| 1 | 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Box Cutting MORTH Rev. V Clause No. 111, 112, 202, 301 to 305 | Item Code / Make 2 | 918.91 | Cubic Metre |
|---|
| 2 | 2 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-V Material as per MORTH Rev. V Clause No. 111, 112, 401 & 900. | Item Code / Make 3 | 215.37 | Cubic Metre |
|---|
| 3 | 3 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 406 ) - for grading-III Material as per MORTH Rev. V Clause No. 111, 112, 406 & 900. | Item Code / Make 4 | 215.37 | Cubic Metre |
|---|
| 4 | 4 | Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900. | Item Code / Make 5 | 358.95 | Cubic Metre |
|---|
| 5 | 5 | Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 . | Item Code / Make 615 | 1435.8 | Squre Metre |
|---|
| 6 | 6 | Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900. | Item Code / Make 616 | 1435.8 | Squre Metre |
|---|
| 7 | 7 | Dense Graded Bituminous Macadam (Table - 500-10) (Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 502, 503, 505 & 900. | Item Code / Make 617 | 71.79 | Cubic Metre |
|---|
| 8 | 8 | Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900. | Item Code / Make 618 | 57.43 | Cubic Metre |
|---|
| 9 | 9 | Calculation of SubTotal, GST and Total Amount carried out by system automatically | | | |
|---|
| 10 | 10 | Basic cost of value put to tender as per estimate | | 1 | (A) |
|---|
| 11 | 11 | Add GST at 12% | | 1 | (B) |
|---|
| 12 | 12 | Total Value put to Tender | | 1 | (A+B) |
|---|
| 13 | 13 | Negotiated Percentage | | 1 | (D) |
|---|
| 14 | 14 | Final Negotiated Value | | 1 | (E) |
|---|
| 15 | 15 | Add GST at 12% of Final Negotiated Value | | 1 | (F) |
|---|
| 16 | 16 | Total Value of Contract Including 12% of GST | | 1 | (E+F) |
|---|