Ministry Of Road Transport And Highways has published Consultancy Services For Balance Works Of Land Acquisition Plan , Forest Clearances Proposals And Other Pre Construction Activities In Respect Of Detailed Project Report ( Drp ) For Sainj-Luhri-Jalori-Banjar-Aut Road Excluding Jalori Pass Tunnel Of Nh-. Submission Date for this Tender is 06-09-2021. Laser Printers Tenders in Rampur Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Jul-2021 | Corrigendum | Date | 21-08-2021 |
2 | 07-Aug-2021 | Corrigendum | Technical Bid | 21-08-2021 |
3 | 19-Aug-2021 | Reg extend of date | Date | 01-09-2021 |
4 | 28-Aug-2021 | Corrigendum 2 | Date | 06-09-2021 |
Consultancy Services for Balance works of Land Acquisition Plan, Forest Clearances proposals and other pre construction activities in respect of Detailed Project Report (DPR) for Sainj-Luhri-Jalori-Banjar-Aut road excluding Jalori Pass Tunnel of NH-305 from Km 0/00 to 97/00 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per diem allowance) | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Team Leader cum Senior Highway Engineer | BI01010001010000000000000515BI0100001113 | 6 | Month |
3 | 1.02 | Senior Survey Engineer | BI01010001010000000000000515BI0100001114 | 5 | Month |
4 | 1.03 | Environmental Specialist | BI01010001010000000000000515BI0100001115 | 2 | Month |
5 | 1.04 | Quantity Surveyor/ Documentation Expert | BI01010001010000000000000515BI0100001116 | 3 | Month |
6 | 1.05 | Land acquisition Expert | 6 | Month | |
7 | 1.06 | Utility Expert | 2 | Month | |
8 | 2 | Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) | |||
9 | 2.01 | Position | 1 | Month | |
10 | 2.02 | Position | 1 | Month | |
11 | 2.03 | Position | 1 | Month | |
12 | 2.04 | Position | 1 | Month | |
13 | 2.05 | Position | 1 | Month | |
14 | 2.06 | Position | 1 | Month | |
15 | 2.07 | Position | 1 | Month | |
16 | 3 | Support Staff (inclusive of per diem allowance)\nNote: To be assessed by consultant as per requirement of assignment | |||
17 | 3.01 | Office Manager | 6 | Month | |
18 | 3.02 | Typist | 6 | Month | |
19 | 3.03 | Office Boy | 6 | Month | |
20 | 3.04 | Night Watchman | 6 | Month | |
21 | 4 | Transportation (Fixed Costs) | |||
22 | 4.01 | The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc. | 1 | Complete Job | |
23 | 5 | Duty Travel to Site (Fixed Costs) | |||
24 | 5.01 | Trips | 1 | Complete Job | |
25 | 6 | Office Rent (Fixed Costs) \nThe rent cost includes maintenance, cleaning, repairs, etc. | |||
26 | 6.01 | Office Rent | 6 | Month | |
27 | 7 | Office Supplies, Utilities and Communication (Fixed Costs) | |||
28 | 7.01 | Office Supplies Drafting | 6 | Month | |
29 | 7.02 | Supplies Computer | 6 | Month | |
30 | 7.03 | Running Costs | 6 | Month | |
31 | 7.04 | Domestic and International Communication | 6 | Month | |
32 | 8 | Office Furniture and Equipment (Rental) | |||
33 | 8.01 | Office Furniture and Equipment | 1 | Lumpsum | |
34 | 9 | Reports and Document Printing | |||
35 | 9.01 | Monthly Report (3 copies per month) | 18 | No | |
36 | 9.02 | Updated Environment and Social Impact | 4 | No | |
37 | 9.03 | Strip Plan with L.A. Reports | 6 | No | |
38 | 9.04 | Draft LA and Clearances I Report | 4 | No | |
39 | 9.05 | Final LA and Clearances I Report | 4 | No | |
40 | 9.06 | Draft Environmental Assessment report& RAP | 4 | No | |
41 | 9.07 | Final Environmental Assessment report& RAP | 6 | No | |
42 | 9.08 | Updated bill of quantities, Updated cost estimates | 6 | No | |
43 | 9.09 | Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each) | 9 | No | |
44 | 9.1 | LA & Clearances II Report | 6 | No | |
45 | 10 | Investigation (Fixed cost)(lumpsum) | |||
46 | 10.01 | Land Acquisition Studies | 1 | LumpSum | |
47 | 10.02 | Any other investigations/surveys | 1 | LumpSum | |
48 | 11 | Fixing Boundary pillars | |||
49 | 11.01 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval | 1 | Lumpsum | |
50 | 12 | Land Acquisition Team including support staff and logistics/transportation | |||
51 | 12.01 | Ex-Land Revenue Inspector/Officer or equivalent\n | 6 | Month | |
52 | 12.02 | Ex-Kanoogo/Girdwar or equivalent | 6 | Month | |
53 | 12.03 | Ex-Patwari or equivalent\n | 6 | Month | |
54 | 12.04 | Typist (2 nos.x6Months) | 12 | Month | |
55 | 12.05 | Peon | 6 | Month | |
56 | 13 | Logistics for Land acquisition Team | |||
57 | 13.01 | Computer including necessary\nperipherals (2 nos.x6 Months)\n | 12 | Month | |
58 | 13.02 | Printers (2 nos.x 6 Months) | 12 | Month | |
59 | 13.03 | Vehicles (Bolero or equivalent)\nwith monthly running limit of 4000 km\n | 6 | Month | |
60 | 14 | Estimate of ExpatriateConsultants (Name and position to be filled in below columns by the bidder) | |||
61 | 14.01 | Position | 1 | Month | |
62 | 14.02 | Position | 1 | Month | |
63 | 15 | Moblization and Demoblization- International Airfares (Fixed Costs) (To be filled by bidders in below columns) | 1 | LumpSum | |
64 | 16 | Moblization and Demoblization-Inland Travel in Home country (Fixed Costs) | 1 | LumpSum | |
65 | 17 | Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost) | 1 | LumpSum |