Comprehensive Annual Maintenance Contract For The Works Given As Item Description At Drugs Testing Laboratory , Thiruvananthapuram For A Period Of One Year From 01/09/2021 To 31/08/2022
Tender Overview
Project Description
Comprehensive Annual Maintenance Contract For The Works Given As Item Description At Drugs Testing Laboratory , Thiruvananthapuram For A Period Of One Year From 01 / 09 / 2021 To 31 / 08 / 2022 , Microbiology Lab - Camc , I ) Clean Room Validation As Per Grade A , B , C & D ( I ) Air Flow Velocity ( Ii ) Air Changers Per Hour ( Iii ) Filter Integrity Test ( Iv ) Differential Pressure ( V ) Recovery Time ( Vi ) Room Temperature & Humidity ( Vii ) Particle Count Ii ) Maintenance , Servicing & Overhauling Works Of Hvac System A ) Air Handling Units - 3 Nos ( 8 . 5 Ton X 2 Nos . & 5 . 5 Ton X 1 No . ) ( I ) Flushing And Cleaning Of Finned Surface & Dx Tubes Of Cooling Coils ( Ii ) Checking & Replacement Of Faulty Fan Bearing ( Iii ) Checking & Replacement Of Faulty Motor Bearing ( Iv ) Checking Of Belt Allignment And Tension & Mounting Bolts . ( V ) Cleaning Of Filters , Replacement Of Defective Belts , Pulleys , Blowers , Shafts , Bearings Of Ahus Whenever Found Defective . B ) Electrical Panels And Wiring ( I ) Checking And Servicing Of Contactors , Capacitors , Overloads , Mccbs And Fuses , Tightening Of Wiring Connections And Replacement Of Faulty Parts If Required . ( Ii ) Checking Of Wiring Insulations & Motor Winding ( Iii ) Checking Of Earthing . C ) Outdoor Units - 3 Nos ( 8 . 5 Ton X 2 Nos . & 5 . 5 Ton X 1 No . ) Flushing & Cleaning Of Finned Surface Of Condenser , General Change Of Compressor Oil If Required , Greasing Of Bearing And Oiling Wherever Required , Replacement Of Motors And Compressor If Required . Topping Of Refrigerant Whenever Required . Rectification Of Leak If Any And Testing The System With Nitrogen Pressure And Re-Commissioning After Vaccumization , Replacement Of Insulation Sleeves On Copper Tubings . Iii ) Other Works Validation Frequency : 2 Tests Per Year Breakdown Attendance: Within 24 Hrs .
BOQ
| Name of Work: Entering for Comprehensive Annual Maintenance Contract for the Works given as Item Description at DTL, Thiruvananthapuram for a period of one year from 01/09/2021 to 31/08/2022 | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Microbiology Lab - CAMC | BI01010001010000000000000515BI0100001112 | ||
| 2 | 1.01 | I) Clean Room Validation as per grade A, B, C & D\n(i) Air Flow Velocity (ii) Air Changers per Hour\n(iii) Filter Integrity Test (iv) Differential Pressure\n(v) Recovery Time (vi) Room Temperature & Humidity\n(vii) Particle Count\nII) Maintenance, Servicing & Overhauling works of HVAC System\nA) Air Handling Units - 3 Nos (8.5 Ton x 2 Nos. & 5.5 Ton x 1 No.)\n(i) Flushing and Cleaning of Finned Surface & DX Tubes of Cooling Coils\n(ii) Checking & Replacement of faulty Fan Bearing\n(iii) Checking & Replacement of faulty Motor Bearing\n(iv) Checking of Belt Allignment and Tension & Mounting Bolts.\n(v) Cleaning of Filters, Replacement of Defective Belts, Pulleys, Blowers, Shafts, Bearings of AHUs whenever found defective.\nB) Electrical Panels and Wiring\n(i) Checking and Servicing of Contactors, Capacitors, Overloads, MCCBs and Fuses, Tightening of wiring connections and Replacement of faulty parts if required.\n(ii) Checking of Wiring Insulations & Motor Winding\n(iii) Checking of Earthing.\nC) Outdoor Units - 3 Nos (8.5 Ton x 2 Nos. & 5.5 Ton x 1 No.)\nFlushing & Cleaning of finned surface of condenser, General Change of compressor oil if required, greasing of bearing and oiling wherever required, replacement of motors and compressor if required. Topping of refrigerant whenever required. Rectification of leak if any and testing the system with nitrogen pressure and re-commissioning after vaccumization, replacement of insulation sleeves on Copper tubings.\nIII) Other Works\nValidation Frequency : 2 tests per year\nBreakdown attendance: Within 24 hrs. | BI01010001010000000000000515BI0100001113 | 1 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender