| 1 | 1 | M.S Pipe Line | | 1 | Per.in.dia/ ft.length |
|---|
| 2 | 2 | Dismantling of pipe lines 1” to 3’’ | | 1 | Per.in.dia/ ft.length |
|---|
| 3 | 3 | do 4’’to 11’’ | | 1 | Per.in.dia/ ft.length |
|---|
| 4 | 4 | do 12” to 20” | | 1 | Per.in.dia/ ft.length |
|---|
| 5 | 5 | do 21’’to 48’’ | | 1 | Per.in.dia/ ft.length |
|---|
| 6 | 6 | M.S Pipe Line | | 1 | Per.in.dia/ ft.length |
|---|
| 7 | 7 | Erection of pipe line from 1” to 3” dia | | 1 | Per.in.dia/ ft.length |
|---|
| 8 | 8 | do 4” to 11” | | 1 | Per.in.dia/ ft.length |
|---|
| 9 | 9 | do 12 to 20 | | 1 | Per.in.dia/ ft.length |
|---|
| 10 | 10 | do 21 to 48 | | 1 | Per.in.dia/ ft.length |
|---|
| 11 | 11 | Fabrication of pipe line from 12”above | | 1 | Per.in.dia/ ft.length |
|---|
| 12 | 12 | Flanges and blind up to 48” | | 1 | Per inch dia/pc |
|---|
| 13 | 13 | dismantling of flanges/blind | | 1 | Per inch dia/pc |
|---|
| 14 | 14 | refitting of old/new flanges/blind | | 1 | Per inch dia/pc |
|---|
| 15 | 15 | fabrication of flanges blind from M.S. plate | | 1 | Per inch dia/pc |
|---|
| 16 | 16 | Bends, reducers and nipples (up to 1’’ to 12’’) | | 1 | Per inch dia/pc |
|---|
| 17 | 17 | Dismantling | | 1 | Per inch dia/pc |
|---|
| 18 | 18 | fabrication | | 1 | Per inch dia/pc |
|---|
| 19 | 19 | fitting | | 1 | Per inch dia/pc |
|---|
| 20 | 20 | Bends, reducers and nipples (above 12’’) | | 1 | Per inch dia/pc |
|---|
| 21 | 21 | Dismantling | | 1 | Per inch dia/pc |
|---|
| 22 | 22 | fabrication | | 1 | Per inch dia/pc |
|---|
| 23 | 23 | fitting | | 1 | Per inch dia/pc |
|---|
| 24 | 24 | Dismantling , fab. and erection of M.S. / G.l pipe \nAccessories ( Tee, cross,distance piece up to 12’’) \n | | 1 | Per inch dia/pc |
|---|
| 25 | 25 | Dismantling | | 1 | Per inch dia/pc |
|---|
| 26 | 26 | Fabrication | | 1 | Per inch dia/pc |
|---|
| 27 | 27 | Erection | | 1 | Per inch dia/pc |
|---|
| 28 | 28 | Dismantling , fab. and erection of M.S. / G.l pipe Accessories ( Tee,cross, distance piece above 12’’) \n | | 1 | Per inch dia/pc |
|---|
| 29 | 29 | Dismantling | | 1 | Per inch dia/pc |
|---|
| 30 | 30 | Fabrication | | 1 | Per inch dia/pc |
|---|
| 31 | 31 | Erection | | 1 | Per inch dia/pc |
|---|
| 32 | 32 | Dismantling , fab. and erection of M.S. tanks/vassals from M.S plate, angle M.S channel 'I' section etc ( up to 6 mm plates)\n | | 1 | L.S. /pc |
|---|
| 33 | 33 | Dismantling | | 1 | P MT |
|---|
| 34 | 34 | Fabrication | | 1 | P MT |
|---|
| 35 | 35 | Erection | | 1 | P MT |
|---|
| 36 | 36 | Dismantling, Fab. and Erection of M.S. plate jobs \n boiler ducting boiler casing etc.) above 6 mm plate\n | | 1 | P MT |
|---|
| 37 | 37 | Dismantling | | 1 | P MT |
|---|
| 38 | 38 | Fabrication | | 1 | P MT |
|---|
| 39 | 39 | Erection | | 1 | P MT |
|---|
| 40 | 40 | Dismantling and Erection of railing \nDismantling | | 1 | Per.in.dia/ ft.lth |
|---|
| 41 | 41 | Fabrication | | 1 | Per.in.dia/ ft.lth |
|---|
| 42 | 42 | Erection | | 1 | Per.in.dia/ ft.lth |
|---|
| 43 | 43 | Valves | | 1 | Per inch dia/pc |
|---|
| 44 | 44 | Dismantling 1’’ to 6’’ | | 1 | Per inch dia/pc |
|---|
| 45 | 45 | Dismantling 7’’ to 12’’ | | 1 | Per inch dia/pc |
|---|
| 46 | 46 | Dismantling above 12’’ size | | 1 | Per inch dia/pc |
|---|
| 47 | 47 | fitting 1’’ to 6’’ | | 1 | Per inch dia/pc |
|---|
| 48 | 48 | fitting 7’’ to 12’’ | | 1 | Per inch dia/pc |
|---|
| 49 | 49 | fitting above 12’’ size | | 1 | Per inch dia/pc |
|---|
| 50 | 50 | S.S Pipe Line | | 1 | Per inch dia / ft. length |
|---|
| 51 | 51 | Dismantling of all size | | 1 | Per inch dia /ft. length |
|---|
| 52 | 52 | Erection all size | | 1 | Per inch dia /ft. length |
|---|
| 53 | 53 | Dismantling,fab., and erection of S.S.pipe Accessories\n(tee,cross,distance piece,nipples reducer and bend) up to 12” \nDismantling | | 1 | Per inch dia/pc |
|---|
| 54 | 54 | Fabrication | | 1 | Per inch dia/pc |
|---|
| 55 | 55 | Erection | | 1 | Per inch dia/pc |
|---|
| 56 | 56 | Patch Work on tank and pipe \n(M S plate cutting, fitting and welding, 02 round welding) \n | | 1 | Per sq. mtr. |
|---|
| 57 | 57 | Dismantling , Fabrication and Erection of cone of \nbigger size will be treated\n Dismantling \n | | 1 | Per inch dia /mtr. lth. |
|---|
| 58 | 58 | Fabrication | | 1 | Per inch dia / mtr. lth. |
|---|
| 59 | 59 | Erection | | 1 | Per inch dia / mtr. lth. |
|---|
| 60 | 60 | Fabrication and Erection of gutter of any size by \nRequired thickness (bigger size will be treat as dia) \n | | 1 | per cross sectional area \nper mtr running length\n |
|---|
| 61 | 61 | Dismantling , fabrication and erection of 3 Nos. hood \nof cutter ,chopper and leveler by 8/6 mm M.S. plate\n | | 1 | L.S. per hood |
|---|
| 62 | 62 | Dismantling , Fabrication and erection of old feed pipe line \nFeed pump to boiler\n | | 1 | Per in. dia./mtr.length |
|---|
| 63 | 63 | Dismantling of old and erection of new I D Fan\n taper cone. | | 1 | L.S. / Unit |
|---|
| 64 | 64 | Dismantling , Fabrication and erection of old ducting from I.D. fan inlet damper to I D Fan .\n | | 1 | L.S. / Unit |
|---|
| 65 | 65 | Dismantling , Fabrication and erection of flue gas \nducting size 5’ x 5’ \n | | 1 | L.S./Unit |
|---|
| 66 | 66 | Dismantling , fabrication and erection of I.D.. fan casing \nform 8 to 10mm M.S plate .\n | | 1 | L.S. / Unit |
|---|
| 67 | 67 | Dismantling , fabrication and erection of I.D. Fan \noutlet damper | | 1 | L.S. /Unit |
|---|
| 68 | 68 | Dismantling , fabrication and erection of I.D. \nFan inlet damper | | 1 | L.S. /Unit |
|---|
| 69 | 69 | Dismantling ,fabrication and Erection of Bagasse \nelevator, bagasse carrier and RBC bottom and side \nplate worn out portion \n | | 1 | Per sq.mtr. |
|---|
| 70 | 70 | Dismantling , fabrication and erection of Boiler bagasse feeding Chute by 8/6 mm M.S. plate. \n | | 1 | L.S. /Unit |
|---|
| 71 | 71 | Dismantling , erection and fabrication of umbrella of pan. | | 1 | L.S./Per pc. |
|---|
| 72 | 72 | Dismantling , fabrication and erection of save all of Quad body. \nDismantling | | 1 | L.S.// Unit |
|---|
| 73 | 73 | Fabrication | | 1 | L.S./ Unit |
|---|
| 74 | 74 | Erection | | 1 | L.S. / Unit |
|---|
| 75 | 75 | Dismantling , Fabrication and Erection of save all of pan. \nDismantling | | 1 | L.S. / Unit |
|---|
| 76 | 76 | Fabrication | | 1 | L.S./ Unit |
|---|
| 77 | 77 | Erection | | 1 | L.S./ Unit |
|---|
| 78 | 78 | Stair case( fab. with chaquered plate /old plate and pipe line) \nDismantling | | 1 | Per ft width |
|---|
| 79 | 79 | Fabrication | | 1 | Per ft width |
|---|
| 80 | 80 | Erection | | 1 | Per ft width |
|---|
| 81 | 81 | Dismantling and erection of pump up to 4’’ and 15 hp motor Shifting of pump / motor more than 20 mtr distance \n | | 1 | per inch suction/hp |
|---|
| 82 | 82 | Dismantling | | 1 | per inch suction/hp |
|---|
| 83 | 83 | Erection | | 1 | per inch suction/hp |
|---|
| 84 | 84 | Dismantling and erection of pump more than 4” and \n15 H.P motor Shifting of pump / motor more than \n20 mtr distance | | 1 | per inch suction/hp |
|---|
| 85 | 85 | Dismantling | | 1 | per inch suction/hp |
|---|
| 86 | 86 | Erection ( pump / motor) | | 1 | per inch suction/hp |
|---|
| 87 | 87 | Ammonia and gas coils\n ( Dismantling , fab. and erection) | | 1 | Per inch dia /mtr. lth. |
|---|
| 88 | 88 | Dismantling | | 1 | Per inch dia / mtr.lth. |
|---|
| 89 | 89 | Fabrication | | 1 | Per inch dia /mtr.lth. |
|---|
| 90 | 90 | Erection | | 1 | Per inch dia /mtr.lth. |
|---|
| 91 | 91 | Dismantling , fabrication and erection of new plate form as Per requirement from old M S plate 6 mm to 8 mm thickness. up to 2 sqm \nDismantling | | 1 | per sq.mtr. |
|---|
| 92 | 92 | Fabrication | | 1 | per sq.mtr. |
|---|
| 93 | 93 | Erection | | 1 | per sq.mtr |
|---|
| 94 | 94 | Dismantling , fabrication, and erection of new \n Plate from by M S/ chequared plate more than 2 sqmtr\nDismantling | | 1 | P M T |
|---|
| 95 | 95 | Fabrication | | 1 | P M T |
|---|
| 96 | 96 | Erection | | 1 | P M T |
|---|
| 97 | 97 | Crystallizer Coils \nDismantling | | 1 | Per inch dia /mtr.lth |
|---|
| 98 | 98 | Fabrication | | 1 | Per inch dia /mtr. lth |
|---|
| 99 | 99 | Erection | | 1 | Per inch dia /mtr. lth |
|---|
| 100 | 100 | Old and worn out staging , plate farm tank, vassals. \nDismantling | | 1 | P M T |
|---|
| 101 | 101 | Fabrication | | 1 | P M T |
|---|
| 102 | 102 | Erection | | 1 | P M T |
|---|
| 103 | 103 | Repairing of rubber seated exhaust /vapor valve \n above 16 “ | | 1 | Per in. dia.Per pc |
|---|
| 104 | 104 | Dismantling , fabrication and erection of side plate of cane kicker cutter, leveler, and chopper by 8/6 mm M.S. plate\n | | 1 | Per.sq.mtr |
|---|
| 105 | 105 | Dismantling , fabrication and erection of mill juice tray by 8 mm/10 mm M.S plate \n | | 1 | L.S.per mill tray |
|---|
| 106 | 106 | Dismantling of existing cane carrier chute and \nfabrication and erection of 8 to 10 mm M.S plate | | 1 | L.S. Unit |
|---|
| 107 | 107 | Repairing of steam jacket for sulphur furnace | | 1 | Per pc |
|---|
| 108 | 108 | Replacement of steam jacket of evaporator bodies | | 1 | L.S. per body |
|---|
| 109 | 109 | Strengthening of vapour line above 16” by inner and \nouter side/ring of angle/pipes \n | | 1 | Per pc |
|---|
| 110 | 110 | Dismantling , fabrication and erection of support angle,pipe, channel at any equipment \n | | 1 | per running\n mtr.length\n |
|---|
| 111 | 111 | Hopper centre piece by 12 mm plate | | 1 | L.S./Pc |
|---|
| 112 | 112 | Dismantling | | 1 | L.S./pc |
|---|
| 113 | 113 | Fabrication | | 1 | L.S./pc |
|---|
| 114 | 114 | Erection | | 1 | L.S./pc |
|---|
| 115 | 115 | Hopper tray \nDismantling | | 1 | Per. Sq. mtr. |
|---|
| 116 | 116 | Fabrication | | 1 | Per. Sq. mtr. |
|---|
| 117 | 117 | Erection | | 1 | Per. Sq. mtr. |
|---|
| 118 | 118 | Sulphur Furnace cooler dismantling ,fab. and \nerection work | | 1 | L.S/pc |
|---|
| 119 | 119 | Sulphur Furnace scrubber dismantling , fabrication\n and erection work \n | | 1 | L.S/pc |
|---|
| 120 | 120 | ‘B’ Vacuum crystallizer shell to be changed from\n 10 MM M.S. plate \n | | 1 | L.S. |
|---|
| 121 | 121 | ‘C, Vacuum crystallizer shell to be changed from 10 \nMM M.S. plate \n | | 1 | L.S. |
|---|
| 122 | 122 | Dismantling of RCC plate form of Sulpher Furnace \nwith shifting of waste \nmaterial complete in all respects and strengthening the same with all column and M.S. beams\n | | 1 | L.S/S.F |
|---|
| 123 | 123 | Strengthening of factory columns of various size by \n10 mm M.S.Plate angle channels etc. | | 1 | per running mtr. |
|---|
| 124 | 124 | Strengthening of factory beams of any size by M.S.plate angle channel I. Section etc. | | 1 | per running mtr. |
|---|
| 125 | 125 | Chipping ,cleaning and painting of columns and beams \nor staging of factory machinery.\n | | 1 | per mtr. |
|---|
| 126 | 126 | Painting one coat with ready mixed paint in factory \nbuilding M.S. column ( 25 mtr approx. height. and \n15-5 mtr height approx) And M.S trusses including \nrubbing down old ( if required at site.All the bracing \nand purlins are included with this work. | | 1 | Per.mtr. |
|---|
| 127 | 127 | Dismantling, Fabrication and erection of any size\nfactory/Building,columns beams and trusses | | 1 | L.S /unit |
|---|
| 128 | 128 | Dismantling ,Fabrication and erection of worn out \nWater pipes, nozzles, drain box etc. | | 1 | L.S |
|---|
| 129 | 129 | Dismantling ,Fabrication and erection of worn out shell\n of both wet Scrubber \n | | 1 | L.S |
|---|
| 130 | 130 | Dismantling, Fabrication and erection of worn out \ninternal of both wet Scrubber | | 1 | L.S |
|---|
| 131 | 131 | Dismantling, Fabrication and erection of worn flue gas \nducting Size 5’ x5’of both Wet Scrubber from damper to \nchimney \n | | 1 | per sq mtr. |
|---|
| 132 | 132 | Replacement of worn out portion of supports of \nmolasses tank roof. | | 1 | per sq.mtr. |
|---|
| 133 | 133 | Replacement of worn out portion of roof of \nmolasses tank | | 1 | per sq.mtr. |
|---|
| 134 | 134 | Dismantling of Boiler exit flue gas damper | | 1 | L.S |
|---|
| 135 | 135 | Dismantling, and erection of Boiler I.D., F.D. \nFan impeller | | 1 | L.S |
|---|
| 136 | 136 | Fabrication and erection of 06 Nos. M.S. column below\n sulpher furnace plate form and raising of same up to\n required height. | | 1 | L.S |
|---|
| 137 | 137 | Replacement of weak portion of molasses tank up to a\n height of 10 mtr by 6 mm,8 mm,10 mm plate etc.\n \n | | 1 | per mtr. |
|---|
| 138 | 138 | Providing roof above molasses khacha pit by M.S./CGI\n sheets with Proper columns, staging and tresses | | 1 | per mtr. |
|---|
| 139 | 139 | Dismantling and assembling of air heater outlet ducting | | 1 | L.S/unit |
|---|
| 140 | 140 | Dismantling of worn out Air Heater tubes | | 1 | Per tube |
|---|
| 141 | 141 | Replacement of worn out Air Heater tubes. | | 1 | Per tube |
|---|
| 142 | 142 | Dismantling , fabrication, erection of worn out both\nboiler blow down line boiler to drain pit.\n | | 1 | per.in dia/ft |
|---|
| 143 | 143 | Dismantling, fabrication, erection of worn out of 2 nos.\n5” long bend of feed water line header\n | | 1 | L.S/unit |
|---|
| 144 | 144 | Removal of hanging old lagging and fixing of new glass wool, plastered by P.O.P or hasean cloth and covered wire netting (murga jali) without material Up to 75 mm thickness\n | | 1 | per sq.ft |
|---|
| 145 | 145 | Replacement of juice heater partition plate in all \nrespects | | 1 | per juice heater |
|---|
| 146 | 146 | Pan No.1 top cone replacement work. | | 1 | L.S |
|---|
| 147 | 147 | Reconditioning of worn out 02 Nos. J.H. ( 04 Nos covers)Juice Heater grooves with respect to its top/bottom mating at outside cover\n | | 1 | per juice heater |
|---|
| 148 | 148 | Dismantling and erection of 6\" dia C.I. cross. | | 1 | L.S |
|---|
| 149 | 149 | Fabrication of 6\" dia C.I. cross | | 1 | L.S |
|---|
| 150 | 150 | Dismantling , fabrication, erection of 10' x 20 ' vacuum\n filter mud tray\n | | 1 | L.S |
|---|
| 151 | 151 | Dismantling of worn out body shell of pan no. 6 | | 1 | L.S |
|---|
| 152 | 152 | Fabrication and erection of body shell pan no. 6 | | 1 | L.S |
|---|
| 153 | 153 | Dismantling , fabrication, erection of 8' x 16 ' vacuum \nfilter mud tray\n | | 1 | L.S |
|---|
| 154 | 154 | Juice heater no. 1 both covers to be dismantle and erection \nafter machining work at both shafts. | | 1 | L.S |
|---|
| 155 | 155 | Dismantling of worn out bottom and fabrication and erection of new bottom of Crystlizer no. 3,4,9 10 and 11 entrainment catcher of pan | | 1 | L.S/unit |
|---|
| 156 | 156 | Dismantling, Fabrication and erection of M.S band 12” to 20” | | 1 | L.S |
|---|
| 157 | 157 | Dismantling, Fabrication and erection of M.S band 21” to 40” | | 1 | L.S |
|---|
| 158 | 158 | Dismantling of evaporator (quad) spare body S.S. tubes | | 1 | L.S |
|---|
| 159 | 159 | Re-tubing of evaporator (quad) spare body | | 1 | L.S |
|---|
| 160 | 160 | Dismantling of VC-1100 m3 S.S. tubes | | 1 | L.S/unit |
|---|
| 161 | 161 | Re-tubing of VC-1100 m3 S.S. tubes | | 1 | L.S |
|---|
| 162 | 162 | Increasing the length of hydraulic grab fingers | | 1 | L.S/unit |
|---|
| 163 | 163 | Dismantling , fabrication, erection of kicker drum \nwith holder assembly | | 1 | L.S |
|---|
| 164 | 164 | Dismantling , erection commission of pan discharge valve \nof pan no 5 and 6 | | 1 | L.S/unit |
|---|
| 165 | 165 | Modification of mill Kush Kush Conveyor | | 1 | L.S |
|---|
| 166 | 166 | Fabrication of staging of C/F machine NK 1100 and erection and commission of C/F machine NK 1100 2 Nos | | 1 | L.S |
|---|
| 167 | 167 | Fabrication, erection of new juice door filtration system | | 1 | L.S/unit |
|---|
| 168 | 168 | Dismantling , fabrication, erection of flocculating chamber top\n and bottom plate of door | | 1 | Per running mtr. |
|---|
| 169 | 169 | Crystallizer spiral ribbon strip has to dismantle and Again set right fitting. \nWorn out arms and other related Work also to be done | | 1 | L.S |
|---|
| 170 | 170 | Dismantling , fabrication, erection of worn out runner of cane carrier/bagasse elevator/ RBC/MBC\n | | 1 | L.S |
|---|
| 171 | 171 | Dismantling, Fabrication and Erection of agitator of vacuum filter | | 1 | L.S |
|---|
| 172 | 172 | Dismantling , fabrication, erection of worn out portion \nof D.S.M. screen | | 1 | L.S/unit |
|---|
| 173 | 173 | Fabrication, erection of I.D fan cone ring with flange | | 1 | L.S |
|---|
| 174 | 174 | Erection and commissioning of B- messcutte C/F machine including machine structure ,leveling of machine and related work to be done in all respect of M/C | | 1 | L.S |
|---|
| 175 | 175 | Dismantling of old worn out and fabrication, erection of \nnew juice sulphitor internal drum | | 1 | L.S/cutter/kicker/\nleveler |
|---|
| 176 | 176 | Juice ring fabrication by 6mm plate for mill rollers | | 1 | Per mtr running \nlength |
|---|
| 177 | 177 | Hinge type cover fabrication at copper, leveler and cutter | | 1 | L.S |
|---|
| 178 | 178 | Boilers No.2 6” live steam line from Boiler No.2 to main steam distributer to be modified\n | | 1 | L.S |
|---|
| 179 | 179 | Both Boilers 4” dia main blow down line from chimney to pit replacement work\n | | 1 | Per day |
|---|
| 180 | 180 | Boiler feed tank replacement | | 1 | Per day |
|---|
| 181 | 181 | All Bagasse chute of both boilers to be modified | | 1 | Per day |
|---|
| 182 | 182 | Rack and pinion to be fitted in MBC at Bagasse loading chute | | 1 | Per day |
|---|
| 183 | 183 | Labour supply ( per day 8 hr. basis)\na) Turner/Mechinist\nb) Fitter\nc) Welder\nd) Helper\ne) Khalasi\n | | 1 | Per day |
|---|
| 184 | 184 | Dismantling, Fab. & Erection of widening work of MBC\nby 250 MM of existing columns approx. total turf length=125 M\n | | 1 | Per running \nmeter length |
|---|
| 185 | 185 | Dismantling, Fab. & Erection of tail end shaft, idler shaft and\ndriving shaft with plumber blocks & driving unit etc for MBC &\ncane carrier. (5 Nos shaft for MBC) \n | | 1 | L.S |
|---|
| 186 | 186 | Dismantling, Fab. & Erection of cane carrier \n02 Nos. shaft | | 1 | L.S |
|---|