| 1 | Flush pointing on Random Rubble Masonry with Cement Mortar 1:3 (One cement, three sand) including cost of all materials, labour, curing etc., complete complying with AISS and as directed by the departmental officers. |
| 2 | Painting the Floor surfaces with One Coat of Synthetic Enamel Paint of approved quality (excluding priming coat) on previously painted concrete / masonry / plastered surfaces with ready mixed paint brushing for use on floors to give an even shade including cleaning the surface of dirt, dust and other foreign matter and sand papering as required including cost of Synthetic Enamel Paint and labour charges etc., complete complying with AISS and as directed by the departmental officers. |
| 3 | Cleaning the Juliflora jungle, debris and bushes without uprooting juliflora trees, rank vegetation, Grass, wood saplings etc..,and removing not exceeding 50m outside the periphery of the area cleared and filling and levelling the pits etc., including all labour, tools, etc., complete and as directed by the departmental officers. |
| 4 | Supplying and placing \"X\" stone (10 to 70 kg) from any licensed quarry like Thattaparai, Srivaikundam, etc., conveying by road in dumpers/tippers including charges for production cost of stone, such as earth works, removal of over burden, breaking of stones, cost of explosives, seiginorage fee, royalty etc., labour for loading, unloading,weighing in the Department approved weigh bridge, dumping, spreading and sectioning to the required level, alignment and slope without causing any damage to form the rubble bund as per approved specification, conditions of contract and drawings and as directed by the departmental officers. |
| 5 | Dismantling and removal of Plain Cement Concrete (PCC) above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within a lead of 100 m including all labour, tools, equipments, transport, fuel, etc., complete complying with AISS and as directed by the departmental officers. |
| 6 | Providing and laying Plain Cement Concrete 1:2:4 (One part of cement, Two parts of Coarse sand & Four Parts of graded stone aggregate (i.e.) 3 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) for RCC works using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. |
| 7 | Providing R.C.C. Work smooth finishing of the exposed surfaces in all floors with Cement Mortar 1:3 (Plastering Sand (P-Sand)) (One Cement, Three Plastering Sand (P-Sand)) 6 mm thick includinglabour charges, cleaning etc., complete complying with AISS and as directed by the departmental officers. |
| 8 | White washing with lime powder on new wall surfaces TWO COATS to give an even shade including cleaning the surfaces, preparaton of wall, cost of lime powder, brushes, scaffolding, etc., complete complying with AISS and as directed by the departmental officers. |