| 1 | 1 | Item Description/ Heading | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | CEMENT PLASTER (IN FINE SAND)\n12 mm cement plaster of mix :\n1:4 (1 cement: 4 fine sand) | BI01010001010000000000000515BI0100001113 | 112.8 | Sqm |
|---|
| 3 | 1.02 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer all complete | BI01010001010000000000000515BI0100001114 | 144 | Kg |
|---|
| 4 | 1.03 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). | BI01010001010000000000000515BI0100001115 | 463 | Sqm |
|---|
| 5 | 1.04 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | BI01010001010000000000000515BI0100001116 | 463 | Sqm |
|---|
| 6 | 1.05 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :\nTwo or more coats on new work | BI01010001010000000000000515BI0100001117 | 50 | Sqm |
|---|
| 7 | 1.06 | Cleaning and removing of vegetation's from surface of Overhaed Tank and disposal of same with all lead and lifts i/c making good the surafec of Overhaed Tank as required etc. complete as per instruction of Engr-In-Charge. | BI01010001010000000000000515BI0100001118 | 30 | Day |
|---|
| 8 | 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :\n1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | BI01010001010000000000000515BI0100001119 | 16.7 | Cum |
|---|
| 9 | 1.08 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it\nthereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible,for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge.\nNote:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | BI01010001010000000000000515BI0100001120 | 432 | Sqm |
|---|
| 10 | 1.09 | TOTAL IMPACT OF GST FOR THE PURPOSE OF CTC | BI01010001010000000000000515BI0100001121 | 1 | Nos |
|---|