Instrumentation Works At Various Locations On Mv Swaraj Dweep, HSL Visakhapatnam-Andhra Pradesh

Hindustan Shipyard Limited has published Instrumentation Works At Various Locations On Mv Swaraj Dweep. Submission Date for this Tender is 14-07-2021. Cans and Pails Tenders in HSL Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28457759
Corrigendum : Instrumentation Works At Various Locations On Mv Swaraj Dweep
Open Tender
Indian
Andhra Pradesh
HSL Visakhapatnam
14-07-2021

Tender Details

Instrumentation Works At Various Locations On Mv Swaraj Dweep , Rdff - Fire Fighting System: Make: Shanghai Rongde:Water Based Fire Fighting System Main Control Panel To Be Serviced And Repaired . Main , Remote Control Panel And All The Local Control Panels To Be Made Operational By Repairing Necessary Pcbs And Indications . All The Solenoid Coils/Valves Are To Be Overhauled And Serviced By Checking The Continuity And Insulation Of All The Loop Cables Along With Solenoids And If Any Found Defective To Be Repaired . After Completion Of The Repairs , Satisfactory Operational Trials To Be Shown To Hsl/Ss And Attending Surveyor . , Rdff Water Based Fire Fighting System To Be Checked For Proper Working Following Jobs To Be Done And Satisfactory And Reliable Operation Of The System From Remote And Local Panels To Be Shown To Hsl , Ss & Surveyors . A ) All 11 Local Control Panels Located Near Aes , Mes , Boilers , Incinerator To Be Made Operation Including 11 Smoke Sensors , 11 Flame Sensors And Rotating Lights . All Sensors ( Smoke And Flame ) And Rotating Lights Are To Be Checked For Proper Working And If Any Found Defective To Be Renewed . B ) Local Pump Control Panel To Check For Proper Working . C ) 10 Nos Solenoid Valves To Be Checked And Overhauled . D ) 40 Center Fw Tank Low Level Alarm Float To Be Checked For Proper Working . E ) Rdff Alarm Display Panel In W/H To Be Chekcked For Proper Working . , Fire Detection System- Unitor / Mbsa - 809 :Fire Detection System Consisting Of Zone Control Panels And Main Control Panel And Is Malfunctioning And The Same To Be Overhauled By Checking Of Smoke/Fire/Heat Detectors Along With Manual Call Points . All The Bells Are To Be Tested For Proper Operation After Serviciability . Pcbs , Relays , Indication Lamps Etc . Are To Be Repaired In Main Control Panel And All The Zone Control Panels . Loop Cables Has To Be Repaired For Any Short Circuits By Checking Cable Continuity And Insulation Values . System To Be Proved After Completion Of The Repairs , Satisfactory Operational Trials To Be Shown To Hsl/Ss And Attending Surveyor . , 74 Nos Manual Call Points In The Various Circuits To Check Defective Ones To Renew . Consider Renewal Of 20 Manual Call Points Along With Foundation Bases . New Manual Call Points - Ship Supply , 7 Nos Zone Collector Pcbs To Check . Defective Circuit Boards To Repair . Consider Repairing Of 03 Zone Collector Pcbs . , 84 Nos Fire Door Monitor Sensors ( Magnetic Reed Switche Type ) To Check For Satifactory Operation Along With Control Stations . Faulty Sensors To Renew . All Fire Door To Be Checked For Proper Functioning Of Open/Close Indication On The Main Panel In The Bridge . Sensors Are To Be Supplied By The Contractor Only Along Wih Renewal Of 20 Sensors With Cover . , Fire Alarm Bells 89 Nos To Check For Proper Functioning And Also , General Servicing Of All Bells To Be Done . Consider Renewal Of 10 Bells Along With Foundation Bases . New Fire Bells - Ship Supply . , Defective Fire Door Magnetic Catchers To Renew . Consider Renewal Of 10 Magnetic Catchers ( Magnetic Catchers - Ships Supply ) , 640 Nos Fire Detectors In Various Locations Onboard To Check For Proper Functioning . While Checking Functiong Of All Fire Detectors Onboard , Defective Detectors If Any To Renewed Along With Foundation Base . Consider Renewal Of 20 Detectors With Base . ( Material - Ship Supply ) , Two Nos Remote Indication Panels ( One In Ecr Another In Fire Control Room ) To Be Checked For Proper Working Of Pcbs , Indication Lamps , Relays Etc . All The Defective Components To Be Replaced/Rectified By The Contractor . After Completion Of Repairs , Satisfactory Operation Of Fire Detection & Alarm System Including Fire Door Indications , Fire Door Magnetic Catchers And Fire Bells Are To Be Shown To Class & Mmd Surveyors . , Sprinkler System - Type-Sprinkler Mx-Sp , Make; Minimax , Werknorm , The Following Jobs Are To Carry Out On Accommodation Sprinkler System And The Corresponding Alarms On The Sprinkler System Has To Be Checked , Tried Out Along With Indications On The Panel . Necessary Repairs To Be Carried On The System Out By Replacing The Defective Components . After Completion Of The Repairs , Satisfactory Operational Trials To Be Shown To Hsl , Ss And Attending Surveyor . , Pressure Gauges Range-16Bar And Two Pointer Type . Scale Division 0 . 5Bar , Black Pointer Plus 2 Marking Pointer , Red , Individually Adjustable . These 12 Numbers Pressure Gauges To Remove From Place Along With Their Shut Off Cocks . All Pressure Gauge Glasses Have Become Obscure And Not Visible . These Glasses To Remove And Clean/Renewed . All Defective Pressure Gauges To Renew As Per Sample . Consider Renewal Of 06 Number Pressure Gauges ( All The Materials Required For Completion Of The Job Are To Be Supplied By The Contractor Including Glasses And Glycerine Filled Presure Guages ) , Sprinkler Air Compressor Auto Cut-In/Cut-Off And Sprinkler Sea Water Pump Auto Cut-In/Cut-Off To Be Checked For Proper Operation Along With Control Panel . All The Indications & Meters On The Control Panel Has To Made Operational And If Any Found Defective To Be Renewed . , All 20 Numbers Flow Switches To Check For Their Proper Function And Defects Any To Be Rectified . 05 Nos Of Flow Switches Has To Be Renewed . ( Material - Ship Supply ) . Satisfactory Trials To Be Shown To Surveyors , Ss , Hsl . , W/H Sprinkler Panel Indications To Be Checked For Proper Functioning And The Defective Indicators Are To Be Renewed ( Material Is To Be Supplied By The Contractor ) . After Completion Of Repairs , Satisfactory Operation To Be Shown To Surveyors , Ss & Hsl . , Following E/R Gauges , Ecr Console Gaugaes & Calibrators Are To Be Calibrated . Calibration Certificates To Be Issued And The Same To Be Valid For A Period Of One Year From Calibrated Date . Calibrate The Gauges , Temperature And Pressure Indicators With Their Respective Sensors In The Circuit/Cable Loop And Renewal Of Defective Sensors . , Pressure Calibrator . Make - Omicron Type Ote- P202 , Temperature Calibrator . Make - Omicron , Starting Air Pressure 0 To 40 Bar ( Local ) , Main Air Bottle Pressure Gauge 0 To 60 Bar , Aux Air Bottle Pressure Gauge 0 To 25 Bar , Aux Boiler Pressure Gauge 0 To 16 Bar , Exhaust Boiler Pressure Gauge 0 To 16 Bar , Sprinkler Pressure On The Wheel House 0- 10 Bar , Sprinkler Pressure On The Sprinkler Hydrophore 0- 20 Bar , Air Compressor 2Nd Stage 0- 60 Bar , Exhaust Pyrometers 50 To 650 Deg C , Dial Type Thermometer 0-120 Deg C , M/E Local Panel Gauges , A/E Local Panel Gauges , Emergency Generator Engine Local Panel Gauges , Pme Ecr Panel Gauges , Sme Ecr Panel Gauges , Ae L . O . Pressure Gauges 0 - 6 Bar , Main Air Bottle Pressure 0-40Bar , Lt System Pressure 0 - 6 Bar , Cooling Sea Water Inlet Pressure 0 - 6 Bar , Stern Tube Bearing Temperature 0 - 100 Deg C , F . O & D . O Sounding Gauges , Pa System ( Make/Model :- Philips , Lbd8353/8363/8347 , Pa System Including All 07 Nos Amplifiers And Speakers 175 Nos ( Inside Accommodation 115 Nos & Outside 60 Nos ) And 04 Nos Announcement Stations ( W/H , Purser Office , Library & 7Th Deck Opposite Ceo Cabin ) Onboard To Be Checked For Satisfactory Operation . , 20 Nos Of Defective Speakers ( Ship Supply ) To Be Renewed , Remaining Speakers Are To Be Repaired And Proved For Satisfactory Operation Of Pa System And Same To Be Shown To Hsl & Shipstaff . , After Completion Of The Repairs , Satisfactory Operational Trials To Be Shown To Hsl , Ss And Attending Surveyor .

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 09-Jul-2021 Revised Techno Commercial Bid Technical Bid 14-07-2021

Key Value

Document Fees
INR 590 /-
EMD
INR 40000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Instrumentation works at various location on MV Swaraj Dweep
Sl. No. Item Description DI. No. Qty UoM
1 1 RDFF - FIRE FIGHTING SYSTEM: MAKE: SHANGHAI RONGDE:\nWater based fire fighting system main control panel to be serviced and repaired. Main, remote control panel and all the local control panels to be made operational by repairing necessary PCBs and indications. All the solenoid coils/valves are to be overhauled and serviced by checking the continuity and insulation of all the loop cables along with solenoids and if any found defective to be repaired. After completion of the repairs, satisfactory operational trials to be shown to HSL/SS and attending surveyor.
2 2 RDFF water based fire fighting system to be checked for proper working following jobs to be done and satisfactory and reliable operation of the system from remote and local panels to be shown to HSL, SS & Surveyors. \na) All 11 local control panels located near AEs, MEs, Boilers, incinerator to be made operation including 11 smoke sensors, 11 flame sensors and rotating lights. All sensors (smoke and flame) and rotating lights are to be checked for proper working and if any found defective to be renewed. \nB) local pump control panel to check for proper working. \nC) 10 nos solenoid valves to be checked and overhauled. \nD) 40 center fw tank low level alarm float to be checked for proper working.\nE) RDFF alarm display panel in w/h to be chekcked for proper working. 1 LS
3 3 FIRE DETECTION SYSTEM- UNITOR / MBSA - 809 :\nFire detection system consisting of zone control panels and main control panel and is malfunctioning and the same to be overhauled by checking of smoke/fire/heat detectors along with manual call points. All the bells are to be tested for proper operation after serviciability. PCBs, relays, indication lamps etc. are to be repaired in main control panel and all the zone control panels. Loop cables has to be repaired for any Short circuits by checking Cable continuity and insulation values. System to be proved after completion of the repairs, Satisfactory operational trials to be shown to HSL/SS and attending surveyor.
4 4 74 Nos Manual call points in the various circuits to check defective ones to renew. Consider renewal of 20 Manual call points along with foundation bases. New Manual call points - Ship supply 1 LS
5 5 7 Nos zone collector PCBs to check. Defective circuit boards to repair. Consider repairing of 03 zone collector PCBs. 1 LS
6 6 84 Nos fire door monitor sensors (magnetic reed switche type) to check for satifactory operation along with control stations. Faulty sensors to renew. All fire door to be checked for proper functioning of open/close indication on the main panel in the bridge. Sensors are to be supplied by the Contractor only along wih renewal of 20 sensors with cover. 1 LS
7 7 Fire alarm bells 89 nos to check for proper functioning and also, general servicing of all bells to be done. Consider renewal of 10 bells along with foundation bases. New fire bells - Ship supply. 1 LS
8 8 Defective fire door magnetic catchers to renew. Consider renewal of 10 magnetic catchers (Magnetic catchers - Ships' supply) 10 LS
9 9 640 Nos fire detectors in various locations onboard to check for proper functioning. While checking functiong of all fire detectors onboard, defective detectors if any to renewed along with foundation base. Consider renewal of 20 detectors with base. (Material - Ship supply) 1 LS
10 10 Two nos remote indication panels (one in ECR another in Fire control room) to be checked for proper working of PCBs, Indication lamps, relays etc. All the defective components to be replaced/rectified by the Contractor. After completion of repairs, Satisfactory operation of Fire detection & alarm system including fire door indications, fire door magnetic catchers and fire bells are to be shown to class & MMD surveyors. 1 LS
11 11 SPRINKLER SYSTEM - Type-Sprinkler MX-SP, Make; Minimax , Werknorm
12 12 The following jobs are to carry out on accommodation sprinkler system and the corresponding alarms on the sprinkler system has to be checked, tried out along with indications on the panel. Necessary repairs to be carried on the system out by replacing the defective components. After completion of the repairs, Satisfactory operational trials to be shown to HSL, SS and attending surveyor.
13 13 Pressure gauges range-16bar and two pointer type. Scale division 0.5bar, black pointer plus 2 marking pointer, red, individually adjustable. These 12 numbers pressure gauges to remove from place along with their shut off cocks. All pressure gauge glasses have become obscure and not visible. These glasses to remove and clean/renewed. All defective pressure gauges to renew as per sample. Consider renewal of 06 Number pressure gauges (All the Materials required for completion of the job are to be supplied by the Contractor including glasses and glycerine filled presure guages) 1 LS
14 14 Sprinkler air compressor auto cut-in/cut-off and sprinkler sea water pump auto cut-in/cut-off to be checked for proper operation along with control panel. All the Indications & Meters on the control panel has to made operational and if any found defective to be renewed. 1 LS
15 15 All 20 numbers Flow switches to check for their proper function and defects any to be rectified. 05 Nos of Flow switches has to be renewed. (Material - ship supply). Satisfactory trials to be shown to surveyors, SS, HSL. 1 LS
16 16 W/H sprinkler panel indications to be checked for proper functioning and the defective indicators are to be renewed (Material is to be supplied by the Contractor). After completion of repairs, Satisfactory operation to be shown to surveyors, SS & HSL. 1 LS
17 17 Following E/R gauges, ECR Console gaugaes & Calibrators are to be calibrated. Calibration certificates to be issued and the same to be valid for a period of one year from calibrated date. Calibrate the gauges, temperature and pressure indicators with their respective sensors in the circuit/cable loop and renewal of defective Sensors.
18 18 Pressure calibrator. Make - Omicron Type OTE- P202 1 NO
19 19 Temperature calibrator. Make - Omicron 1 NO
20 20 Starting air pressure 0 to 40 Bar ( local) 2 NOS
21 21 Main air bottle pressure gauge 0 to 60 bar 3 NOS
22 22 Aux air bottle pressure gauge 0 to 25 bar 1 NO
23 23 Aux boiler pressure gauge 0 to 16 bar 2 NOS
24 24 Exhaust boiler pressure gauge 0 to 16 bar 2 NOS
25 25 Sprinkler pressure on the Wheel house 0- 10 bar 1 NO
26 26 Sprinkler pressure on the Sprinkler Hydrophore 0- 20 bar 1 NO
27 27 Air compressor 2nd stage 0- 60 bar 2 NOS
28 28 Exhaust pyrometers 50 to 650 deg C 48 NOS
29 29 Dial type thermometer 0-120 deg C 60 NOS
30 30 M/E local panel gauges 12 NOS
31 31 A/E local panel gauges 30 NOS
32 32 Emergency generator engine local panel gauges 3 NOS
33 33 PME ECR panel gauges 20 NOS
34 34 SME ECR panel gauges 20 NOS
35 35 AE L.O. Pressure gauges 0 - 6 bar 5 NOS
36 36 Main air bottle pressure 0-40bar 2 NOS
37 37 LT system pressure 0 - 6 bar 1 NO
38 38 Cooling Sea water inlet pressure 0 - 6 bar 1 NO
39 39 Stern tube bearing temperature 0 - 100 deg C 2 NOS
40 40 F.O & D.O sounding gauges 13 NOS
41 41 PA SYSTEM(MAKE/MODEL :- PHILIPS, LBD8353/8363/8347
42 42 PA SYSTEM Including all 07 nos amplifiers and speakers 175 nos (inside accommodation 115 nos & outside 60 nos) and 04 nos announcement stations (w/h, purser office, library & 7th deck opposite ceo cabin) onboard to be checked for satisfactory operation. 1 LS
43 43 20 nos of defective speakers (Ship supply) to be renewed, remaining speakers are to be repaired and proved for Satisfactory operation of PA system and same to be shown to HSL & shipstaff. 1 LS
44 44 After completion of the repairs, Satisfactory operational trials to be shown to HSL, SS and attending surveyor.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail