| 1 | 1 | Excavation of all type of soil | BI01010001010000000000000515BI0100001113 | 4200 | Meter |
|---|
| 2 | 2 | Excavation of asphalt road | BI01010001010000000000000515BI0100001114 | 140 | Meter |
|---|
| 3 | 3 | Cutting of RCC/PCC & reinstatement | BI01010001010000000000000515BI0100001115 | 150 | Cubic foot |
|---|
| 4 | 4 | Supply of river stone less sand | BI01010001010000000000000515BI0100001116 | 4200 | Meter |
|---|
| 5 | 5 | Supply & laying of bricks | BI01010001010000000000000515BI0100001117 | 4200 | Meter |
|---|
| 6 | 6 | 200 /100/50 Pair U.G cable laying | BI01010001010000000000000515BI0100001118 | 6300 | Meter |
|---|
| 7 | 7 | 20/10/5 Pair U.G cable laying | BI01010001010000000000000515BI0100001119 | 4000 | Meter |
|---|
| 8 | 8 | Transportation of cable drum | BI01010001010000000000000515BI0100001120 | 10 | Each |
|---|
| 9 | 9 | Concealed conduiting 3/4'' or 1'' diaPVC | BI01010001010000000000000515BI0100001121 | 37.5 | Meter |
|---|
| 10 | 10 | 50/20/10 Pair PVC cable laying. | BI01010001010000000000000515BI0100001122 | 2300 | Meter |
|---|
| 11 | 11 | 5/2/1 Pair PVC cable Laying | BI01010001010000000000000515BI0100001123 | 14000 | Meter |
|---|
| 12 | 12 | Eathernet cable laying | BI01010001010000000000000515BI0100001124 | 700 | Meter |
|---|
| 13 | 13 | Dismantling of all type cables | BI01010001010000000000000515BI0100001125 | 5000 | Meter |
|---|
| 14 | 14 | Dismantling of 50 pr or more D.P box | BI01010001010000000000000515BI0100001126 | 40 | No |
|---|
| 15 | 15 | Dismantling of 20 pr. or less D.P.box | BI01010001010000000000000515BI0100001127 | 160 | No |
|---|
| 16 | 16 | 5''x5''white bakelite (hylam) | BI01010001010000000000000515BI0100001128 | 200 | No |
|---|
| 17 | 17 | 7''x5'' white bakelite (hylam) | BI01010001010000000000000515BI0100001129 | 100 | No |
|---|
| 18 | 18 | Laying G.I pipes 1/2'' dia size | BI01010001010000000000000515BI0100001130 | 20 | Meter |
|---|
| 19 | 19 | Laying of G.I pipes 1\" size | BI01010001010000000000000515BI0100001131 | 50 | Meter |
|---|
| 20 | 20 | Laying of G.I pipes 2\" dia size | BI01010001010000000000000515BI0100001132 | 100 | Meter |
|---|
| 21 | 21 | Laying of G.I pipes 4\" dia size | BI01010001010000000000000515BI0100001133 | 10 | Meter |
|---|
| 22 | 22 | Erection of telephone cabinet | BI01010001010000000000000515BI0100001134 | 6 | No |
|---|
| 23 | 23 | Undreground OFC cable laying | BI01010001010000000000000515BI0100001135 | 1500 | Meter |
|---|
| 24 | 24 | Laying 50 Pr.& more armored/PVC on tray | BI01010001010000000000000515BI0100001136 | 5600 | Meter |
|---|
| 25 | 25 | Laying 20 pr.& less armored/pvc on tray | BI01010001010000000000000515BI0100001137 | 7000 | Meter |
|---|
| 26 | 26 | Laying 50 pair & more PVC cable on wall | BI01010001010000000000000515BI0100001138 | 1500 | Meter |
|---|
| 27 | 27 | Laying 20 pair & less PVC cable on wall | BI01010001010000000000000515BI0100001139 | 3000 | Meter |
|---|
| 28 | 28 | Laying 1'' PVC pipe | BI01010001010000000000000515BI0100001140 | 5300 | Meter |
|---|
| 29 | 29 | Laying 1/2'' casing capping pipe | BI01010001010000000000000515BI0100001141 | 5000 | Meter |
|---|
| 30 | 30 | Laying 1'' casing capping pipe | BI01010001010000000000000515BI0100001142 | 1400 | Meter |
|---|
| 31 | 31 | Laying of 2'' casing capping pipe | BI01010001010000000000000515BI0100001143 | 125 | Meter |
|---|
| 32 | 32 | Supply & fixing of plug socket(ISI mark) | BI01010001010000000000000515BI0100001144 | 750 | No |
|---|
| 33 | 33 | Checking of 1/2/5 pair telephone cable | BI01010001010000000000000515BI0100001145 | 350 | No |
|---|
| 34 | 34 | Checking of 10/20/50 pr. telephone cable | BI01010001010000000000000515BI0100001146 | 200 | No |
|---|
| 35 | 35 | Checking of 100/200 pr. telephone cable: | BI01010001010000000000000515BI0100001147 | 50 | No |
|---|
| 36 | 36 | Supply & fixing of 4''x4'' PVC box | BI01010001010000000000000515BI0100001148 | 100 | No |
|---|
| 37 | 37 | Supply & fixing of 4''x6'' PVC box | BI01010001010000000000000515BI0100001149 | 80 | No |
|---|
| 38 | 38 | Installation of 100 Pair or above DP box | BI01010001010000000000000515BI0100001150 | 35 | No |
|---|
| 39 | 39 | Installation of 50 pair DP box | BI01010001010000000000000515BI0100001151 | 50 | No |
|---|
| 40 | 40 | Installation of 20 pair DP box | BI01010001010000000000000515BI0100001152 | 150 | No |
|---|
| 41 | 41 | Installation of 10/5 pair DP box | BI01010001010000000000000515BI0100001153 | 200 | No |
|---|
| 42 | 42 | Dressing of 100 pair or above cable | BI01010001010000000000000515BI0100001154 | 32 | No |
|---|
| 43 | 43 | Dressing of 50 pair cable | BI01010001010000000000000515BI0100001155 | 32 | No |
|---|
| 44 | 44 | Dressing of 20 pair cable | BI01010001010000000000000515BI0100001156 | 100 | No |
|---|
| 45 | 45 | Dressing of 10/5 pair cable | BI01010001010000000000000515BI0100001157 | 150 | No |
|---|
| 46 | 46 | Fixing of 200/100/50 pair canopy | BI01010001010000000000000515BI0100001158 | 15 | No |
|---|
| 47 | 47 | Fixing of 20/10/5 pair canopy | BI01010001010000000000000515BI0100001159 | 35 | No |
|---|
| 48 | 48 | Jointing of armoured cabl 50 Pr. & more. | BI01010001010000000000000515BI0100001160 | 70 | No |
|---|
| 49 | 49 | Jointing of armoured cables 20 pr & less | BI01010001010000000000000515BI0100001161 | 150 | No |
|---|
| 50 | 50 | Termination of telephone cables | BI01010001010000000000000515BI0100001162 | 3500 | Pair |
|---|
| 51 | 51 | Replacement of telephone cabinet | BI01010001010000000000000515BI0100001163 | 4 | No |
|---|
| 52 | 52 | Painting of telephone cabinet & DP Boxes | BI01010001010000000000000515BI0100001164 | 1500 | Squar foot |
|---|
| 53 | 53 | Cleaning of telephone instruments | BI01010001010000000000000515BI0100001165 | 13000 | No |
|---|
| 54 | 54 | Installation of telephone cable marker | BI01010001010000000000000515BI0100001166 | 25 | No |
|---|
| 55 | 55 | Laying of OFC on wall | BI01010001010000000000000515BI0100001167 | 400 | Meter |
|---|
| 56 | 56 | Fixing of panel box | BI01010001010000000000000515BI0100001168 | 10 | No |
|---|
| 57 | 57 | Supply of U.S. labour | BI01010001010000000000000515BI0100001169 | 320 | Man Days |
|---|
| 58 | 58 | Supply of Skiled labour | BI01010001010000000000000515BI0100001170 | 120 | Man Days |
|---|
| 59 | Total in Figures | | | | |
|---|