Ministry Of Road Transport And Highways has published Consultancy Service For Re-Construction Of Following Narrow Bridges In The State Of Himachal Pradesh ( I ) Bathri Bridge ( 30M ) At Rd 71/00 On Nh -154A ( Ii ) Bhatti Nallah ( 170 M ) At Rd 106/530 On Nh-154A ( Iii ) Keru Bridge ( 60M ) At Rd 42. Submission Date for this Tender is 06-09-2021. Laser Printers Tenders in Rampur Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Jul-2021 | Corrigendum | Date | 23-08-2021 |
2 | 07-Aug-2021 | Corrigendum | Technical Bid | 23-08-2021 |
3 | 19-Aug-2021 | Reg extend of date | Date | 01-09-2021 |
4 | 28-Aug-2021 | Corrigendum 2 | Date | 06-09-2021 |
Name of work:- Consultancy Service for Re-construction of following narrow bridges in the state of Himachal Pradesh (i) Bathri Bridge (30m) at RD 71/00 on NH -154A (ii) Bhatti Nallah (170 m) at RD 106/530 on NH-154A (iii) Keru Bridge (60m) at RD 42/410 on NH-154A (iv) Bhera Khad Bridge (67 m) at KM 254/040 on NH-22 (v) Machhada Khad Bridge (65 m) at KM 259/295 on NH-22 (vi) Khekhar Nallah Bridge (25 m) at KM 243/540 on NH-22 (vii) Shoulding Khad Bridge (146 m) at KM 322/00 on NH-22 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Team Leader cum Senior Bridge Engineer | BI01010001010000000000000515BI0100001113 | 10 | Month |
3 | 1.02 | Bridge / Structural Engineer | BI01010001010000000000000515BI0100001114 | 6 | Month |
4 | 1.03 | Highway cum Pavement Engineer | BI01010001010000000000000515BI0100001115 | 10 | Month |
5 | 1.04 | Material-cum-Geotechnical Engineer- Geologist | BI01010001010000000000000515BI0100001116 | 10 | Month |
6 | 1.05 | Senior Survey Engineer | 6 | Month | |
7 | 1.06 | Senior Geologist | 6 | Month | |
8 | 1.07 | Environmental Specialist | 6 | Month | |
9 | 1.08 | Quantity Surveyor/ Documentation Expert | 4 | Month | |
10 | 2 | Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) | |||
11 | 2.01 | Position | 1 | Month | |
12 | 2.02 | Position | 1 | Month | |
13 | 2.03 | Position | 1 | Month | |
14 | 2.04 | Position | 1 | Month | |
15 | 2.05 | Position | 1 | Month | |
16 | 2.06 | Position | 1 | Month | |
17 | 2.07 | Position | 1 | Month | |
18 | 3 | Support Staff (inclusive of per diem allowance)\nNote: To be assessed by consultant as per requirement of assignment | |||
19 | 3.01 | Office Manager | 10 | Month | |
20 | 3.02 | Typist | 10 | Month | |
21 | 3.03 | Office Boy | 10 | Month | |
22 | 3.04 | Night Watchman | 10 | Month | |
23 | 4 | Transportation (Fixed Costs) | |||
24 | 4.01 | The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. | 1 | Complete Job | |
25 | 5 | Duty Travel to Site (Fixed Costs) | |||
26 | 5.01 | Trips | 1 | Complete Job | |
27 | 6 | Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc. | |||
28 | 6.01 | Office Rent | 10 | Month | |
29 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) | |||
30 | 7.01 | Office Supplies Drafting | 10 | Month | |
31 | 7.02 | Supplies Computer | 10 | Month | |
32 | 7.03 | Running Costs | 10 | Month | |
33 | 7.04 | Domestic and International Communication | 10 | Month | |
34 | 8 | Office Furniture and Equipment (Rental) | |||
35 | 8.01 | Office Furniture and Equipment | 1 | Lumpsum | |
36 | 9 | Reports and Document Printing | |||
37 | 9.01 | Monthly Report (3 copies per month) | 30 | No | |
38 | 9.02 | Inception Report & QAP | 3 | No | |
39 | 9.03 | Environment and Social Impact Screening Report | 4 | No | |
40 | 9.04 | Draft Feasibility Report | 4 | No | |
41 | 9.05 | Final Feasibility Report | 6 | No | |
42 | 9.06 | Strip Plan with L.A. Reports | 6 | No | |
43 | 9.07 | Draft LA and Clearances I Report | 4 | No | |
44 | 9.08 | Final LA and Clearances I Report | 4 | No | |
45 | 9.09 | Draft Environmental Assessment report& RAP | 4 | No | |
46 | 9.1 | Final Environmental Assessment report& RAP | 6 | No | |
47 | 9.11 | Draft Detailed Design Report & Drawings etc. | 4 | No | |
48 | 9.12 | Draft EMP | 4 | No | |
49 | 9.13 | Draft Bidding Document | 4 | No | |
50 | 9.14 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. | 6 | No | |
51 | 9.15 | Final EMP | 6 | No | |
52 | 9.16 | Final Bidding Documents | 6 | No | |
53 | 9.17 | Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) | 9 | No | |
54 | 9.18 | LA & Clearances II Report | 6 | No | |
55 | 10 | Survey and Investigation A. Topographical Survey (Fixed Rate) | |||
56 | 10.01 | Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. | 1 | Complete Job | |
57 | 10.02 | Detailed topographic surveys using mobile/ aerial LiDAR or better technology | 1 | Complete Job | |
58 | 11 | Investigation (Fixed cost)(lumpsum) | |||
59 | 11.01 | Road and Bridge Inventory | 1 | Complete Job | |
60 | 11.02 | FWD Test And Pavement Evaluation | 1 | Complete Job | |
61 | 11.03 | Roughness Survey | 1 | Complete Job | |
62 | 11.04 | Axle load Survey | 1 | Complete Job | |
63 | 11.05 | Material Survey and Investigation | 1 | Complete Job | |
64 | 11.06 | Sub grade Investuigation | 1 | Complete Job | |
65 | 11.07 | Traffic Survey | 1 | Complete Job | |
66 | 11.08 | Socio economic and Census Survey/Studies | 1 | Complete Job | |
67 | 11.09 | Land Acquisition Studies | 1 | Complete Job | |
68 | 11.1 | Any other investigations/surveys | 1 | Complete Job | |
69 | 11.11 | Sub-Soil Investigation (Boring) (Rate/m) | |||
70 | 11.12 | a) In soil other than hard rock | 1500 | Meter | |
71 | 11.13 | b) In hard rock | 200 | Meter | |
72 | 11.14 | Net Work Survey and GPR | |||
73 | 11.15 | Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. | 1 | Complete Job | |
74 | 11.16 | GPR Survey for detection of under ground utilities | 1 | Complete Job | |
75 | 12 | Fixing Boundary pillars | |||
76 | 12.01 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval | 1 | Complete Job | |
77 | 13 | Land Acquisition Team including support staff and logistics/transportation | |||
78 | 13.01 | Ex-Land Revenue Inspector/Officer or equivalent\n | 8 | Month | |
79 | 13.02 | Ex-Kanoogo/Girdwar or equivalent | 8 | Month | |
80 | 13.03 | Ex-Patwari or equivalent\n | 8 | Month | |
81 | 13.04 | Typist (2 nos. X 8 months) | 16 | Month | |
82 | 13.05 | Peon | 8 | Month | |
83 | 14 | Logistics for Land acquisition Team | |||
84 | 14.01 | Computer including necessary\nperipherals (2 nos. X 8 months)\n | 16 | Month | |
85 | 14.02 | Printers (2 nos. X 8 months) | 16 | Month | |
86 | 14.03 | Vehicles (Bolero or equivalent)\nwith monthly running limit of 4000 km\n | 8 | Month | |
87 | 15 | Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder) | |||
88 | 15.01 | Position (Value= 0) | |||
89 | 15.02 | Position (Value= 0) | |||
90 | 15.03 | Position (Value= 0) | |||
91 | 15.04 | Position (Value= 0) | |||
92 | 15.05 | Position (Value= 0) | |||
93 | 15.06 | Position (Value= 0) | |||
94 | 15.07 | Position (Value= 0) | |||
95 | 15.08 | Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns) | |||
96 | 15.09 | Position (Value= 0) | |||
97 | 15.1 | Position (Value= 0) | |||
98 | 15.11 | Position (Value= 0) | |||
99 | 15.12 | Position (Value= 0) | |||
100 | 15.13 | Position (Value= 0) | |||
101 | 15.14 | Position (Value= 0) | |||
102 | 15.15 | Position (Value= 0) | |||
103 | 16 | Moblization and Demoblization-Inland Travel in Home country (Fixed Costs) | 1 | LumpSum | |
104 | 17 | Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) | 1 | LumpSum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail