| 1 | 1 | Malma Cleaning removal of debries from galleries sump and stacking within 50 Mtr lead | BI01010001010000000000000515BI0100001114 | 2 | CuM |
|---|
| 2 | 2 | Drilling, Blasting & Mucking manually in haulage foundation. | BI01010001010000000000000515BI0100001114 | 8.56 | CuM |
|---|
| 3 | 3 | Groove cutting for haulage foundation and manually by chisel/pickaxe and hammer (A) hard stone cutting | BI01010001010000000000000515BI0100001114 | 1.63 | CuM |
|---|
| 4 | 4 | Brick work masonary in UG in cement motor ratio of 1:6 (A) Height of 1.5 Mtr from floor | BI01010001010000000000000515BI0100001114 | 3.67 | CuM |
|---|
| 5 | 5 | PCC work in U/G including centering,shuttering etc. Complete ratio 1:2:4 | BI01010001010000000000000515BI0100001114 | 5.13 | CuM |
|---|
| 6 | 6 | Tub trackline installation (line,sleeper,dugnail etc) of 40Mtr. Loading, unloading up to 500 Mtr transporting. | BI01010001010000000000000515BI0100001114 | 40 | Mtr |
|---|
| 7 | 7 | Line packing with metals as per direction of site incharge. | BI01010001010000000000000515BI0100001114 | 40 | Mtr |
|---|
| 8 | 8 | 01 No. haulage (haulage motor, haulage frame, gear box,pulley,roap,switch cabel and tailend etc.)loading, unloading up to 500 Mtr transporting. | BI01010001010000000000000515BI0100001114 | 8 | Day |
|---|
| 9 | 9 | Loading of all kind of building material in to tubs at incline mouth . | BI01010001010000000000000515BI0100001114 | 12.52 | CuM |
|---|
| 10 | 10 | Unloading of all kind of building materials at destination in UG. | BI01010001010000000000000515BI0100001114 | 12.52 | CuM |
|---|
| 11 | 11 | Transportation of material with tramming and pushing, coupling and uncoupling with haulage for a distance every 500 Mtr or part thereof and bringing the empty tub to surface. 02 parts= 2X189.13=378.26 | BI01010001010000000000000515BI0100001114 | 12.52 | CuM |
|---|
| 12 | 12 | Material cost(Brick,Sand,Cement will be provided by contractor and Metal chips provided by company) | | | |
|---|
| 13 | 12.1 | Cement | BI01010001010000000000000515BI0100001114 | 37.42 | Bags |
|---|
| 14 | 12.2 | Fly ash bricks | BI01010001010000000000000515BI0100001114 | 1835 | Nos |
|---|
| 15 | 12.3 | River Sand | BI01010001010000000000000515BI0100001114 | 3.18 | CuM |
|---|
| 16 | 13 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001130 | 1 | Nos |
|---|