Repair / Routines On Miscellaneous Electrical Control Panel Onboard One Naval Vessel At Nsry ( Kar )
Tender Overview
Project Description
Nsry / L / 0052 / 03 Repair / Routines On Miscellaneous Electrical Control Panel Onboard One Naval Vessel At Nsry ( Kar ) , Main Switchboard , Calibrate 50% Panel Instruments / Meters , Carry Out In-Stu Serviceability Checks Of Breakers And Raise Specific Defect To Dockyard For Repairs , Carry Out Following Routines On Switchboard And Bus Bars:- ( A ) Inspect Lugs / Connectors / Ct / Pt And Other Components And Undertake Repair Deterioration / Damage Of Msb Cables / Wiring As Necessary . ( B ) Repair / Replace Bus Bars Insulators If Necessary . ( C ) Clean And Decarbonize The Bus Bars . , Fire Detection Alarm System , Carry Out Serviceability Checks Of All Units And Overall Checks Up Of System Including Acos Pcbs , Manual Call Points , Detectors & Hooters ( Where Applicable ) Project Specific Defect To Dockyard And Undertake Repair Replacement Of Defective Part . , Navigational Lights , Overhaul Navigational Lights Control Panels Check All The Switches And Replace Defective Switches , Check The Supply Cables Of Signaling Projectors If Perished Renew / Rewire , Check Bell Circuits And Check All The Lights For Correct Brilliancy , Portable Submaisible Pumps ( 40Tph ) , The Lubrication Of Mechanical Seal Should Be Checked . The Lubricant Might Get Contaminated With Foreign Material Or Get Blackened Due To Overheating In Such Cases . Oil Chamber Should Be Flushed And Filled With Fresh Oil Before Filling . Heat The Oil To 140 Degree C And Cool It To 60 Degree C For Removal Of Moister In Oil . , Cooking Range Hot Plate , Overhaul Equipment Completely And Do As Mentioned Below ( A ) Change The Element If Defective ( B ) Renew The Internal Wiring If Perished ( C ) Check The Rotary Switches Changes With New One If ( D ) Calibrate Temperature Sensors And Temperature Gauge If Fitted ( E ) Check Temperature Cut Out Of Water Heater For Satisfactory Operation And Adjust As Required
BOQ
| Name of Work: REPAIR / ROUTINES ON MISCELLANEOUS ELECTRICAL CONTROL PANEL ONBOARD ONE NAVAL VESSEL AT NSRY(KAR) | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | MAIN SWITCHBOARD | 111 | ||
| 2 | 1.1 | Calibrate 50% panel Instruments/ Meters | 112 | 13 | Nos |
| 3 | 1.2 | Carry out IN-STU serviceability checks of Breakers and raise specific defect to Dockyard for repairs | 113 | 25 | Nos |
| 4 | 1.3 | Carry out following Routines on Switchboard and Bus bars:- \n(a) Inspect Lugs/ Connectors/ CT/ PT and other Components and undertake Repair Deterioration/ Damage of MSB cables/ Wiring as necessary.\n(b) Repair/ Replace Bus bars insulators if necessary.\n(c) Clean and decarbonize the Bus bars.\n\n | 114 | 1 | Job |
| 5 | 2 | FIRE DETECTION ALARM SYSTEM | 115 | ||
| 6 | 2.1 | Carry out serviceability checks of all units and overall checks up of system including ACOS PCBs, Manual call points, Detectors & Hooters (where applicable) project specific defect to dockyard and undertake repair replacement of defective part. | 116 | 29 | Nos |
| 7 | 3 | NAVIGATIONAL LIGHTS | 117 | ||
| 8 | 3.1 | Overhaul Navigational Lights Control Panels Check All The Switches and Replace Defective Switches | 118 | 1 | Job |
| 9 | 3.2 | Check The Supply Cables of Signaling Projectors if Perished Renew/Rewire | 119 | 2 | Nos |
| 10 | 3.3 | Check Bell Circuits And Check All The Lights For Correct Brilliancy | 120 | 5 | Nos |
| 11 | 4 | PORTABLE SUBMAISIBLE PUMPS (40TPH) | 121 | ||
| 12 | 4.1 | The lubrication of Mechanical seal should be checked. The lubricant might get contaminated with Foreign material or get blackened due to overheating in such cases. Oil chamber should be flushed and filled with fresh oil before filling. Heat the oil to 140 degree C and cool it to 60 degree C for removal of moister in oil. | 122 | 3 | Nos |
| 13 | 5 | COOKING RANGE HOT PLATE | 123 | ||
| 14 | 5.1 | Overhaul Equipment Completely And Do As Mentioned Below\n(a) Change the Element if Defective\n(b) Renew the Internal Wiring if Perished\n(c) Check the Rotary Switches Changes with New One if\n(d) Calibrate Temperature Sensors And Temperature Gauge if Fitted\n(e) Check Temperature cut out of Water Heater For Satisfactory Operation and Adjust as Required\n | 124 | 1 | Job |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.