Tender For Fabrication Work For The Year 2021-22, SUGAR MILL PALWAL-Haryana

Cooperative Sugar Mills Societies has published Tender For Fabrication Work For The Year 2021-22. Submission Date for this Tender is 14-07-2021. Clothing Accessories Tenders in SUGAR MILL PALWAL Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

28416485
Tender For Fabrication Work For The Year 2021-22
Open Tender
Indian
Haryana
SUGAR MILL PALWAL
14-07-2021

Tender Details

Tender For Fabrication Work For The Year 2021-22 - 1 M.S Pipe Line 2 Dismantling Of Pipe Lines 1” To 3’’ 3 Do 4’’To 11’’ 4 Do 12” To 20” 5 Do 21’’To 48’’ 6 M.S Pipe Line 7 Erection Of Pipe Line From 1” To 3” Dia 8 Do 4” To 11” 9 Do 12 To 20 10 Do 21 To 48 11 Fabrication Of Pipe Line From 12”Above 12 Flanges And Blind Up To 48” 13 Dismantling Of Flanges / Blind 14 Refitting Of Old / New Flanges / Blind 15 Fabrication Of Flanges Blind From M.S. Plate 16 Bends, Reducers And Nipples ( Up To 1’’ To 12’’ ) 17 Dismantling 18 Fabrication 19 Fitting 20 Bends, Reducers And Nipples ( Above 12’’ ) 21 Dismantling 22 Fabrication 23 Fitting 24 Dismantling , Fab. And Erection Of M.S. / G.L Pipe Naccessories ( Tee, Cross, Distance Piece Up To 12’’ ) N 25 Dismantling 26 Fabrication 27 Erection 28 Dismantling , Fab. And Erection Of M.S. / G.L Pipe Accessories ( Tee, Cross, Distance Piece Above 12’’ ) N 29 Dismantling 30 Fabrication 31 Erection 32 Dismantling , Fab. And Erection Of M.S. Tanks / Vassals From M.S Plate, Angle M.S Channel I Section Etc ( Up To 6 Mm Plates ) N 33 Dismantling 34 Fabrication 35 Erection 36 Dismantling, Fab. And Erection Of M.S. Plate Jobs N Boiler Ducting Boiler Casing Etc. ) Above 6 Mm Plate N 37 Dismantling 38 Fabrication 39 Erection 40 Dismantling And Erection Of Railing Ndismantling 41 Fabrication 42 Erection 43 Valves 44 Dismantling 1’’ To 6’’ 45 Dismantling 7’’ To 12’’ 46 Dismantling Above 12’’ Size 47 Fitting 1’’ To 6’’ 48 Fitting 7’’ To 12’’ 49 Fitting Above 12’’ Size 50 S.S Pipe Line 51 Dismantling Of All Size 52 Erection All Size 53 Dismantling, Fab., And Erection Of S.S.Pipe Accessories N ( Tee, Cross, Distance Piece, Nipples Reducer And Bend ) Up To 12” Ndismantling 54 Fabrication 55 Erection 56 Patch Work On Tank And Pipe N ( M S Plate Cutting, Fitting And Welding, 02 Round Welding ) N 57 Dismantling , Fabrication And Erection Of Cone Of Nbigger Size Will Be Treated N Dismantling N 58 Fabrication 59 Erection 60 Fabrication And Erection Of Gutter Of Any Size By Nrequired Thickness ( Bigger Size Will Be Treat As Dia ) N 61 Dismantling , Fabrication And Erection Of 3 Nos. Hood Nof Cutter , Chopper And Leveler By 8 / 6 Mm M.S. Plate N 62 Dismantling , Fabrication And Erection Of M.S. Boiler Chimney Nbase Dia = 3.5 M, Top Dia= 2.5 M, Hight Dia = 30 M N 63 Dismantling Of Old And Erection Of New I D Fan N Taper Cone. 64 Dismantling , Fabrication And Erection Of Old Ducting From I.D. Fan Inlet Damper To I D Fan . N 65 Dismantling , Fabrication And Erection Of Flue Gas Nducting Size 5’ X 5’ N 66 Dismantling , Fabrication And Erection Of I.D.. Fan Casing Nform 8 To 10Mm M.S Plate . N 67 Dismantling , Fabrication And Erection Of I.D. Fan Noutlet Damper 68 Dismantling , Fabrication And Erection Of I.D. Nfan Inlet Damper 69 Dismantling , Fabrication And Erection Of Bagasse Nelevator, Bagasse Carrier And Rbc Bottom And Side Nplate Worn Out Portion N 70 Dismantling , Fabrication And Erection Of Boiler Bagasse Feeding Chute By 8 / 6 Mm M.S. Plate. N 71 Dismantling , Erection And Fabrication Of Umbrella Of Pan. 72 Dismantling , Fabrication And Erection Of Save All Of Quad Body. Ndismantling 73 Fabrication 74 Erection 75 Dismantling , Fabrication And Erection Of Save All Of Pan. Ndismantling 76 Fabrication 77 Erection 78 Stair Case ( Fab. With Chaquered Plate / Old Plate And Pipe Line ) Ndismantling 79 Fabrication 80 Erection 81 Dismantling And Erection Of Pump Up To 4’’ And 15 Hp Motor Shifting Of Pump / Motor More Than 20 Mtr Distance N 82 Dismantling 83 Erection 84 Dismantling And Erection Of Pump More Than 4” And N15 H.P Motor Shifting Of Pump / Motor More Than N20 Mtr Distance 85 Dismantling 86 Erection ( Pump / Motor ) 87 Ammonia And Gas Coils N ( Dismantling , Fab. And Erection ) 88 Dismantling 89 Fabrication 90 Erection 91 Dismantling , Fabrication And Erection Of New Plate Form As Per Requirement From Old M S Plate 6 Mm To 8 Mm Thickness. Up To 2 Sqm Ndismantling 92 Fabrication 93 Erection 94 Dismantling , Fabrication, And Erection Of New N Plate From By M S / Chequared Plate More Than 2 Sqmtr Ndismantling 95 Fabrication 96 Erection 97 Crystallizer Coils Ndismantling 98 Fabrication 99 Erection 100 Old And Worn Out Staging , Plate Farm Tank, Vassals. Ndismantling 101 Fabrication 102 Erection 103 Repairing Of Rubber Seated Exhaust / Vapor Valve N Above 16 “ 104 Dismantling , Fabrication And Erection Of Side Plate Of Cane Kicker Cutter, Leveler, And Chopper By 8 / 6 Mm M.S. Plate N 105 Dismantling , Fabrication And Erection Of Mill Juice Tray By 8 Mm / 10 Mm M.S Plate N 106 Dismantling Of Existing Cane Carrier Chute And Nfabrication And Erection Of 8 To 10 Mm M.S Plate 107 Repairing Of Steam Jacket For Sulphur Furnace 108 Replacement Of Steam Jacket Of Evaporator Bodies 109 Strengthening Of Vapour Line Above 16” By Inner And Nouter Side / Ring Of Angle / Pipes N 110 Dismantling , Fabrication And Erection Of Support Angle, Pipe, Channel At Any Equipment N 111 Hopper Centre Piece By 12 Mm Plate 112 Dismantling 113 Fabrication 114 Erection 115 Hopper Tray Ndismantling 116 Fabrication 117 Erection 118 Sulphur Furnace Cooler Dismantling , Fab. And Nerection Work 119 Sulphur Furnace Scrubber Dismantling , Fabrication N And Erection Work N 120 ‘B’ Vacuum Crystallizer Shell To Be Changed From N 10 Mm M.S. Plate N 121 ‘C, Vacuum Crystallizer Shell To Be Changed From 10 Nmm M.S. Plate N 122 Dismantling Of Rcc Plate Form Of Sulpher Furnace Nwith Shifting Of Waste Nmaterial Complete In All Respects And Strengthening The Same With All Column And M.S. Beams N 123 Strengthening Of Factory Columns Of Various Size By N10 Mm M.S.Plate Angle Channels Etc. 124 Strengthening Of Factory Beams Of Any Size By M.S.Plate Angle Channel I. Section Etc. 125 Chipping , Cleaning And Painting Of Columns And Beams Nor Staging Of Factory Machinery. N 126 Painting One Coat With Ready Mixed Paint In Factory Nbuilding M.S. Column ( 25 Mtr Approx. Height. And N15-5 Mtr Height Approx ) And M.S Trusses Including Nrubbing Down Old ( If Required At Site.All The Bracing Nand Purlins Are Included With This Work. 127 Dismantling, Fabrication And Erection Of Any Size Nfactory / Building, Columns Beams And Trusses 128 Dismantling , Fabrication And Erection Of Worn Out Nwater Pipes, Nozzles, Drain Box Etc. 129 Dismantling , Fabrication And Erection Of Worn Out Shell N Of Both Wet Scrubber N 130 Dismantling, Fabrication And Erection Of Worn Out Ninternal Of Both Wet Scrubber 131 Dismantling, Fabrication And Erection Of Worn Flue Gas Nducting Size 5’ X5’Of Both Wet Scrubber From Damper To Nchimney N 132 Replacement Of Worn Out Portion Of Supports Of Nmolasses Tank Roof. 133 Replacement Of Worn Out Portion Of Roof Of Nmolasses Tank 134 Dismantling Of Boiler Exit Flue Gas Damper 135 Dismantling, And Erection Of Boiler I.D., F.D. Nfan Impeller 136 Fabrication And Erection Of 06 Nos. M.S. Column Below N Sulpher Furnace Plate Form And Raising Of Same Up To N Required Height. 137 Replacement Of Weak Portion Of Molasses Tank Up To A N Height Of 10 Mtr By 6 Mm, 8 Mm, 10 Mm Plate Etc. N N 138 Providing Roof Above Molasses Khacha Pit By M.S. / Cgi N Sheets With Proper Columns, Staging And Tresses 139 Dismantling And Assembling Of Air Heater Outlet Ducting 140 Dismantling Of Worn Out Air Heater Tubes 141 Replacement Of Worn Out Air Heater Tubes. 142 Dismantling , Fabrication, Erection Of Worn Out Both Nboiler Blow Down Line Boiler To Drain Pit. N 143 Dismantling, Fabrication, Erection Of Worn Out Of 2 Nos. N5” Long Bend Of Feed Water Line Header N 144 Removal Of Hanging Old Lagging And Fixing Of New Glass Wool, Plastered By P.O.P Or Hasean Cloth And Covered Wire Netting ( Murga Jali ) Without Material Up To 75 Mm Thickness N 145 Replacement Of Juice Heater Partition Plate In All Nrespects 146 Pan No.1 Top Cone Replacement Work. 147 Reconditioning Of Worn Out 02 Nos. J.H. ( 04 Nos Covers ) Juice Heater Grooves With Respect To Its Top / Bottom Mating At Outside Cover N 148 Dismantling And Erection Of 6 Dia C.I. Cross. 149 Fabrication Of 6 Dia C.I. Cross 150 Dismantling , Fabrication, Erection Of 10 X 20 Vacuum N Filter Mud Tray N 151 Dismantling Of Worn Out Body Shell Of Pan No. 6 152 Fabrication And Erection Of Body Shell Pan No. 6 153 Dismantling , Fabrication, Erection Of 8 X 16 Vacuum Nfilter Mud Tray N 154 Juice Heater No. 1 Both Covers To Be Dismantle And Erection Nafter Machining Work At Both Shafts. 155 Dismantling Of Worn Out Bottom And Fabrication And Erection Of New Bottom Of Crystlizer No. 3, 4, 9 10 And 11 Entrainment Catcher Of Pan 156 Dismantling, Fabrication And Erection Of M.S Band 12” To 20” 157 Dismantling, Fabrication And Erection Of M.S Band 21” To 40” 158 Dismantling Of Evaporator ( Quad ) Spare Body S.S. Tubes 159 Re-Tubing Of Evaporator ( Quad ) Spare Body 160 Dismantling Of Vc-1100 M3 S.S. Tubes 161 Re-Tubing Of Vc-1100 M3 S.S. Tubes 162 Increasing The Length Of Hydraulic Grab Fingers 163 Dismantling , Fabrication, Erection Of Kicker Drum Nwith Holder Assembly 164 Dismantling , Erection Commission Of Pan Discharge Valve Nof Pan No 5 And 6 165 Modification Of Mill Kush Kush Conveyor 166 Fabrication Of Staging Of C / F Machine Nk 1100 And Erection And Commission Of C / F Machine Nk 1100 2 Nos 167 Fabrication, Erection Of New Juice Door Filtration System 168 Dismantling , Fabrication, Erection Of Flocculating Chamber Top N And Bottom Plate Of Door 169 Crystallizer Spiral Ribbon Strip Has To Dismantle And Again Set Right Fitting. Nworn Out Arms And Other Related Work Also To Be Done 170 Dismantling , Fabrication, Erection Of Worn Out Runner Of Cane Carrier / Bagasse Elevator / Rbc / Mbc N 171 Dismantling, Fabrication And Erection Of Agitator Of Vacuum Filter 172 Dismantling , Fabrication, Erection Of Worn Out Portion Nof D.S.M. Screen 173 Fabrication, Erection Of I.D Fan Cone Ring With Flange 174 Erection And Commissioning Of B- Messcutte C / F Machine Including Machine Structure , Leveling Of Machine And Related Work To Be Done In All Respect Of M / C 175 Dismantling Of Old Worn Out And Fabrication, Erection Of Nnew Juice Sulphitor Internal Drum 176 Juice Ring Fabrication By 6Mm Plate For Mill Rollers 177 Hinge Type Cover Fabrication At Copper, Leveler And Cutter 178 Boilers No.2 6” Live Steam Line From Boiler No.2 To Main Steam Distributer To Be Modified N 179 Both Boilers 4” Dia Main Blow Down Line From Chimney To Pit Replacement Work N 180 Boiler Feed Tank Replacement 181 All Bagasse Chute Of Both Boilers To Be Modified 182 Rack And Pinion To Be Fitted In Mbc At Bagasse Loading Chute 183 Labour Supply ( Per Day 8 Hr. Basis ) Na ) Turner / Mechinist Nb ) Fitter Nc ) Welder Nd ) Helper Ne ) Khalasi N 184 Dismantling, Fab. & Erection Of Widening Work Of Mbc Nby 250 Mm Of Existing Columns Approx. Total Turf Length=125 M N 185 Dismantling, Fab. & Erection Of Tail End Shaft, Idler Shaft And Ndriving Shaft With Plumber Blocks & Driving Unit Etc For Mbc & Ncane Carrier. ( 5 Nos Shaft For Mbc ) N 186 Dismantling, Fab. & Erection Of Cane Carrier N02 Nos. Shaft

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Tender for Fabrication work for the year 2021-22
Sl. No. Item Description Item Code / Make Quantity Units
1 1 M.S Pipe Line 1 Per.in.dia/ ft.length
2 2 Dismantling of pipe lines 1” to 3’’ 1 Per.in.dia/ ft.length
3 3 do 4’’to 11’’ 1 Per.in.dia/ ft.length
4 4 do 12” to 20” 1 Per.in.dia/ ft.length
5 5 do 21’’to 48’’ 1 Per.in.dia/ ft.length
6 6 M.S Pipe Line 1 Per.in.dia/ ft.length
7 7 Erection of pipe line from 1” to 3” dia 1 Per.in.dia/ ft.length
8 8 do 4” to 11” 1 Per.in.dia/ ft.length
9 9 do 12 to 20 1 Per.in.dia/ ft.length
10 10 do 21 to 48 1 Per.in.dia/ ft.length
11 11 Fabrication of pipe line from 12”above 1 Per.in.dia/ ft.length
12 12 Flanges and blind up to 48” 1 Per inch dia/pc
13 13 dismantling of flanges/blind 1 Per inch dia/pc
14 14 refitting of old/new flanges/blind 1 Per inch dia/pc
15 15 fabrication of flanges blind from M.S. plate 1 Per inch dia/pc
16 16 Bends, reducers and nipples (up to 1’’ to 12’’) 1 Per inch dia/pc
17 17 Dismantling 1 Per inch dia/pc
18 18 fabrication 1 Per inch dia/pc
19 19 fitting 1 Per inch dia/pc
20 20 Bends, reducers and nipples (above 12’’) 1 Per inch dia/pc
21 21 Dismantling 1 Per inch dia/pc
22 22 fabrication 1 Per inch dia/pc
23 23 fitting 1 Per inch dia/pc
24 24 Dismantling , fab. and erection of M.S. / G.l pipe \nAccessories ( Tee, cross,distance piece up to 12’’) \n 1 Per inch dia/pc
25 25 Dismantling 1 Per inch dia/pc
26 26 Fabrication 1 Per inch dia/pc
27 27 Erection 1 Per inch dia/pc
28 28 Dismantling , fab. and erection of M.S. / G.l pipe Accessories ( Tee,cross, distance piece above 12’’) \n 1 Per inch dia/pc
29 29 Dismantling 1 Per inch dia/pc
30 30 Fabrication 1 Per inch dia/pc
31 31 Erection 1 Per inch dia/pc
32 32 Dismantling , fab. and erection of M.S. tanks/vassals from M.S plate, angle M.S channel 'I' section etc ( up to 6 mm plates)\n 1 L.S. /pc
33 33 Dismantling 1 P MT
34 34 Fabrication 1 P MT
35 35 Erection 1 P MT
36 36 Dismantling, Fab. and Erection of M.S. plate jobs \n boiler ducting boiler casing etc.) above 6 mm plate\n 1 P MT
37 37 Dismantling 1 P MT
38 38 Fabrication 1 P MT
39 39 Erection 1 P MT
40 40 Dismantling and Erection of railing \nDismantling 1 Per.in.dia/ ft.lth
41 41 Fabrication 1 Per.in.dia/ ft.lth
42 42 Erection 1 Per.in.dia/ ft.lth
43 43 Valves 1 Per inch dia/pc
44 44 Dismantling 1’’ to 6’’ 1 Per inch dia/pc
45 45 Dismantling 7’’ to 12’’ 1 Per inch dia/pc
46 46 Dismantling above 12’’ size 1 Per inch dia/pc
47 47 fitting 1’’ to 6’’ 1 Per inch dia/pc
48 48 fitting 7’’ to 12’’ 1 Per inch dia/pc
49 49 fitting above 12’’ size 1 Per inch dia/pc
50 50 S.S Pipe Line 1 Per inch dia / ft. length
51 51 Dismantling of all size 1 Per inch dia /ft. length
52 52 Erection all size 1 Per inch dia /ft. length
53 53 Dismantling,fab., and erection of S.S.pipe Accessories\n(tee,cross,distance piece,nipples reducer and bend) up to 12” \nDismantling 1 Per inch dia/pc
54 54 Fabrication 1 Per inch dia/pc
55 55 Erection 1 Per inch dia/pc
56 56 Patch Work on tank and pipe \n(M S plate cutting, fitting and welding, 02 round welding) \n 1 Per sq. mtr.
57 57 Dismantling , Fabrication and Erection of cone of \nbigger size will be treated\n Dismantling \n 1 Per inch dia /mtr. lth.
58 58 Fabrication 1 Per inch dia / mtr. lth.
59 59 Erection 1 Per inch dia / mtr. lth.
60 60 Fabrication and Erection of gutter of any size by \nRequired thickness (bigger size will be treat as dia) \n 1 per cross sectional area \nper mtr running length\n
61 61 Dismantling , fabrication and erection of 3 Nos. hood \nof cutter ,chopper and leveler by 8/6 mm M.S. plate\n 1 L.S. per hood
62 62 Dismantling , Fabrication and erection of M.S. Boiler Chimney\nBase DIA = 3.5 M, Top Dia= 2.5 M, Hight Dia = 30 M\n 1 Per Feet height
63 63 Dismantling of old and erection of new I D Fan\n taper cone. 1 L.S. / Unit
64 64 Dismantling , Fabrication and erection of old ducting from I.D. fan inlet damper to I D Fan .\n 1 L.S. / Unit
65 65 Dismantling , Fabrication and erection of flue gas \nducting size 5’ x 5’ \n 1 L.S./Unit
66 66 Dismantling , fabrication and erection of I.D.. fan casing \nform 8 to 10mm M.S plate .\n 1 L.S. / Unit
67 67 Dismantling , fabrication and erection of I.D. Fan \noutlet damper 1 L.S. /Unit
68 68 Dismantling , fabrication and erection of I.D. \nFan inlet damper 1 L.S. /Unit
69 69 Dismantling ,fabrication and Erection of Bagasse \nelevator, bagasse carrier and RBC bottom and side \nplate worn out portion \n 1 Per sq.mtr.
70 70 Dismantling , fabrication and erection of Boiler bagasse feeding Chute by 8/6 mm M.S. plate. \n 1 L.S. /Unit
71 71 Dismantling , erection and fabrication of umbrella of pan. 1 L.S./Per pc.
72 72 Dismantling , fabrication and erection of save all of Quad body. \nDismantling 1 L.S.// Unit
73 73 Fabrication 1 L.S./ Unit
74 74 Erection 1 L.S. / Unit
75 75 Dismantling , Fabrication and Erection of save all of pan. \nDismantling 1 L.S. / Unit
76 76 Fabrication 1 L.S./ Unit
77 77 Erection 1 L.S./ Unit
78 78 Stair case( fab. with chaquered plate /old plate and pipe line) \nDismantling 1 Per ft width
79 79 Fabrication 1 Per ft width
80 80 Erection 1 Per ft width
81 81 Dismantling and erection of pump up to 4’’ and 15 hp motor Shifting of pump / motor more than 20 mtr distance \n 1 per inch suction/hp
82 82 Dismantling 1 per inch suction/hp
83 83 Erection 1 per inch suction/hp
84 84 Dismantling and erection of pump more than 4” and \n15 H.P motor Shifting of pump / motor more than \n20 mtr distance 1 per inch suction/hp
85 85 Dismantling 1 per inch suction/hp
86 86 Erection ( pump / motor) 1 per inch suction/hp
87 87 Ammonia and gas coils\n ( Dismantling , fab. and erection) 1 Per inch dia /mtr. lth.
88 88 Dismantling 1 Per inch dia / mtr.lth.
89 89 Fabrication 1 Per inch dia /mtr.lth.
90 90 Erection 1 Per inch dia /mtr.lth.
91 91 Dismantling , fabrication and erection of new plate form as Per requirement from old M S plate 6 mm to 8 mm thickness. up to 2 sqm \nDismantling 1 per sq.mtr.
92 92 Fabrication 1 per sq.mtr.
93 93 Erection 1 per sq.mtr
94 94 Dismantling , fabrication, and erection of new \n Plate from by M S/ chequared plate more than 2 sqmtr\nDismantling 1 P M T
95 95 Fabrication 1 P M T
96 96 Erection 1 P M T
97 97 Crystallizer Coils \nDismantling 1 Per inch dia /mtr.lth
98 98 Fabrication 1 Per inch dia /mtr. lth
99 99 Erection 1 Per inch dia /mtr. lth
100 100 Old and worn out staging , plate farm tank, vassals. \nDismantling 1 P M T
101 101 Fabrication 1 P M T
102 102 Erection 1 P M T
103 103 Repairing of rubber seated exhaust /vapor valve \n above 16 “ 1 Per in. dia.Per pc
104 104 Dismantling , fabrication and erection of side plate of cane kicker cutter, leveler, and chopper by 8/6 mm M.S. plate\n 1 Per.sq.mtr
105 105 Dismantling , fabrication and erection of mill juice tray by 8 mm/10 mm M.S plate \n 1 L.S.per mill tray
106 106 Dismantling of existing cane carrier chute and \nfabrication and erection of 8 to 10 mm M.S plate 1 L.S. Unit
107 107 Repairing of steam jacket for sulphur furnace 1 Per pc
108 108 Replacement of steam jacket of evaporator bodies 1 L.S. per body
109 109 Strengthening of vapour line above 16” by inner and \nouter side/ring of angle/pipes \n 1 Per pc
110 110 Dismantling , fabrication and erection of support angle,pipe, channel at any equipment \n 1 per running\n mtr.length\n
111 111 Hopper centre piece by 12 mm plate 1 L.S./Pc
112 112 Dismantling 1 L.S./pc
113 113 Fabrication 1 L.S./pc
114 114 Erection 1 L.S./pc
115 115 Hopper tray \nDismantling 1 Per. Sq. mtr.
116 116 Fabrication 1 Per. Sq. mtr.
117 117 Erection 1 Per. Sq. mtr.
118 118 Sulphur Furnace cooler dismantling ,fab. and \nerection work 1 L.S/pc
119 119 Sulphur Furnace scrubber dismantling , fabrication\n and erection work \n 1 L.S/pc
120 120 ‘B’ Vacuum crystallizer shell to be changed from\n 10 MM M.S. plate \n 1 L.S.
121 121 ‘C, Vacuum crystallizer shell to be changed from 10 \nMM M.S. plate \n 1 L.S.
122 122 Dismantling of RCC plate form of Sulpher Furnace \nwith shifting of waste \nmaterial complete in all respects and strengthening the same with all column and M.S. beams\n 1 L.S/S.F
123 123 Strengthening of factory columns of various size by \n10 mm M.S.Plate angle channels etc. 1 per running mtr.
124 124 Strengthening of factory beams of any size by M.S.plate angle channel I. Section etc. 1 per running mtr.
125 125 Chipping ,cleaning and painting of columns and beams \nor staging of factory machinery.\n 1 per mtr.
126 126 Painting one coat with ready mixed paint in factory \nbuilding M.S. column ( 25 mtr approx. height. and \n15-5 mtr height approx) And M.S trusses including \nrubbing down old ( if required at site.All the bracing \nand purlins are included with this work. 1 Per.mtr.
127 127 Dismantling, Fabrication and erection of any size\nfactory/Building,columns beams and trusses 1 L.S /unit
128 128 Dismantling ,Fabrication and erection of worn out \nWater pipes, nozzles, drain box etc. 1 L.S
129 129 Dismantling ,Fabrication and erection of worn out shell\n of both wet Scrubber \n 1 L.S
130 130 Dismantling, Fabrication and erection of worn out \ninternal of both wet Scrubber 1 L.S
131 131 Dismantling, Fabrication and erection of worn flue gas \nducting Size 5’ x5’of both Wet Scrubber from damper to \nchimney \n 1 per sq mtr.
132 132 Replacement of worn out portion of supports of \nmolasses tank roof. 1 per sq.mtr.
133 133 Replacement of worn out portion of roof of \nmolasses tank 1 per sq.mtr.
134 134 Dismantling of Boiler exit flue gas damper 1 L.S
135 135 Dismantling, and erection of Boiler I.D., F.D. \nFan impeller 1 L.S
136 136 Fabrication and erection of 06 Nos. M.S. column below\n sulpher furnace plate form and raising of same up to\n required height. 1 L.S
137 137 Replacement of weak portion of molasses tank up to a\n height of 10 mtr by 6 mm,8 mm,10 mm plate etc.\n \n 1 per mtr.
138 138 Providing roof above molasses khacha pit by M.S./CGI\n sheets with Proper columns, staging and tresses 1 per mtr.
139 139 Dismantling and assembling of air heater outlet ducting 1 L.S/unit
140 140 Dismantling of worn out Air Heater tubes 1 Per tube
141 141 Replacement of worn out Air Heater tubes. 1 Per tube
142 142 Dismantling , fabrication, erection of worn out both\nboiler blow down line boiler to drain pit.\n 1 per.in dia/ft
143 143 Dismantling, fabrication, erection of worn out of 2 nos.\n5” long bend of feed water line header\n 1 L.S/unit
144 144 Removal of hanging old lagging and fixing of new glass wool, plastered by P.O.P or hasean cloth and covered wire netting (murga jali) without material Up to 75 mm thickness\n 1 per sq.ft
145 145 Replacement of juice heater partition plate in all \nrespects 1 per juice heater
146 146 Pan No.1 top cone replacement work. 1 L.S
147 147 Reconditioning of worn out 02 Nos. J.H. ( 04 Nos covers)Juice Heater grooves with respect to its top/bottom mating at outside cover\n 1 per juice heater
148 148 Dismantling and erection of 6" dia C.I. cross. 1 L.S
149 149 Fabrication of 6" dia C.I. cross 1 L.S
150 150 Dismantling , fabrication, erection of 10' x 20 ' vacuum\n filter mud tray\n 1 L.S
151 151 Dismantling of worn out body shell of pan no. 6 1 L.S
152 152 Fabrication and erection of body shell pan no. 6 1 L.S
153 153 Dismantling , fabrication, erection of 8' x 16 ' vacuum \nfilter mud tray\n 1 L.S
154 154 Juice heater no. 1 both covers to be dismantle and erection \nafter machining work at both shafts. 1 L.S
155 155 Dismantling of worn out bottom and fabrication and erection of new bottom of Crystlizer no. 3,4,9 10 and 11 entrainment catcher of pan 1 L.S/unit
156 156 Dismantling, Fabrication and erection of M.S band 12” to 20” 1 L.S
157 157 Dismantling, Fabrication and erection of M.S band 21” to 40” 1 L.S
158 158 Dismantling of evaporator (quad) spare body S.S. tubes 1 L.S
159 159 Re-tubing of evaporator (quad) spare body 1 L.S
160 160 Dismantling of VC-1100 m3 S.S. tubes 1 L.S/unit
161 161 Re-tubing of VC-1100 m3 S.S. tubes 1 L.S
162 162 Increasing the length of hydraulic grab fingers 1 L.S/unit
163 163 Dismantling , fabrication, erection of kicker drum \nwith holder assembly 1 L.S
164 164 Dismantling , erection commission of pan discharge valve \nof pan no 5 and 6 1 L.S/unit
165 165 Modification of mill Kush Kush Conveyor 1 L.S
166 166 Fabrication of staging of C/F machine NK 1100 and erection and commission of C/F machine NK 1100 2 Nos 1 L.S
167 167 Fabrication, erection of new juice door filtration system 1 L.S/unit
168 168 Dismantling , fabrication, erection of flocculating chamber top\n and bottom plate of door 1 Per running mtr.
169 169 Crystallizer spiral ribbon strip has to dismantle and Again set right fitting. \nWorn out arms and other related Work also to be done 1 L.S
170 170 Dismantling , fabrication, erection of worn out runner of cane carrier/bagasse elevator/ RBC/MBC\n 1 L.S
171 171 Dismantling, Fabrication and Erection of agitator of vacuum filter 1 L.S
172 172 Dismantling , fabrication, erection of worn out portion \nof D.S.M. screen 1 L.S/unit
173 173 Fabrication, erection of I.D fan cone ring with flange 1 L.S
174 174 Erection and commissioning of B- messcutte C/F machine including machine structure ,leveling of machine and related work to be done in all respect of M/C 1 L.S
175 175 Dismantling of old worn out and fabrication, erection of \nnew juice sulphitor internal drum 1 L.S/cutter/kicker/\nleveler
176 176 Juice ring fabrication by 6mm plate for mill rollers 1 Per mtr running \nlength
177 177 Hinge type cover fabrication at copper, leveler and cutter 1 L.S
178 178 Boilers No.2 6” live steam line from Boiler No.2 to main steam distributer to be modified\n 1 L.S
179 179 Both Boilers 4” dia main blow down line from chimney to pit replacement work\n 1 Per day
180 180 Boiler feed tank replacement 1 Per day
181 181 All Bagasse chute of both boilers to be modified 1 Per day
182 182 Rack and pinion to be fitted in MBC at Bagasse loading chute 1 Per day
183 183 Labour supply ( per day 8 hr. basis)\na) Turner/Mechinist\nb) Fitter\nc) Welder\nd) Helper\ne) Khalasi\n 1 Per day
184 184 Dismantling, Fab. & Erection of widening work of MBC\nby 250 MM of existing columns approx. total turf length=125 M\n 1 Per running \nmeter length
185 185 Dismantling, Fab. & Erection of tail end shaft, idler shaft and\ndriving shaft with plumber blocks & driving unit etc for MBC &\ncane carrier. (5 Nos shaft for MBC) \n 1 L.S
186 186 Dismantling, Fab. & Erection of cane carrier \n02 Nos. shaft 1 L.S
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail