Ht/Lt Electrification Works And Augmentation Of Power System Ht/Lt Electrification Works And Augmentation Of Power System/Modernisation Of Mill
Tender Value
Ref. Documents
Estimated cost
Bid Submission
05 Aug 2021
0 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Vazhani, Thrissur → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Ht / Lt Electrification Works And Augmentation Of Power System Ht / Lt Electrification Works And Augmentation Of Power System / Modernisation Of Mill
BOQ
| Name of Work: HT/LT ELECTRIFICATION WORKS AND AUGMENTATION OF POWER SYSTEM /MODERNISATION OF MILL | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | H T INSTALLATION [11kV INCOMING AND OUT GOING PANELS- 3PANEL VCB & BUS PT - Make: [VCB&VCB\nPanel] Siemens, ABB, L&T, Schneider]: Design, fabrication, supply, installation, testing and Commissioning of 11kV VCB panel as per the scope of work, technical specification and drawing. The panel comprises of following major components. 11 kV, 800 A, 350MVA (3 sec) VCB - 3Nos. [1-I/C from Grid Supply and 2 O/Gs to 2Nos 800kVA OCTC ONAN Existing Transformers] Numerical protection relays having Modbus connectivity Digital power analyser/meter having RS 485 communication facilities Analog meters, control MCB, indication lamps, annunciator, Hooters etc. Panel lighting (LED lamp) and panel heater with temperature control thermostat. Current density of aluminium busbar: 0.8 Amps/Sq.mm. The control supply voltage is 30V DC. [REFER Technical specification and SLDs] VCB & VCB Panel shall be Manufactured by Approved VCB Manufacturer; Siemens, ABB, L&T, Schneider]\n | El-1 | 1 | SET |
| 2 | 2 | 30V DC BATTERY, BATTERY CHARGER AND DC DB.: Supply, Installation, Testing & Commissioning of indoor, floor\nmounted 30V DC power supply system with 50Amps rated float and boost type battery charger, 15 nos. of 2Volt, 160AH (minimum) stationary type SMF VRLA batteries on a suitable stand. Battery charger shall be suitable for 3 Phase, 415V ,\n50Hz ,ac input and shall be capable of delivering continuous load of 50A, complete with DC DB Panel having 50A DP MCB\nas incomer and 6 Nos.: 25A DP MCB's as outlets. [REFER Technical specification and SLDs]\n | El-2 | 1 | SET |
| 3 | 3 | 11kV CABLES AND CABLING:- Supply, Laying/ clamping testing and commissioning of the following HT Cable with\nStranded compact circular ALUMINIUM conductor, conductor screened with Extruded semiconducting compound, XLPE Insulated, Insulation Screened with Extruded semiconducting compound in combination with Copper Tape, Aluminium Flat Strip / Round Wire armoured, and overall PVC ST2 Sheathed cable Conforming to IS:7098 Part-II 2011 with latest amendments.\n3C X 300 SQ.MM. HT cable\n | El-3 | 165 | MTR |
| 4 | 4 | H T CABLE TERMINATIONS: Supply and providing end termination for the following sizes of HT XLPE cables including all\nmaterials required for frim joints. (Heat shrinkable type, Raychom/ M Seal Make)----- \n3Cx300 SQ.MM OUTDOOR\n | El-4 | 1 | Each |
| 5 | 5 | 3Cx300 SQ.MM INDOOR | El-5 | 5 | Each |
| 6 | 6 | EMERGENCY OFF PUSH BUTTON:- Supply, Installation ,testing and commissioning of Lockable Push Button for\nEmergency OFF facility of the HT VCB Panel for the Incomer VCB. [Cable shall also be included, Out side Transformer Room-1, Out side Transformer Room-2 & I/C VCB]\n | El-6 | 3 | Each |
| 7 | 7 | OUT DOOR CT/PT UNITS FOR SUPPLIERS METERING: Supply, installation, testing and commissioning of 11kV outdoor\ntype CT/PT unit with, class 0.2S, 15VA CT with suitable ration as required as per KSEBL and 11kV/110V class 0.2S,\n150VA PT on the existing DP structure with all necessary accessories for connecting 11kV lines, control cable, etc. as required. The existing CT PT Unit, Metering KIOSK and control cable shall be dismantled from the structure and stacked in stores as directed by the engineer in charge / consultant. The Unit shall be duly tested at the TMR section of KSEB and the certificates should be submitted to the concerned authorities for obtaining HT supply/ Regularised, as required.\n | El-7 | 1 | Each |
| 8 | 8 | TOD METER - SUPPLIERS METERING]:- Supply, Installation ,testing and commissioning of a TOD meter for KSEB within\nHT Metering panel including connections from CT and PT etc. as per KSEB/ Suppliers recommendation. The Meter shall be duly tested at the TMR section of KSEB and the certificates should be submitted to the concerned authorities for obtaining HT supply, as required. [Make L&T; Trivector Meter Class 0.2s, Model ER300P Class 0.2s (Base Mounting) OR\nEquivalent. All statutory chargers shall be reimbursed from clients on production of proper receipts.\n | El-8 | 1 | Each |
| 9 | 9 | TOD METER KIOSK [OUTDOOR]:- Supply, Installation, testing and commissioning of HT Out door Metering KIOSK/Panel\nwith glass window and sufficient number of terminal connectors with 25% spares, for connections from CT and PT etc. as per KSEB/ Suppliers recommendation, Control fuses, etc. The KIOSK shall be made out of 2mm thick CRCA sheet steel, totally enclosed, IP 54, weather proof, with rain guard, undergone seven tank process, powder coated finish, earthing, entire civil work including suitable foundation and all mounting accessories as required complete as per the requirement of KSEBL.\n | El-9 | 1 | Each |
| 10 | 10 | M. V PANELS/ DISTRIBUTION BOARDS- SSB#01 & SSB#02: [GENERAL SPECIFICATIONS:] Supply, installation, testing and commissioning of front operated free standing indoor cubicle type MV panel suitable for operation of 415V, 3 phase, 4 wire, 50Hz AC supply system and to with stand a short circuit level of 50kA rms symmetrical. The panel shall be made up of 14 SWG CRCA sheet with necessary anti corrosive treatment and shall be dust and vermin proof construction (IP 54) suitable for installation on floor. The panels shall be fully compartmentalised, duly rust inhibited, degreasing, zinc phosphating etc. and Powder coated with approved colour with hinged and earthed front doors, name plate, danger notice board, heavy duty rubber gaskets, removable gland plates made of 3 mm thick sheet steel, with all connections and inter- connections and having appropriate rating busbars & earth bus. The busbars should be of suitably rated TPN Aluminium having the specified normal and short circuit capacities and should be insulated with heat shrinkable colour coded PVC sleeves and supported by DMC/SMC pillar/finger type busbar supports. The panel shall be manufactured as per the standards and requirements of State Electrical Inspectorate, Supply authority’s and Bureau of Indian standards. (Cable entry according to site conditions). Door shall be properly gasketed to avoid entry of moisture. All components, panels, cables etc. shall conform to relevant IS specifications and shall also be got approved by the EIC. Front door of the switches, cable alley shall be hinged type and earthed properly, All control wires shall be 1.1 kV grade, FRLS 2.5 Sq.mm Copper wire. Panel shall be fabricated only by an agency having both ISO & CPRI certification and shall be approved by the client/ consultant. Design and fabrication of the switch boards should be as per standards of State electrical inspectorate, Power Supply Company and Bureau of Indian standards. The panel drawings should be submitted for approval before the Consultants/ Client's Engineer before manufacturing. (Cable entry according to site conditions). All MCCs Shall be wired and completed in consultation with the Machinery Manufacturer OR their drawings/ layouts and shall be compatible with all the specific requirements and also provision for connecting control cables/ control equipment / control relays [if any] for fulfilling the satisfactory completion/ commissioning of plant and machinery. All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. ------\n\nSSB-01 AND SSB-02 (CARDING):\nBusbars: 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A / Sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. Incomer-Grid Supply: 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side: 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units. \nOut Goings: 6 Set and 5 Set 63A 3 Pole with neutral, MCCB, 25KA (Ics)\n | El-10 | 2 | SET |
| 11 | 11 | SSB-03 (DRAWING) Description same as of MV Panels/ Distribution Boards but comprising the following specific\n\ncomponents:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A/ sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. INCOMER - 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments- Incomer Side: 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units\nOUTGOINGS - 3 Set. 63A 3 Pole with neutral, MCCB, 25KA (Ics), 3 Set. 50A 3 Pole with neutral, MCCB, 25KA (Ics), 2\nSet. 40A 3 Pole with neutral, MCCB, 25KA (Ics), All MCCBs shall be provided with setting range of 0.8-1.0 - Set as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock.\n | El-11 | 1 | SET |
| 12 | 12 | SSB-04 AND SSB-05 (SIMPLEX): Description same as of MV Panels/ Distribution Boards but comprising the following\n\nspecific components Busbars:- 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. \nINCOMER - 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments- Incomer Side - 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs,\n2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units. \nOUT GOINGS - 5 Set and 6 set 50A 3 Pole with neutral, MCCB, 25KA (Ics), All MCCBs shall be provided with setting range of 0.8-1.0 – Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock.\n | El-12 | 2 | SET |
| 13 | 13 | SSB-06 (COMBER) Description same as item No. 2.0 above but installed separately at control room and comprising the\n\nfollowing specific components:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. \nINCOMER: 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, Etc. complete 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units.\nOUTGOINGS: 6 Set. 40A 3 Pole with neutral, MCCB, 25KA (Ics), All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock.\n | El-13 | 1 | SET |
| 14 | 14 | MCC-A AND MCC-B (HUMIDIFICATION PLANT FOR SPG-I&II) Description same as item No. 2.0 above but installed\nseparately at control room and comprising the following specific components: - Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. \nINCOMER - 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side- 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units. \nOUTGOINGS: 2 Set. 80A 3 Pole with neutral, MCCB, 25KA (Ics), 4 Set. 50A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set. 25A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set. 20A 3 Pole with neutral, MCCB, 25KA (Ics), 1 set 18.5 kW- Fully Automatic STAR-DELTA Starter, 3 set 11.2 kW- Fully Automatic STAR-DELTA Starter, 3 set 11.2 kW- Fully Automatic STAR-DELTA Starter, 1 set 4.0 kW- Three Phase DOL Starter, 1 set 0.75 kW- Three Phase DOL Starter, 1 set 0.55 kW- Three Phase DOL Starter. All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. All Star / Delta OR DOL Starters shall be provided with all necessary accessories, Thermal O/L Relay, Single phasing Preventer, start /stop illuminated Push Buttons, Remote control Etc. complete. The Panel shall also have provision for accommodating the VFD Provided by the M/C Supplier for pump Control with all connections/ terminations/ control wiring etc. complete as required.\n | El-14 | 2 | SET |
| 15 | 15 | MCC-C (EXHAUST PLANT FOR SPG-I,II&III): Description same as item No. 2.0 above but installed separately at control\n\nroom and comprising the following specific components:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD:\n\n0.8A/ sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. INCOMER- 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side - 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units. OUTGOINGS:- 4 Set. 63A 3 Pole with neutral, MCCB, 25KA (Ics), 4 Set. 32A 3\nPole with neutral, MCCB, 25KA (Ics), 1 Set. 20A 3 Pole with neutral, MCCB, 25KA (Ics), 3 set 15.0 kW- Fully Automatic STAR-DELTA Starter, 3 set 5.5 kW- Fully Automatic STAR-DELTA Starter, 1 set 0.55 kW- Three Phase DOL Starter. All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. All Star / Delta OR DOL Starters shall be provided with all necessary accessories, Thermal O/L Relay, Single phasing Preventer, start /stop\nilluminated Push Buttons, Remote control, Etc. complete.\n | El-15 | 1 | SET |
| 16 | 16 | MCC-D (EXHAUST PLANT FOR SPG-IV&V): Description same as item No. 2.0 above but installed separately at control\n\nroom and comprising the following specific components:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD:\n\n0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. INCOMER- 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side - 1 No. Digital Combination meter with Voltage and Current\nvalues with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, Etc. 1 Sets RYB Indicating lamps\n\nLED, with 2A HRC Control Fuses & fuse units. OUTGOINGS:- 3 Set. 63A 3 Pole with neutral, MCCB, 25KA (Ics), 3 Set.\n\n32A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set. 20A 3 Pole with neutral, MCCB, 25KA (Ics), 2 set 15.0 kW- Fully Automatic STAR-DELTA Starter, 2 set 5.5 kW- Fully Automatic STAR-DELTA Starter, 1 set 0.55 kW- Three Phase DOL Starter, All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. All Star / Delta OR DOL Starters shall be provided with all necessary accessories, Thermal O/L Relay, Single phasing Preventer,\nstart /stop illuminated Push Buttons, Remote control, Etc. complete.\n | El-16 | 1 | SET |
| 17 | 17 | MCC-E (SUPPLY&EXHAUST PLANT FOR PREPARATORY):- Description same as item No. 2.0 above but installed\nseparately at control room and comprising the following specific components:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD: 0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. INCOMER: 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side 1 No. Digital Combination meter with Voltage and Current values with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units OUTGOINGS: 4 Set. 63A 3 Pole with neutral, MCCB, 25KA (Ics), 2\nSet. 50A 3 Pole with neutral, MCCB, 25KA (Ics), 1 Set. 32A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set. 25A 3 Pole with neutral, MCCB, 25KA (Ics), 1 Set. 20A 3 Pole with neutral, MCCB, 25KA (Ics), 2 set 15.0 kW- Fully Automatic STAR-DELTA Starter, 2 set 5.5 kW- Fully Automatic STAR-DELTA Starter, 1 set 0.55 kW- Three Phase DOL Starter, All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD OR as per the\nApproval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. All Star / Delta OR DOL Starters shall be provided with all necessary accessories, Thermal O/L Relay, Single phasing Preventer, start /stop illuminated Push Buttons, Remote control. The Panel shall also have provision for accommodating the VFD Provided by the M/C Supplier for pump Control with all connections/ terminations/ control wiring etc. complete as\nrequired.\n | El-17 | 1 | SET |
| 18 | 18 | MCC-F (SUPPLY&EXHAUST PLANT FOR POST SPG) Description same as item No. 2.0 above but installed separately\n\nat control room and comprising the following specific components:- Busbars: 200A TPN Al. Busbar - 1Set. [Minimum CD:\n\n0.8A/sq.mm, AL] & Earth bus - 25.4 x 6.3mm CU. INCOMER - 1 Set. 200A TPN Isolator, with rotary front drive, door inter lock and pad lock. Meters and instruments-Incomer Side- 1 No. Digital Combination meter with Voltage and Current\nvalues with 3Nos 200/5A, 10VA, Class 0.5, CTs, 2A HRC Control Fuses & fuse units, Etc. complete, 1 Sets RYB Indicating lamps LED, with 2A HRC Control Fuses & fuse units OUTGOINGS:- 3 Set. 80A 3 Pole with neutral, MCCB,\n25KA (Ics), 2 Set. 50A 3 Pole with neutral, MCCB, 25KA (Ics), 1 Set. 32A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set.\n\n25A 3 Pole with neutral, MCCB, 25KA (Ics), 2 Set. 20A 3 Pole with neutral, MCCB, 25KA (Ics), 2 set 18.0 kW- Fully Automatic STAR-DELTA Starter, 1 set 11.2 kW- Fully Automatic STAR-DELTA Starter, 1 set 5.5 kW- Fully Automatic STAR- DELTA Starter, 1 set 4.0 kW- Three Phase DOL Starter, 1 set 0.75 kW- Three Phase DOL Starter, 1 set 0.55 kW- Three Phase DOL Starter. All MCCBs shall be provided with setting range of 0.8-1.0 - Sets as per Connected load at site/SLD\nOR as per the Approval from the approving Authority, and shall be provided with rotary front drive, door inter lock and pad lock. All Star / Delta OR DOL Starters shall be provided with all necessary accessories, Thermal O/L Relay, Single phasing Preventer, start /stop illuminated Push Buttons, Remote control, Etc. complete. The Panel shall also have provision for accommodating the VFD Provided by the M/C Supplier for pump Control with all connections/ terminations/ control wiring\netc. complete as required.\n | El-18 | 1 | SET |
| 19 | 19 | REPAIRE AND MAINTENANCE OF LT PANELS Supply of all necessary materials and carrying out repair and\nmaintenance works of the following LT panels [Existing] as shown in the One Line Diagrams. The scope of works only includes cleaning, priming, spray painting with required colour [Grey], replacing of Bus Bar insulators/sleeves [where ever required] / SMC Supports [Pillar Type/ Finger Type], PVC Sleeves [where ever required], etc. and testing and commissioning. All panels boards shall be tested at site [SAT] and ensure all the values are sufficient and satisfactory as\nper standards and requirements at the point of electrical safety rules as per CEA regulations/ KSEI Guidelines/ Orders and shall be recorded in presence of the Engineer in Charge/ Consultant. ------- MSB [MAIN MV PANEL-DOUBLE BUS PANEL]\n | El-19 | 1 | SET |
| 20 | 20 | PCC-1 | El-20 | 1 | SET |
| 21 | 21 | PCC-2 | El-21 | 1 | SET |
| 22 | 22 | PCC-3 | El-22 | 1 | SET |
| 23 | 23 | PCC-4 | El-23 | 1 | SET |
| 24 | 24 | PCC-5 | El-24 | 1 | SET |
| 25 | 25 | PCC-6 | El-25 | 1 | SET |
| 26 | 26 | PCC-7 | El-26 | 1 | SET |
| 27 | 27 | PCC-8 | El-27 | 1 | SET |
| 28 | 28 | PCC-9 | El-28 | 1 | SET |
| 29 | 29 | PCC-9-A | El-29 | 1 | SET |
| 30 | 30 | PCC-10 | El-30 | 1 | SET |
| 31 | 31 | BUS DUCT 2000A, 4POLE, 415V. | El-31 | 20 | Mtr |
| 32 | 32 | RETROFITTING DAMAGED SWITCHGEARS/ COMPONENTS.: Supply, installation, testing and commissioning of the\nfollowing switch gears within the existing LT Panel Boards including necessary cutting, drilling, extension of Bus Bars, Interconnections etc. as required as per standards complete. The scope also includes dismantling and stacking of existing damages switches/ bus bars etc. as directed by the Engineer in Charge/ Consultant. ---- \n400A TPN Isolators Incomer of PCC-10\n\n | El-32 | 2 | Each |
| 33 | 33 | RETROFITTING DAMAGED SWITCHGEARS/ COMPONENTS.: Supply, installation, testing and commissioning of the\nfollowing switch gears within the existing LT Panel Boards including necessary cutting, drilling, extension of Bus Bars, Interconnections etc. as required as per standards complete. The scope also includes dismantling and stacking of existing damages switches/ bus bars etc. as directed by the Engineer in Charge/ Consultant. ---- \n630 A TPN Isolators or MCCB Incomer of MSB\n\n | El-33 | 2 | Each |
| 34 | 34 | 315A TPN Switch Fuse Units | El-34 | 1 | Each |
| 35 | 35 | 250A TPN Switch Fuse Units | El-35 | 4 | Each |
| 36 | 36 | 100A TPN Switch Fuse Units | El-36 | 6 | Each |
| 37 | 37 | 63A TPN Switch Fuse Units | El-37 | 4 | Each |
| 38 | 38 | Heavy Duty APP Capacitors of Different ratings within the APFC Panel | El-38 | 250 | kVAR |
| 39 | 39 | HRC FUSE LINKS: Supply, installation, testing and commissioning of the following rating HRC Fuse Links DIN Type\n[Bolted Type for lower rating] suitable for 315A/ 250A/100A/63A SFUs within the existing Panel Boards/ Switchgears. The Fuse links shall be provided as per the Standards and requirements of the Scheme Approval from the Department of Electrical Inspectorate in order to achieve Grading in between sections. The scope also includes dismantling and stacking of existing damages FUSE LINKS as directed by the Engineer in Charge/ Consultant. \n400A\n | El-39 | 3 | Each |
| 40 | 40 | 300A/315A | El-40 | 30 | Each |
| 41 | 41 | 250A | El-41 | 3 | Each |
| 42 | 42 | 200A | El-42 | 6 | Each |
| 43 | 43 | 160A | El-43 | 36 | Each |
| 44 | 44 | 150A | El-44 | 36 | Each |
| 45 | 45 | 125A | El-45 | 33 | Each |
| 46 | 46 | 120A | El-46 | 21 | Each |
| 47 | 47 | 100A | El-47 | 9 | Each |
| 48 | 48 | 80A | El-48 | 72 | Each |
| 49 | 49 | 63A | El-49 | 3 | Each |
| 50 | 50 | 50A | El-50 | 3 | Each |
| 51 | 51 | 40A/35A | El-51 | 6 | Each |
| 52 | 52 | 25A | El-52 | 3 | Each |
| 53 | 53 | 2A [Control Fuses] | El-53 | 60 | Each |
| 54 | 54 | METERS AND INSTRUMENTS: Supply, installation, testing and commissioning of the following instruments/ Cast Resin\nCTs/ panel accessories within the existing Panel Boards. The CTs shall be provided as per the Standards and requirements of the Scheme Approval from the Department of Electrical Inspectorate. The scope also includes dismantling and stacking of existing damages CTs/ Components Etc. as directed by the Engineer in Charge/ Consultant. --- RYB/ Trip Indication Lamps LED\n | El-54 | 48 | Each |
| 55 | 55 | Cast Resin CTs 1250/5A, Class 05, 10VA | El-55 | 6 | Each |
| 56 | 56 | Cast Resin CTs 400/5A, Class 05, 10VA | El-56 | 39 | Each |
| 57 | 57 | Cast Resin CTs 300/5A, Class 05, 10VA | El-57 | 3 | Each |
| 58 | 58 | 25A HRC Fuse Units [Control Fuses] | El-58 | 60 | Each |
| 59 | 59 | Digital Combination Meters V,A,F,PF, kVA, PF & kWhr | El-59 | 2 | Each |
| 60 | 60 | Digital Combination Meters V,A & F | El-60 | 14 | Each |
| 61 | 61 | Analogue Ammeters [0-1250A] | El-61 | 6 | Each |
| 62 | 62 | Analogue Volt meters [0-500V] | El-62 | 2 | Each |
| 63 | 63 | Volt Meter Selector Switches | El-63 | 2 | Each |
| 64 | 64 | Mechanical Interlocks between Switchgears | El-64 | 10 | Set |
| 65 | 65 | LOCAL ISOLATION FOR MOTORS/ EQUIPMENTS:- Supply, Installation, Testing and commissioning of Lockable OFF\nPBs with in suitable Sheet Steel Powder coated enclosures complete.\n | El-65 | 20 | Each |
| 66 | 66 | Supply, Installation, Testing and commissioning of 32A TP Isolators, MCB Type with in suitable Sheet Steel Powder coated\nenclosures complete.\n | El-66 | 12 | Each |
| 67 | 67 | Supply, Installation, Testing and commissioning of 63A TP Isolators, MCB Type with in suitable Sheet Steel Powder coated\nenclosures complete. | El-67 | 4 | Each |
| 68 | 68 | POWER FACTOR IMPROVEMENT CAPACITORS: Supply, Installation, Testing and commissioning of the following\nratings Heavy Duty, APP Capacitors with in suitable Sheet Steel Powder coated enclosures, and giving connections as direct connection near by Motors/ Equipments, complete. --- 15kVAR\n | El-68 | 20 | Each |
| 69 | 69 | 10kVAR | El-69 | 6 | Each |
| 70 | 70 | LT CABLES AND CABLING:- Supply, laying, Testing and Commissioning of the following sizes of 650/1100 Volts Power/\nControl Cables with Aluminium/ Copper Conductor (Solid up to 10 sqmm and Stranded for balance), XLPE Insulated, Cores Laid Up, Inner Sheathed, Armoured and Extruded PVC Type ST2 Outer Sheathed As Per IS-7098 (Part 1) 2011 with Up To Date Amendments. The cables shall be laid in cable trenches or on wall or through pipes as per specifications, including providing of cable route makers in every 50M and at all strategic turning/ diversion points [if burried Directly in ground],\netc. Necessary clamping should be providing while burying cables in prepared trenches etc.as per standards.\n\nALUMINIUM CONDUCTOR POWER CABLE --- \n3.5x240 Sq.mm AL Armoured\n | El-70 | 200 | MTR |
| 71 | 71 | 3.5x185 Sq.mm AL Armoured | El-71 | 150 | MTR |
| 72 | 72 | 3.5x150 Sq.mm AL Armoured | El-72 | 10 | MTR |
| 73 | 73 | 3.5x120 Sq.mm AL Armoured | El-73 | 1000 | MTR |
| 74 | 74 | 3.5x95 Sq.mm AL Armoured | El-74 | 150 | MTR |
| 75 | 75 | 3.5x70 Sq.mm AL Armoured | El-75 | 100 | MTR |
| 76 | 76 | 3.5x50Sq.mm AL Armoured | El-76 | 100 | MTR |
| 77 | 77 | 3.5x35Sq.mm AL Armoured | El-77 | 10 | MTR |
| 78 | 78 | 3.5x25Sq.mm AL Armoured | El-78 | 10 | MTR |
| 79 | 79 | 3.0x25Sq.mm AL Armoured | El-79 | 110 | MTR |
| 80 | 80 | 4.0x16Sq.mm AL Armoured | El-80 | 100 | MTR |
| 81 | 81 | 3.0x16Sq.mm AL Armoured | El-81 | 270 | MTR |
| 82 | 82 | 4.0x10Sq.mm AL Armoured | El-82 | 200 | MTR |
| 83 | 83 | 3.0x10Sq.mm AL Armoured | El-83 | 310 | MTR |
| 84 | 84 | 4.0x6Sq.mm AL Armoured | El-84 | 10 | MTR |
| 85 | 85 | 3.0x6Sq.mm AL Armoured | El-85 | 1200 | MTR |
| 86 | 86 | 4.0x4 Sq.mm AL Armoured | El-86 | 10 | MTR |
| 87 | 87 | 3.0x4Sq.mm AL Armoured | El-87 | 1200 | MTR |
| 88 | 88 | COPPER CONDUCTOR POWER CABLE --- \n4.0x50Sq.mm - Cu Armoured\n | El-88 | 100 | MTR |
| 89 | 89 | 4.0x25Sq.mm - Cu Armoured | El-89 | 40 | MTR |
| 90 | 90 | 4.0x16Sq.mm - Cu Armoured | El-90 | 400 | MTR |
| 91 | 91 | 4.0x10Sq.mm - Cu Armoured | El-91 | 800 | MTR |
| 92 | 92 | 4.0x4Sq.mm - Cu Armoured | El-92 | 1 | MTR |
| 93 | 93 | 3.0x4Sq.mm - Cu Armoured | El-93 | 35 | MTR |
| 94 | 94 | 4.0x2.5Sq.mm - Cu Armoured | El-94 | 165 | MTR |
| 95 | 95 | 3.0x2.5Sq.mm - Cu Armoured | El-95 | 600 | MTR |
| 96 | 96 | COPPER CONDUCTOR CONTROL CABLE 16.0x1.5Sq.mm | El-96 | 74 | MTR |
| 97 | 97 | 12.0x1.5Sq.mm - Cu Armoured | El-97 | 246 | MTR |
| 98 | 98 | 10.0x1.5Sq.mm - Cu Armoured | El-98 | 45 | MTR |
| 99 | 99 | 8.0x1.5Sq.mm - Cu Armoured | El-99 | 96 | MTR |
| 100 | 100 | 7.0x1.5Sq.mm - Cu Armoured | El-100 | 32 | MTR |
| 101 | 101 | 6.0x1.5Sq.mm - Cu Armoured | El-101 | 38 | MTR |
| 102 | 102 | 4.0x1.5Sq.mm - Cu Armoured | El-102 | 128 | MTR |
| 103 | 103 | 3.0x1.5Sq.mm - Cu Armoured | El-103 | 1 | MTR |
| 104 | 104 | 2.0x1.5Sq.mm - Cu Armoured | El-104 | 1 | MTR |
| 105 | 105 | 3Cx0.75sQ.mm Copper Shielded Cable | El-105 | 90 | MTR |
| 106 | 106 | CABLE TERMINATIONS- ALUMINIUM CONDUCTOR POWER CABLE:- Supply and providing end terminations using\nsiemens type compression gland for PVC insulated and PVC sheathed armoured conductor cable 1.1KV grade for the followings sizes including earthing the glands as required as per standards.--- \n3.5x240 Sq.mm\n | El-106 | 4 | Each |
| 107 | 107 | 3.5x185 Sq.mm | El-107 | 10 | Each |
| 108 | 108 | 3.5x150 Sq.mm | El-108 | 2 | Each |
| 109 | 109 | 3.5x120 Sq.mm | El-109 | 50 | Each |
| 110 | 110 | 3.5x95 Sq.mm | El-110 | 10 | Each |
| 111 | 111 | 3.5x70 Sq.mm | El-111 | 2 | Each |
| 112 | 112 | 3.5x50Sq.mm | El-112 | 4 | Each |
| 113 | 113 | 3.5/3.0x35Sq.mm | El-113 | 2 | Each |
| 114 | 114 | 3.5x25Sq.mm | El-114 | 2 | Each |
| 115 | 115 | 3.0x25Sq.mm | El-115 | 8 | Each |
| 116 | 116 | 4.0x16Sq.mm | El-116 | 2 | Each |
| 117 | 117 | 3.0x16Sq.mm | El-117 | 16 | Each |
| 118 | 118 | 4.0x10Sq.mm | El-118 | 1 | Each |
| 119 | 119 | 3.0x10Sq.mm | El-119 | 8 | Each |
| 120 | 120 | 4.0x6Sq.mm | El-120 | 1 | Each |
| 121 | 121 | 3.0x6Sq.mm | El-121 | 12 | Each |
| 122 | 122 | 3.0 x 4 Sq.mm | El-122 | 40 | Each |
| 123 | 123 | CABLE TERMINATIONS- COPPER CONDUCTOR POWER CABLE \n4.0/3.5x50 Sq.mm\n | El-123 | 12 | Each |
| 124 | 124 | 4.0x25Sq.mm | El-124 | 16 | Each |
| 125 | 125 | 4.0x16Sq.mm | El-125 | 50 | Each |
| 126 | 126 | 4.0x10Sq.mm | El-126 | 40 | Each |
| 127 | 127 | 4.0x4Sq.mm | El-127 | 2 | Each |
| 128 | 128 | 3.0x4Sq.mm | El-128 | 2 | Each |
| 129 | 129 | 4.0x2.5Sq.mm | El-129 | 8 | Each |
| 130 | 130 | 3.0x2.5Sq.mm | El-130 | 6 | Each |
| 131 | 131 | CABLE TERMINATIONS- COPPER CONDUCTOR CONTROL CABLE --\n16.0x1.5Sq.mm\n | El-131 | 4 | Each |
| 132 | 132 | 12.0x1.5Sq.mm | El-132 | 8 | Each |
| 133 | 133 | 10.0x1.5Sq.mm | El-133 | 2 | Each |
| 134 | 134 | 8.0x1.5Sq.mm | El-134 | 4 | Each |
| 135 | 135 | 7.0x1.5Sq.mm | El-135 | 2 | Each |
| 136 | 136 | 6.0x1.5Sq.mm | El-136 | 2 | Each |
| 137 | 137 | 4.0x1.5Sq.mm | El-137 | 8 | Each |
| 138 | 138 | 3.0x1.5Sq.mm | El-138 | 2 | Each |
| 139 | 139 | 3.0x1.5Sq.mm | El-139 | 2 | Each |
| 140 | 140 | 3Cx0.75sQ.mm Copper Shielded Cable | El-140 | 2 | Each |
| 141 | 141 | GENERAL EARTHING - BARE COPPER EARTHING CONDUCTORS:- Supply, Laying/ fixing of earthing conductor with\nPurity not less than 99% of the following sizes/ type, jointing as per IS:3043/87 in trench walls pulling through pipes etc.as required. All joints in the system shall be braced properly with lead. \n50x6 mm Copper Strip\n | El-141 | 1 | MTR |
| 142 | 142 | 40x6 mm Copper Strip | El-142 | 1 | MTR |
| 143 | 143 | 31x6 mm Copper Strip | El-143 | 1 | MTR |
| 144 | 144 | 25x3 mm Copper Strip | El-144 | 270 | MTR |
| 145 | 145 | Copper wire No.4 SWG | El-145 | 310 | MTR |
| 146 | 146 | Copper wire No.10 SWG | El-146 | 800 | MTR |
| 147 | 147 | GENERAL EARTHING - HOT DIP GI EARTHING CONDUCTORS:- Supply, Laying/ fixing of earthing conductor of the\nfollowing sizes/ type, jointing as per IS:3043/87 in trench walls pulling through pipes etc.as required. All joints in the system shall be welded properly and epoxy painted after priming. \n50x6 mm HD GI Strip\n | El-147 | 560 | MTR |
| 148 | 148 | 40x6 mm HD GI Strip | El-148 | 470 | MTR |
| 149 | 149 | 31x6 mm HD GI Strip | El-149 | 360 | MTR |
| 150 | 150 | 25x6 mm HD GI Strip | El-150 | 320 | MTR |
| 151 | 151 | MAINTENANCE OF EARTHING STATIONS: Supply of all necessary materials and carrying out repair works of the\nexisting stations including replacing of damaged bolts/ nuts/ washers/ bracing the ends, etc. and taking earth reading in presence of the EIC/ Consultant to obtain a satisfactory value for each station, etc. complete.\n | El-151 | 10 | Each |
| 152 | 152 | MISCELLANEOUS ITEMS:- Supply and Fixing of FRAMED KEY ONE LINE DIAGRAM in A-1 Size with frame work and\nglass at desired locations including supply of all fixing materials as required and as directed by EIC/ Consultant.\n | El-152 | 2 | Each |
| 153 | 153 | Supply and fixing of standard Shock Treatment Chart with frame work and glass including supply of all fixing materials as\nrequired and as directed by EIC/ Consultant\n | El-153 | 4 | Each |
| 154 | 154 | CABLE TRAYS/ SUPPORTS: Supply and Erection of Vertical/Horizontal type M.S. Cable Trays and cable supports\nfabricated out of M.S Angles (ISA) and M.S. flats with sufficient width and spacing between successive cross members and supported at adequate spacing. The cable trays and supports 'shall be painted with 2coats of Zinc chromate 'primer and\n2coats of enamel paint. 25x25x6mm MS angles and 20x6mm MS flats shall be used for trays up to 450mm wide and\n40x40x6mm MS angles and 20x6mm MS flats shall be used for trays up to 900mm wide.\n | EI-154 | 1200 | KG |
| 155 | 155 | CIVIL WORKS: Excavation of soil in all classes up to a depth of 750mm suitable for Cable Trench directly burying and\nbackfilling with excavated soil after laying of cable including supply and laying of bricks, sand cushioning, etc. as required as per the standards for cable laying.\n | EI-155 | 12 | MTR |
| 156 | 156 | CT&PT METER TESTING: Transporting CT/PT units and TOD meter (11KV) to the testing laboratories of KSEB and\nobtaining the necessary certificates for approval and load sanction from power supply company.\n | EI-156 | 1 | LS |
| 157 | 157 | TRANSFORMER PROTECTION CUM MAINTENANCE:- 'Supply and Providing protection Class, Cast Resin, CTs suitable\nfor REF Protection Relay [4 CT Method], Class PS, 10VA with suitable ID and outer dimensions.\n | EI-157 | 8 | Each |
| 158 | 158 | Supply and Providing protection Class, Cast Resin, CTs suitable for Low set E/F Protection Relay. The NCT provided in the\nEarthing conductor shall be provided with necessary control box and supports.\n | EI-158 | 2 | Each |
| 159 | 159 | Supply and providing Buchholz Relay, Oil Temperature and Winding Temperature [high] Indicators [OTI&WTI], with\n\nmarshalling box and provision for alarm trip at Primary Breaker.\n | EI-159 | 2 | Set |
| 160 | 160 | Supply of all necessary materials, labour etc. and carrying out Over all maintenance for the Existing 800 kVA ONAN OCTC\nTransformer, replacement of full set Gasket, Breather, Cleaning, Priming and Painting with approved colour Epoxy Paint, etc. complete. Test certificates/reports shall also be issued after conducting all necessary routine tests, through competent and approved agency.\n | EI-160 | 2 | Set |
| 161 | 161 | Supply and Filling of Brand New Transformer Oil as per IS 335 of sufficient quantity for 800kVA ONAN Transformer, [740\n Litre] tested for BDV including draining out the old oil, cleaning and washing the tank etc. complete.\n | EI-161 | 2 | Set |
| 162 | 162 | Supply and providing new Radiators (4nos) with dimensions of (1100mm x 520mm x 10 fins.). Butterfly valve (8nos) along\nwith fasteners and all necessary accessories, pipes etc. This scope includes all necessary fabrication, assembling and including replacing the existing tank, complete.\n | EI-162 | 2 | Set |
| 163 | 163 | RENOWATION OF 4 POLE STRUCTURE: Supply off all materials necessary for refurbishing of Four pole structure including patch works for rusted RS Joists, MS channels, Angles, cutting, welding, aluminium painting etc. including supply and installation of following overhead line accessories :- 2 Sets- of 11KV, 400A, 3 phase gang operated , vertical single make/break type off load Air break switches with operating rods, handle locking arrangements, 2 sets -DO fuses, 2 sets-\n9kV, 5kA, Lightning arrestors, 11KV pin insulators, 11KV Disc insulators & complete with all hardware, re-conditioning of SWG '0' Copper Jumpering, 25x3mm Cu Earthing the structure, bolts, nuts, etc., 6 SWG Copper for Lightning arrestor earthing including repairing and painting of all round fencing to a height of 1.8 meter with all-round clearance of 1.25 meter and filling of 40mm granite jelly in the yard all as per standard requirements of Electrical inspectorate.\n | EI-163 | 1 | lS |
| 164 | 164 | DOCUMENTS & APPROVAL- ELECTRICAL INSPECTORATE APPROVALS & SANCTION ORDERS: Preparation of all\ndocuments, applications, forms and conducting Soil resistivity tests, submission of Scheme, obtaining Scheme Approval, Conducting Electrical Inspection, as installed drawings, obtaining Energisation Sanction Orders for the Entire Installation including installations/ equipment/ panels/ loads, etc. existing at the premises but to be regularised as per statutes, etc. complete. (Excluding statutory charges).\n | EI-164 | 1 | lS |
| 165 | 165 | SUPPLY AUTHORITY CONNECTED LOAD/ CD REGULARISATION: 'Preparation of necessary documents, forms, drawings, schemes, certificates, submitting completion reports, Executing HT Supply Agreement, etc. and obtaining Power sanction/ additional Power Sanction service connection @ 11kV from KSEB for the installation. All statutory charges shall be remitted by the clients. | EI-165 | 1 | lS |
AI Tender Summary
Tender Timeline
Jul 17, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedAug 05, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 07, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender