}

Construction Off Balance Work Of 40.00 Meters Apn Pre Stressed Concrete Bridge Across Ali Khad On Navgoan Beri Road Km 6/330 Including Bath Side Approaches Under , Sh - Providing And Laying Mastic Asphalt And Bituminous Concrete On Deck Slab Of Bridge Al-Himachal Pradesh

Public Works Department-PWD has published Construction Off Balance Work Of 40.00 Meters Apn Pre Stressed Concrete Bridge Across Ali Khad On Navgoan Beri Road Km 6/330 Including Bath Side Approaches Under , Sh - Providing And Laying Mastic Asphalt And Bituminous Concrete On Deck Slab Of Bridge Al. Submission Date for this Tender is 31-07-2021. Road Work Tenders in Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28463538
Construction Off Balance Work Of 40.00 Meters Apn Pre Stressed Concrete Bridge Across Ali Khad On Navgoan Beri Road Km 6/330 Including Bath Side Approaches Under , Sh - Providing And Laying Mastic Asphalt And Bituminous Concrete On Deck Slab Of Bridge Al
Open Tender
Indian
Himachal Pradesh
31-07-2021

Tender Details

Construction Off Balance Work Of 40.00 Meters Apn Pre Stressed Concrete Bridge Across Ali Khad On Navgoan Beri Road Km 6/330 Including Bath Side Approaches Under , Sh - Providing And Laying Mastic Asphalt And Bituminous Concrete On Deck Slab Of Bridge Along With Ushape Drain Pcc Parapets And Construction Of 2.00 Meter Span Rcc Slab Culvert At Rd 5/450

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 57.09 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail