| 1 | 1 | INTERLOCKING | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.001 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | BI01010001010000000000000515BI0100001114 | 25.04 | cum |
|---|
| 3 | 1.002 | 16.68 : Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001115 | 60 | sqm |
|---|
| 4 | 1.003 | 16.91.2 : Providing and laying factory made chamfered edge Cement Concrete paver blocks\nin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,\nthickness & size/ shape, made by table vibratory method using PU mould, laid in\nrequired colour & pattern over 50mm thick compacted bed of sand, compacting and\nproper embedding/laying of inter locking paver blocks into the sand bedding layer\nthrough vibratory compaction by using plate vibrator, filling the joints with sand and\ncutting of paver blocks as per required size and pattern, finishing and sweeping\nextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | BI01010001010000000000000515BI0100001116 | 190.4 | sqm |
|---|
| 5 | 1.004 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | BI01010001010000000000000515BI0100001117 | 1.6 | cum |
|---|
| 6 | 1.005 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | BI01010001010000000000000515BI0100001118 | 0.8 | cum |
|---|
| 7 | 1.006 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001119 | 1.6 | cum |
|---|
| 8 | 1.007 | 4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001120 | 0.672 | cum |
|---|
| 9 | 2 | RETAARING AND TARRING | BI01010001010000000000000515BI0100001121 | | |
|---|
| 10 | 2.001 | 75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001122 | 1345.7 | sqm |
|---|
| 11 | 2.002 | 4.9 : Wet Mix Macadam\t<br>\t\t\nProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.\t\t<br>\t\nBy Mechanical Means with 1 km lead | BI01010001010000000000000515BI0100001123 | 31.98 | cum |
|---|
| 12 | 2.003 | 75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | BI01010001010000000000000515BI0100001124 | 213.2 | sqm |
|---|
| 13 | 2.004 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001125 | 213.2 | sqm |
|---|
| 14 | 2.005 | 75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates\n<br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | BI01010001010000000000000515BI0100001126 | 97 | sqm |
|---|
| 15 | 2.006 | 75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br>\t\t\t\t\t\t\t\t\nProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.\t\t<br>\t\t\t\t\t\t\nCase - I By Manual Means\t<br>\t\t\t\t\t\t\t\n(II)\tBitumen (S-65) | BI01010001010000000000000515BI0100001127 | 1558.9 | sqm |
|---|
| 16 | 2.007 | 75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510\t<br>\nA.\tBy Manual Means\t<br>\nCase III : Type C\t<br>\t\t\t\n(II)\tBitumen (S-65) | BI01010001010000000000000515BI0100001128 | 1558.9 | sqm |
|---|