repair and prepare list of repair/replacement parts duly signed by the both parties is kept in record and submit a copy thereof be at the time of RAR.
2All as per item No. 01 here-in-before but of capacity 100 to 200 KVAR.
3S&F for replacement of Automatic Power Factor Controller Relay type 08 Step with 3 Phase/ 3 CTs, connecting Single Phase and Three Phase Capacitors, compensation of each Phase, Measures A Power Factor, complete all as specified and as directed by Engineer-in-Charge.
4S&F for replacement of Capacitor heavy duty Can (Cylindrical) 3 Phase 440 Volt, 50 Hz, 5.0 KVAR, complete all as specified and as directed by Engineer-in-Charge.
5All as per item No. 04 above but of capacity 10 KVAR.
6All as per item No. 04 above but of capacity 15 KVAR.
7All as per item No. 04 above but of capacity 20 KVAR.
8S&Ffor replacement of Capacitor duty Contactor suitable for Capacitor of capacity 5.0 KVAR, 3 Phase 440 Volt, 50 Hz with Coil Voltage 440 Volt AC, complete all as specified and as directed by Engineer-in-Charge.
9All as per item No. 08 above but of capacity 10 KVAR.
10All as per item No. 08 above but of capacity 15 KVAR.
11All as per item No. 08 above but of capacity 20 KVAR.
12S&F for replacement of MCB 6-32 Amp, 3 Pole with rupturing capacity 10 kA "C" Series, complete all as specified and as directed.
13All as per item No. 12 above but of capacity 63 Amp, 3 Pole.
14S&F for replacement of Current Transformer Resin cast 100/5 Amp, Class 1 suitable for fixing in existing Panel Board, complete all as specified and as directed.
15All as per item No. 14 above but of capacity 200/5 Amp.
16All as per item No. 14 above but of capacity 300/5 Amp.
17S&F for replacement of Multi Function Meter with Voltage, Ampere, Frequency and Power Factor with RS- 485 with wiring required at site, complete all as specified and as directed by Engineer-in-Charge.
18S&F for replacement of Electrical Insulating Mat 2.5mm thick made out of Dielectric "Elastomer" which possess elastic properties and may be natural or synthetic in nature. Should have Working Voltage - 11 KV, Proof Voltage - 22 KV, Break Down Volatge - 45 KV, Fire Retardant, fire self-extinguish within 5 Seconds of lighting, High Elongation & Tensile Strength. No tear or breakage due to Trolley movement & Foot Traffic, Resistant to Acids, Alkalis, Solvent and transformer Oil, Pasteable type can be easily pasted on Floor, Water and Moisture Proof, complete all as specified and as directed by Engineer-in-Charge.
19S&F for replacement of MCCB 63 Amp, 4 Pole, 25 kA, with spreaders complete all as specified and as directed by Engineer-in-Charge.
20All as per item No. 19 above but of capacity 100 Amp, 4 Pole, 25 KA.
21All as per item No. 19 above but of capacity 160 Amp, 4 Pole, 25 KA.
22All as per item No. 19 above but of capacity 200 Amp, 4 Pole, 35 KA.
23All as per item No. 19 above but of capacity 250 Amp, 4 Pole, 35 KA.
24All as per item No. 19 above but of capacity 320 Amp, 4 Pole, 36 KA.
25All as per item No. 19 above but of capacity 400 Amp, 4 Pole, 36 KA.
26All as per item No. 19 above but of capacity 630 Amp, 4 Pole, 36 KA.
27S&F for replacement of On Load Change Over Switch 100 Amp capacity, 4 Pole, 415 Volt, 50 Hz, with SS Enclosure and Side Handle, complete all as specified and as directed by Engineer-in-Charge.
28All as per item No. 27 above but of capacity 200 Amp, 4 Pole.
29All as per item No. 27 above but of capacity 320 Amp, 4 Pole.
30All as per item No. 27 above but of capacity 400 Amp, 4 Pole.
31All as per item No. 27 above but of capacity 630 Amp, 4 Pole.
32S&F for replacement of On Load Change Over Switch 200 Amps capacity, 4 Pole, 415 Volt, 50 Hz, suitable for fixing in existing Panel Board, complete all as specified and as directed by Engineer-in-Charge.
33All as per item No. 32 above but of capacity 320 Amp, 4 Pole.
34All as per item No. 32 above but of capacity 400 Amp, 4 Pole.
35All as per item No. 32 above but of capacity 630 Amp, 4 Pole.
36S&F Painting to Steel Tubular Pole LT upto 9 Mtr height, LT Panels, Feeder Pillar Boxes, Bus Bar Boxes, Iron Surfaces etc by scrapping Old Paint and applying Two Coats of Synthetic Enamel Paintto match the existing Colour and Black/ Yellow Straps including Writing Pole/Bus Bar/ LT Panel/ SM No. with White Paint on Black Base of Pole, complete all as specified and as directed by Engineer-in-Charge.
37Disconnecting Electric Connections with care from Voltage Stabilizer, opening & dismantling Servo Voltage Stabilizer 06 KVA to 40 KVA Capacity of any Make/ Model having Input Voltage 180 to 280, and Output 230 ± 2.5% Volt and inspecting at Site in presence of Engineer-in-Charge, transporting to Contractor’s Workshop or at existing Site for repairing and replacement of unserviceable Parts, cleaning all dust and rust from Inside/Outside and replacement and fixing of Bedding, re-installation after repairing, testing & commissioning on Full Load, complete all as specified and as directed by Engineer-in-Charge. Note : Engineer-in-Charge and contractor will be inspected panel before repair and prepare list of repair/replacement parts duly signed by the both parties is kept in record and submit a copy thereof be at the time of RAR.
38All as per item No. 37 above but of capacity 50 to 100 KVA.
39All as per item No. 37 above but of capacity 125 to 250 KVA.
40All as per item No. 37 above but of capacity 300 to 400 KVA.
41Opening & disconnecting of LT Cable Connections from Servo Voltage Stabilizer of capacity 06 KVA to 160 KVA carefully for shifting it to other location for making good of cable ducts/ trenches in the sub station of Air Force including Jhopra and reconnection of LT cable connection, complete all as specified and as directed by Engineer-in-Charge.
42All as per item No. 41 above but of capacity 200 to 400 KVA.
43M&L for replacement of Dimmer State complete with Fulcrum suitable for Servo Voltage Stabilizer 06 KVA to 40 KVA, 3 Phase, 415 Volt, complete all as specified and as directed by Engineer-in-Charge.
44All as per item No. 43 above but of capacity 50 to 100 KVA.
45All as per item No. 43 above but of capacity 125 to 250 KVA.
46All as per item No. 43 above but of capacity 300 to 400 KVA.
47M&L for replacement of Slow Speed High Torque Synchronizing Motor of suitable capacity with RC Network suitable for Servo Voltage Stabilizer 10 KVA to 40 KVA, 3 Phase, 415 Volt, complete all as specified and as directed by Engineer-in-Charge.
48All as per item No. 47 above but of capacity 50 to 100 KVA.
49All as per item No. 47 above but of capacity 125 to 250 KVA.
50All as per item No. 47 above but of capacity 300 to 400 KVA.
51M&L for replacement of Winding of Transformer/ Dimmer State with appropriate gauge Supper Enamelled Copper Wire for Servo Voltage Stabilizer 40 KVA to 400 KVA, 3 Phase, 415 Volt, complete all as specified and as directed by Engineer-in-Charge.
52M&L for replacement of Digital Servo Controller Card complete with IC’s Regulator, Transistor, Condenser, etc. suitable for Servo Voltage Stabilizer 06 KVA to 400 KVA, 3 Phase, 415 Volt, complete all as specified and as directed by Engineer-in-Charge.
53M&L Load Testing of EOT Crane of 2.5 Ton Load capacity to prove the satisfactory Operation of Electrical Controls, Motors, Gear Boxes, Protective Devices, system Interlocks and Mechanical components like Wire Rope, Weld Sections check/welding to existing Channel of the Crane in all Motions (LT CT Hoist in Hing Speed and Creep Speed) during Full Load and testing of Crane in Over Load at 100 + 25% in presence of Representative of AF Sirsa including all Consumables Items, complete all as specified and as directed by Engineer-in-Charge. NOTE :- (a) Load Blocks in denomination of 2.5 + 25% Tones required quantity shall be provided by the Contractor at his own Arrangement and Cost including shifting of these Blocks near to the Crane Load required for lower denomin-ation for which Contractor has no Extra Claim.Cost of Transportation and Handling Charges are also deem to be included in the Quoted Unit Rate. (b) Load Tests are to be carried out by the Contractor minimum ½ to 1.0 Hour duration though an Expert/Trained Technician in the relevent Field in presence of Departement Representative and will record the Test. (c) Contractor will be responsible for Servicing of Crane before Load Testing. Cost of all Consumeable Items will be deem to include in the Quoted Unit Rate including Brake Oil, Gear Oil and Grease etc. Note:- (i). All EOT Crane are of Capacity 2.5 Ton. (ii) Existing Make of EOT Cranes are Rockwell/ Tib Udhyog.
54M&L for replacement of Contactor 3 Pole suitable for 5 to 24 Volt, DC 40 Amp, complete all as specified and as directed by Engineer-in-Charge.
55M&L for replacement of Heavy duty Limit Switch with 2NO + 2NC, complete all as specified and as directed by Engineer-in-Charge.
56M&L for replacement of Normally Closed/ Normally Open Switch, complete all as specified and as directed by Engineer-in-Charge.
57M&L for replacement of PCB Card, complete all as specified and as directed by Engineer-in-Charge.
58M&L for replacement of Push Button in Yellow/Blue Colour, complete all as specified and as directed by Engineer-in-Charge.
59M&L for replacement of PVC insulated, sheathed, stranded Copper Conductor Cable of size 1.5 Sqmm, 12 Core, 1100 Volt grade, heavy duty, complete all as specified and as directed by Engineer-in-Charge.
60M&L for replacement of Thermal Over Load Relay of setting range 32 Amp, 415 Volt, 50 Hz, complete all as specified and as directed by Engineer-in-Charge.
61M&L for replacement of Transformer 3 Phase 50 VA (as approved as per existing one) having conversion capacity of 3 Phase 380 Volt, 400 Volt & 415 Volt to 110 Volt, 30 Volt, 24 Volt & 12 Volt, complete all as specified and as directed by Engineer-in-Charge.
62M&L for replacement of Wire Rope maximum 15mm dia, multi-stranded of existing Shape and Size, complete all as specified and as directed by Engineer-in-Charge.
63M&L for Realignment of Crane Rail Track including removing of Rail and replacing the damaged and perished Rubber Padding wherever and replacing the worn out Bolts, Nuts and Washers including welding new Mild Steel Clamps wherever necessary and checking of Bends straightening and refixing the Rails including Provision of necessary Packing Shoes and ensure Proper Alignment including necessary Welding Works at Corners, etc., complete all as specified and as directed by Engineer-in-Charge.
64M&L for repair and replacement of Locking Arrangement, Door Handle, Hinges, CRCA Sheet, Beddings, Insulators, Bus Bars & Legs etc complete all as specified and directed by Engineer-in-Charge.
65Supply, Installation, Connecting, Commissioning & Testing of Automation System on existing Multi Function Meter with 5 YEAR GPRS Operating Cost having Internet based Monitoring and Control System, Monitoring of Light Management System, Secured Authorised Access, Multi-user Operation and Monitoring, remote monitoring through Mobile, remotely Configurable Timer, Remote monitoring of Current consumption (Amp), Remote monitoring of Voltage (Volt), Remote monitoring of Power consumption, Remote monitoring of Auto/ Manual mode, Auto Report generation, exporting of Report to Excel, Remote monitoring and Operations through PC including Taking down/out Unserviceable Metering Arrangements, complete all as specified and as directed by Engineer-in-Charge.
66M&L for Cleaning ofthe Sub-station with cutting the Bushes, Grasses, Cleaning of Area etc. of Area upto 50 SQM with cleaning of Transformer with Platform, LTPanels with Floor/ Platform, RMU/VCB with Platform, etc. and removing cleaned material from the Sites complete all as specified and as directed by Engineer-in-Charge.
67M&L for Replacement of Dynamic Breaking Register of capacity 250 to 750 Watt, complete all as specified and as directed by Engineer-in-Charge.
68M&L for Replacement of Plastic Crane Cable Carrier, complete all as specified and as directed by Engineer-in-Charge.
69M&L for Replacement of Shoe Lining of Brakes with bolts, complete all as specified and as directed.
70Taking out of LT Air Circuit breaker of capacity 400 to 1000 Amps KV from the LT Panel and opening top cover, de-carbonizing moving and fixed contacts, lubricating, inspecting the tripping relay, tripping coil and checking for tripping system, meggaring all the contacts and fixing back the Air Circuit Breaker to LT Panel and testing complete all as specified and directed by Engineer-in-Charge.
71NOTE FOR ITEM NO:- 01 TO 70 Make/Shape/ Size required for repair and replacementshould be as per existing items as catered in this BOQ.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail