Regarding Erection Of Pole In Long Span , Guarding Of Line And Fixing Pvcc Sheet On Steel Pole And Streghthening Of 11 Kv And Lt Line At Kanwar Marg In The Area Of Edsd-I Mawana Of Edd-I Mawana Regarding Erection Of Pole In Long Span , Guarding Of Line
Tender Overview
Project Description
Regarding Erection Of Pole In Long Span , Guarding Of Line And Fixing Pvcc Sheet On Steel Pole And Streghthening Of 11 Kv And Lt Line At Kanwar Marg In The Area Of Edsd-I Mawana Of Edd-I Mawana Regarding Erection Of Pole In Long Span , Guarding Of Line And Fixing Pvcc Sheet On Steel Pole And Streghthening Of 11 Kv And Lt Line At Kanwar Marg In The Area Of Edsd-I Mawana Of Edd-I Mawanaunder Edc-2 Meerut
BOQ
| Name of Work: REGARDINGERECTION OF POLE IN LONG SPAN, GUARDING OF LINE AND FIXING PVCC SHEET ON STEEL POLE AND STREGHTHENING OF 11 KV & LT LINE AT KANWAR MARG IN THE AREA OF EDSD-I MAWANA OF EDD-I MAWANA under EDC-2, PVVNL, Meerut | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Qty | Units | |
| 1 | 1 | Line work :- | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.1 | Cartage of following from store center Meerut to dump site including loading & unloading at both ends maximum distance up to 40 Km :–\nA) PCC pole 8.5 mtr long. | BI01010001010000000000000515BI0100001113 | 8 | Nos |
| 3 | 1.2 | B) ST Pole 11 mtr. long | BI01010001010000000000000515BI0100001114 | 5 | Nos |
| 4 | 1.3 | Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. | BI01010001010000000000000515BI0100001115 | 2 | Job |
| 5 | 1.4 | Cartage of following from dump site to site of work on day to day basis including loading & unloading at both ends maximum distance up to 20 Km :– A) PCC pole 8.5 mtr long | BI01010001010000000000000515BI0100001116 | 8 | Nos |
| 6 | 1.5 | B) ST Pole 11 mtr. long | BI01010001010000000000000515BI0100001117 | 5 | Nos |
| 7 | 1.6 | Erection of PCC Pole 8.5 mtr long/ST pole 11 mtr. long after digging a pits of required size with fixing HT/LT line accessories complete. | BI01010001010000000000000515BI0100001118 | 13 | Nos |
| 8 | 1.7 | Fabrication & fixing of 11 KV Cross arms of MS Angle iron of size 65 x65 x6 mm. Straightening, cutting and drilling the holes | BI01010001010000000000000515BI0100001119 | 13 | Nos |
| 9 | 1.8 | Fixing of stay set with stay pin insulator | BI01010001010000000000000515BI0100001120 | 10 | Nos |
| 10 | 1.9 | Earthing with MS Earth Rod | BI01010001010000000000000515BI0100001121 | 5 | Nos |
| 11 | 2 | Guarding of line with G.I. wire, 6 SWG and 8 SWG having 2 no horizontal wire & 3 Mtr. distance of laces of ten 8 SWG G.I wire after fixing the guard cross arm. | BI01010001010000000000000515BI0100001122 | 15 | Span |
| 12 | 2.1 | Laying, lifting, sagging & binding of LT ABC cable of size (3x50+1x35+1x16 sq.mm.) | BI01010001010000000000000515BI0100001123 | 50 | Mtr. |
| 13 | 2.2 | Laying lifting, sagging & binding properly of ACSR weasel conductor 33 kv/11 kv & HT/LT Lines | BI01010001010000000000000515BI0100001124 | 450 | Mtr. |
| 14 | 2.3 | Replacement of damaged 11 kv disc insulator | BI01010001010000000000000515BI0100001125 | 5 | Nos |
| 15 | 2.4 | Replacement of damaged 11 kv pin insulator with pin | BI01010001010000000000000515BI0100001126 | 18 | Nos |
| 16 | 2.5 | Repairing of old & rusted Guarding of line with G.I. wire, 8 SWG and 10 SWG having 2 no horizontal wire & 3 Mtr. distance of laces of ten 8 SWG G.I wire after fixing the guard cross arm. | BI01010001010000000000000515BI0100001127 | 20 | Span |
| 17 | 2.6 | Providing & fixing bamboo strips in 3 phase 4 wire in LT line with proper binding. | BI01010001010000000000000515BI0100001128 | 30 | Nos |
| 18 | 2.7 | Cutting & chopping tree branches near side of line for making the clearance between line and tree. | BI01010001010000000000000515BI0100001129 | 70 | Nos |
| 19 | 2.8 | Re-sagging of lose sag of 11 KV line & LT line after opening the bindings then stringing the conductor & rebinding jumpring the same properly. | BI01010001010000000000000515BI0100001130 | 30 | Span |
| 20 | 2.9 | Providing and fixing of insulated sheet to cover the steel pole upto 07 feet hight from bottom of pole including proper binding with plactic tape. | BI01010001010000000000000515BI0100001131 | 280 | Nos |
| 21 | 3 | Baracating of medium power T/fs at Various places ar road side with the help of wooden Balli, card-board & bamboo etc. | BI01010001010000000000000515BI0100001132 | 8 | Nos |
| 22 | 3.1 | Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting. | BI01010001010000000000000515BI0100001133 | 5 | Nos |
| 23 | 3.2 | Repairing of damaged & missing part of fencing of Medium power T/f Plinth. | BI01010001010000000000000515BI0100001134 | 5 | Nos |
| 24 | 3.3 | Providing & fixing of Holding Clamp | BI01010001010000000000000515BI0100001135 | 5 | Nos |
| 25 | 3.4 | Providing & fixing of F Clamp | BI01010001010000000000000515BI0100001136 | 5 | Nos |
| 26 | 3.5 | Providing & fixing of Stay Clamp | BI01010001010000000000000515BI0100001137 | 10 | Nos |
| 27 | 3.6 | Providing & fixing of Nut & Bolt | BI01010001010000000000000515BI0100001138 | 20 | Kg |
| 28 | 3.7 | Back cartage of old & used material from site of work to JE store and then Store Centre, Meerut distance upto 30 km.\nA) ACSR Weasel Conductor | BI01010001010000000000000515BI0100001139 | 400 | Mtr. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender