| 1 | 1 | Removing existing aluminium partition made up with gall, partial board and fixing the removed aluminium partition, glass and partial boards as per requirement and direction of Engineer in charge. | | 165 | Sqm |
|---|
| 2 | 2 | Providing and Fixing frosted adhesive-backed film with decorative pattern. | | 76 | Sqm |
|---|
| 3 | 3 | Providing and fixing 100mm brass locks (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete. | | 2 | Nos |
|---|
| 4 | 4 | Providing and fixing aluminium tubular handle bar 32 mm outer ja, 3.0 mm thick & 2100 mm long with SS screws etc .complete as per direction of Engineer-in-Charge.Powder coated minimum thickness 50 micron aluminium tubular handle bar | | 4 | Nos |
|---|
| 5 | 5 | Providing and fixing 150 mm bright finished floor brass door stopper with rubber cushion, necessary brass screws etc. to suit shutter thickness complete | | 2 | Nos |
|---|
| 6 | 6 | Providing and laying in position cement concrete of specified grade\nexcluding the cost of centering and shuttering - All work up to plinth 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size)\nlevel : | | 1 | Cum |
|---|
| 7 | 7 | Centering and shuttering including strutting, propping etc. and removal\nof form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | | 25 | Sqm |
|---|
| 8 | 8 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with\nclamps at 1.00 m spacing. This includes jointing of pipes & fittings\nwith one step CPVC solvent cement and testing of joints complete Concealed work, including cutting chases and making good the walls etc. as per direction of Engineer in Charge. a) 25 mm dia pipe | | 20 | RMT |
|---|
| 9 | 8.1 | b) 40 mm nominal outer ja Pipes | | 13 | MT |
|---|
| 10 | 9 | Providing and fixing gun metal gate valve with C.I. wheel of approved\nquality (screwed end) :a) 25 mm nominal outer ja Pipes | | 2 | Nos |
|---|
| 11 | 9.1 | b) 40 mm nominal outer ja Pipes | | 2 | Nos |
|---|
| 12 | 10 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931\n15mm nominal bore | | 2 | Nos |
|---|
| 13 | 11 | Providing and fixing long body brass bib cock of approved quality | | 2 | Nos |
|---|
| 14 | 12 | Providing and fixing on wall face Drainage water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single docketed pipes. 75 mm Dis HDPE pipe | | 10 | RMT |
|---|
| 15 | 13 | removing and refixing Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) 25 mm thick | | 150 | Sqm |
|---|
| 16 | 14 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass\npillar taps, 32 mm C.P. brass waste of standard pattern, including\npainting of fittings and brackets, cutting and making good the walls\nwherever require White Vitreous China Wash basin size 630x450 mm with\na pair of 15 mm C.P. brass pillar taps | | 2 | Nos |
|---|
| 17 | 15 | Steel work welded in built up sections/ framed work, including cutting,\nhoisting, fixing in position and applying a priming coat of approved steel\nprimer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates\nand similar works including synthetic enamel paint of approved shade (two coat) | | 8400 | Kg |
|---|
| 18 | 16 | Painting with synthetic enamel paint of approved brand and\nmanufacture to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and\nmanufacture | | 840 | Sqm |
|---|
| 19 | 17 | providing and fixing polycarbonate sheet 12 mm thick malty layer of approved make including removing the exasting damaged polycarbonate sheet. | | 50 | Sqm |
|---|
| 20 | 18 | Finishing walls with textured exterior paint of required shade Old work (Two or more coats on existing cement paint\nsurface applied @ 3.28 ltr/10 sqm | | 72 | Sqm |
|---|
| 21 | 19 | Providing and fixing fly proof stainless steel grade 304 wire gauge, to\nwindows and clerestory windows using wire gauge with average width\nof aperture 1.4 mm in both directions with wire of dia. 0.50 mm all\ncomplete With 12 mm mild steel U beading net above false ceiling | | 10 | Sqm |
|---|
| 22 | 20 | 12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand) | | 72 | Sqm |
|---|
| 23 | 21 | Providing, supplying and fixing internal metal fire rated doors (double/ single leaf) of approved equivalent make with Fire Resistant 120 minutes rating as per manufacturers specifications and similar to the prototype tested by CBRI, Roorkee & certificate issued thereof (as per IS:3614 Part-2, 1992) with overall size as per site requirement. Door frames are made with 1.6mm thick galvanised steel sheet pressed to double rebate profile of size 143x57mm. Door shutters are made with 1.2mm thick galvanised steel sheet pressed formed to provide fully flush double skin panel shall be not less than 46mm thick with lock seam joints at style edges. The internal construction of panel shall be filled with\ninsulating mineral wool with reinforcement at top, bottom and stile surrounds.The door shutters shall be provided with provision for vision panel of required size(as per Architectural drawings) with 6 mm thick clear toughened Boro Silicate glass of Pyran or Scot make to give120 minutes fire rating including vision panel glass shall The item also include provision for required iron mongery, shutter and frame shall be finished with zinc phosphate For double leaf door including concealed lock, H type handels (4 nos.), door cloaser and tower bolts etc. as per requirement and direction of Engineer in Charge | | 21 | Sqm |
|---|
| 24 | 22 | Repairing the wall\concert cracks by widening and cleaning the crack, filling cracks with filler material ready-to-use fiber based compound(approved make) with crack filling ability for both interior and exterior surfaces and as per instruction of engineer in charge. | | 30 | RMT |
|---|