| 1 | 1 | Excavation in trenches not exc 1.5 M wide and not exc 1.5 M in depth for pipe line, etc in soft/ loose soil getting out and levelling of bottom surface to required level complete all as specified and as directed. | | 260 | CUM |
|---|
| 2 | 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc 25 Cm thick soft / loose soil complete all as specified and as directed. | | 221 | CUM |
|---|
| 3 | 3 | Removing excavated material (Soils) from site to a distance not exc 50 M away and depositing where directed at a level not exc 1.5mtr above the starting point complete all as specified and as directed. | | 39 | CUM |
|---|
| 4 | 4 | Supplying, laying, jointing, testing and commmisioning of UPVC pipes of outer dia 110mm,SCH-40 having 220 PSI tolerance & minimum thickness should be 6mm including all fittting such as socket,bend,tee,reducer complete all as specified and as directed. | | 1068 | RM |
|---|
| 5 | 5 | Supply & fixing, jointing & testing ball valve of 100mm dia bore, ISI Marked,drilled pressure rating PN-1.0, PD Short body, confirming to IS 14846 -2000 complete all as specified and as directed. | | 1 | EACH |
|---|
| 6 | 6 | Supply & Fixing Disc filter (120 mesh) 50m3 /hr having an inlet & two outlets connections of 3\", 2 pressure gauze ports of 3/4\" ,a helix made of fiber glass reinforce polyamide at base of disc filter cartridge to create a helical effect in the incoming water ,spinning particulate in suspension away from the filtering element and so minimizing cleanings frequency ,3/4\" outlet for flushing at bottom of filter & maximum working pressure of 14 bars including taking out complete all as specified and as directed. | | 2 | EACH |
|---|
| 7 | 7 | Boring holes under road pavement by bocky manually in any type of soil upto 200 mm bore complete all as specified and as directed. | | 120 | RM |
|---|
| 8 | 8 | Contruction of valves pit chamber having internal dimention 90cmx90cmx90cm (internal height) with PCC (1:4:8) using 40mm graded stone aggregate for fdn (15mm thick) 23 cm brick wall in (1:4) 10mm thick rendering all around the brick work in cement mortar 1:6 PCC (1:2:4) type B1 coping with 20mm graded aggregate for grounting MS frame incl 13mm thick MS top sheet cover with locking arrangement incl 50mm pad lock with double key arrangement. MS frame mde out of 40x40x6mm thick angle iron incl painting of steel surface with two coats of red oxide primer as finishing coat incl necessary excavation in any type of soil, returning filling in and removal of surplus soil to a distance not exc 50mtrs complete all as specified and as directed. | | 1 | EACH |
|---|
| 9 | 9 | M&L for cutting existing DI pipe 150mm for connecting with 100mm UPVC pipe including all fitting complete all as specified and as directed. | | 1 | EACH JOB |
|---|
| 10 | 10 | Supply ,laying, fabricating, welding and jointing MS pipe of size 150 mm bore and 5 mm wall thickness confirming to IS 3589. passing through 200mm bore for protecting 100mm UPVC pipe trechless/laid in trenchess/floor complete all as specified and as directed. | | 60 | RM |
|---|
| 11 | 11 | Labour only to remove & fixing interlocking tiles/blocks during excavation complete all as specified and as directed. | | 150 | SQM |
|---|
| 12 | 12 | Supply & fixing Rotational moulded polyethylene water storage under ground tanks 5000 litre capacity, three layers (cylindrical vertical with closed top) hoisted and fixed in position complete all as specified and as directed. | | 2 | EACH |
|---|
| 13 | 13 | Supply & fixing three phase submersible monoblock pump set of 2 hp capacity 3000 RPM sucion X Delivery (65X50), 22 mtr head,30-35 LPS complete all as specified and as directed. | | 1 | EACH |
|---|
| 14 | 14 | Supply & fixing DOL STARTER 3 phase for 2 Hp motor complete all as specified and as directed. | | 1 | EACH |
|---|
| 15 | 15 | Supply & fixing submersible flat cable 3 core 2.5 sqmm complete all as specified and as directed. | | 36 | RM |
|---|
| 16 | 16 | Material and labour for PCC (1:4:8) type D-2 (using 40 mm graded stone aggregate) as in foundation, flooring sub base complete all as specified and as directed. | | 1 | CUM |
|---|