| 1 | 1 | Contract Jobs of Dismentaling, Fabrication and Erection | t1 | | |
|---|
| 2 | 2 | Dismentling of M.S. Pipe, 1: to 12\" dia | t2 | 1 | PER INCH DIA FT |
|---|
| 3 | 3 | Erection of M.S. Pipe 1\" to 12\" dia | t3 | 1 | PER INCH DIA FT |
|---|
| 4 | 4 | Fabrication of M.S. Pipe Line above 12\" dia from M.S. Plate | t4 | 1 | PER INCH DIA FT |
|---|
| 5 | 5 | Dismentling of M.S. Pipe Line above 12\" dia | t5 | 1 | PER INCH DIA FT |
|---|
| 6 | 6 | Erection of M.S. Pipe Line above 12\" dia | t6 | 1 | PER INCH DIA FT |
|---|
| 7 | 7 | Fabrication of S.S. Pipe Line 6\" to 24\" dia from S.S.plate | t7 | 1 | PER INCH DIA FT |
|---|
| 8 | 8 | Dismentling of S.S. Pipe Line 6\" to 24\" dia | t8 | 1 | PER INCH DIA FT |
|---|
| 9 | 9 | Erection of S.S. Pipe Line 6\" to 24\" dia from S.S. Plate | t9 | 1 | PER INCH DIA FT |
|---|
| 10 | 10 | Dismentling of Nipple 1\" to 12\" dia | t10 | 1 | PER INCH DIA |
|---|
| 11 | 11 | Fabrication of Nipple 1\" to 12\" dia | t11 | 1 | PER INCH DIA |
|---|
| 12 | 12 | Erection of Nipple 1\" to 12\" dia | t12 | 1 | PER INCH DIA |
|---|
| 13 | 13 | Dismentling of Nipple above 12\" dia | t13 | 1 | PER INCH DIA |
|---|
| 14 | 14 | Fabrication of Nipple above 12\" dia | t14 | 1 | PER INCH DIA |
|---|
| 15 | 15 | Erection of Nipple abvoe 12\" dia | t15 | 1 | PER INCH DIA |
|---|
| 16 | 16 | Dismentling of Bend 1\" to 12\" dia | t16 | 1 | PER INCH DIA |
|---|
| 17 | 17 | Fabrication of Bend 1\" to 12\" dia | t17 | 1 | PER INCH DIA |
|---|
| 18 | 18 | Erection of Bend 1\" to 12\" dia | t18 | 1 | PER INCH DIA |
|---|
| 19 | 19 | Dismentling, Farbication and Erection of Bend above 12\" dia | t19 | 1 | PER INCH DIA |
|---|
| 20 | 20 | Dismentling of Reducer/Tee 1\" to 12\" dia | t20 | 1 | PER INCH DIA |
|---|
| 21 | 21 | Fabrication and erection of Reducer/Tee 1\" to 12\" dia | t21 | 1 | PER INCH DIA |
|---|
| 22 | 22 | Dismentling of Valve 1\" to 12\" dia | t22 | 1 | PER INCH DIA |
|---|
| 23 | 23 | Erection of Valve 1\" to 12\" dia | t23 | 1 | PER INCH DIA |
|---|
| 24 | 24 | Dismentling of Valve above 12\" dia | t24 | 1 | PER INCH DIA |
|---|
| 25 | 25 | Erection of Valve above 12\" dia | t25 | 1 | PER INCH DIA |
|---|
| 26 | 26 | Cutting and fitting of Old Flanged/blind 1\" and above | t26 | 1 | PER INCH DIA |
|---|
| 27 | 27 | Dismantling fabrication and Erection of plateform | t27 | 1 | PER sqft |
|---|
| 28 | 28 | Dismantling fabrication and Erection of Railing | t28 | 1 | RFT |
|---|
| 29 | 29 | Replacement of Worn out Bottom plate of Molasses/Syrup Storage Tank 4 sq mtr area approx | t29 | 1 | LUMPSUM/TANK |
|---|
| 30 | 30 | Fabrication of Vapour Pipe Bend 36\" to 40\" dia | t30 | 1 | LUMPSUM each |
|---|
| 31 | 31 | Dismentling and Erection of Vapour Pipe Bend 36\" to 40\" dia | t31 | 1 | LUMPSUM each |
|---|
| 32 | 32 | Dismentling Fabrication and Erection of Complete Umbrella of Quad Body | t32 | 1 | LUMPSUM each |
|---|
| 33 | 33 | Dismentling Fabrication and Erection of Complete Umbrella of Pan | t33 | 1 | LUMPSUM each |
|---|
| 34 | 34 | Dismentling Fabrication and erection of Strainers | t34 | 1 | LUMPSUM each |
|---|
| 35 | 35 | Dismentling Fabrication and erection of foundation bed of any type of pumps | t35 | 1 | LUMPSUM each |
|---|
| 36 | 36 | Dismentling of vapour pipe 900 mm / 1000 mm dia | t36 | 1 | PMT |
|---|
| 37 | 37 | Fabrication of vapour pipe 900mm/1000mm dia | t37 | 1 | PMT |
|---|
| 38 | 38 | Erection of vapour pipe 900/1000 mm dia | t38 | 1 | PMT |
|---|
| 39 | 39 | Dismentling Fabrication and Erection of Save all of pans/quads from 8mm to 12mm M.S. Plate | t39 | 1 | LUMPSUM each |
|---|
| 40 | 40 | Dismentling Fabrication and Erection of top cover of save all of Pan and quad | t40 | 1 | LUMPSUM each |
|---|
| 41 | 41 | Dismentling Fabrication and Erection of outer shell of save all of Pan and quad | t41 | 1 | LUMPSUM each |
|---|
| 42 | 42 | Dismentling Fabrication and Erection of inner portion of save all of pan and quad | t42 | 1 | LUMPSUM/TANK |
|---|
| 43 | 43 | Replacement of J-Pipe in vapour cell/Quad Body/Fan | t43 | 1 | per J pipe |
|---|
| 44 | 44 | Dismentling, Farbication and Erection of Rectangular coil of Molasses Tank | t44 | 1 | PER COIL |
|---|
| 45 | 45 | Patch work of save all of pan/ evaporator bodies | t45 | 1 | PER SQ FT |
|---|
| 46 | 46 | Patch work of Umbralla of Pan/ Evaporator Bodies | t46 | 1 | PER SQ FT |
|---|
| 47 | 47 | Stengthing of Umbrella of Pan/ Evaporator Bodies | t47 | 1 | LUMPSUM each |
|---|
| 48 | 48 | Dismentling Fabrication and Erection of complete broken arms of dry seed crystallizer of similar other crystallizers | t48 | 1 | LUMPSUM each |
|---|
| 49 | 49 | Dismentling Fabrication and Erection of wornout shaft of crystallizer | t49 | 1 | LUMPSUM each |
|---|
| 50 | 50 | Fabrication and Erection of Distributor in down take of Pans | t50 | 1 | LUMPSUM EACH |
|---|
| 51 | 51 | Replacement of Bottom compartment Grooves for fitting of rubber strips of juice heaters H.S.A 120m2 | t51 | 1 | Rate/Running Feet |
|---|
| 52 | 52 | Erection of Super heater at centrifugal machine with all existing connections | t52 | 1 | LUMPSUM each |
|---|
| 53 | 53 | Dismentling Erection of Transient heater with all existing connections | t53 | 1 | LUMPSUM EACH |
|---|
| 54 | 54 | Dismantling fabrication and Erection of injection header size800mm dia 16m long with 10mm plate | t54 | 1 | LUPSUM EACH |
|---|
| 55 | 55 | Dismantling of Pan body shell from Calendria to top cone (40 Ton) capacity | t55 | 1 | LUMPSUM each |
|---|
| 56 | 56 | Fabrication and Erection of pan body shell from Calendria to top cone (40 Ton) capacity | t56 | 1 | LUMPSUM each |
|---|
| 57 | 57 | Dismentling, Fabrication and Erection of Top cone of pans | t57 | 1 | LUMPSUM each |
|---|
| 58 | 58 | Replacement of Flat/runner side plates MS railing & square bar etc. | t58 | 1 | Per mtr length |
|---|
| 59 | 59 | Replacement of runner along with supporting angle/ channel for Cane Carrier chain/ RBC/ inter carrier chain | t59 | 1 | Rate per MTR length |
|---|
| 60 | 60 | Dismantling Fabrication Erection of MS plate of cane carrier side plates with supports | t60 | 1 | Rate per sq. meter area |
|---|
| 61 | 61 | Fabrication & Fitting of platform from old scrap material | t61 | 1 | Rate per sq. feet |
|---|
| 62 | 62 | Dismantling & erection of IBR pipeline above 6\" Dia | t62 | 1 | Rate per inch dia per feet |
|---|
| 63 | 63 | Dismantling and erection of IBR valve upto 6” dia | t63 | 1 | Rate per inch dia per feet |
|---|
| 64 | 64 | Dismantling & erection of IBR bends / reducers /nipple Upto 6” dia | t64 | 1 | Rate per inch dia |
|---|
| 65 | 65 | Dismantling and erection of IBR valve upto 6” dia | t65 | 1 | Rate per inch dia |
|---|
| 66 | 66 | Fabrication and Erection of Flanged end Observation / Cleaning doors for Economiser of Boiler no. 2 | t66 | 1 | LUMPSUM job |
|---|
| 67 | 67 | Dismantling, Fabrication , Erection of Boiler no.2 ID fan suction bend of flue gas ducting | t67 | 1 | LUMPSUM job |
|---|
| 68 | 68 | Patchwork of Wet Scrubber casing / Ducting / bottom cone /Clarifier | t68 | 1 | Rate per sq feet |
|---|
| 69 | 69 | Dismantling, Fabrication Erection of FD hot air ducting above furnace area of Boiler no.2 with supports /Damper , size 16 inch sq. ,approx. length-50 feet | t69 | 1 | LUMPSUM EACH |
|---|
| 70 | 70 | Dismantling, Fabrication Erection of FD hot air ducting near Air Heater ash hopper of Boiler no. 1 and no.2 with fitting of supports /Damper | t70 | 1 | Lumpsum job |
|---|
| 71 | 71 | Replacement of RBC bottom trough plate etc. | t71 | 1 | Rate per running metre |
|---|
| 72 | 72 | Dismantling shifting refitting of ID fan no. 1 from outside to inside on old foundation | t72 | 1 | LUMPSUM job complete |
|---|
| 73 | 73 | Fabrication and fitting of ID fan suction bend for Boiler no.1 | t73 | 1 | LUMPSUM job |
|---|
| 74 | 74 | Dismantling and fitting of existing ID fan delivery duct from ID fan to wet scrubber along with supports etc for Boiler no.1 | t74 | 1 | LUMPSUM job |
|---|
| 75 | 75 | Patch work of outer front MS plate of chamber near bagasse feeder Boiler no. 1 and 2 | t75 | 1 | LUMPSUM job |
|---|
| 76 | 76 | Dismantling , Fabrication and erection of MS ducting from Wet scrubber outlet to chimney for boiler no. 2 | t76 | 1 | LUMPSUM job |
|---|
| 77 | 77 | Dismantling , Fabrication and erection of MS ducting one meter long at suction of Wet scrubber for boiler no. 2 | t77 | 1 | LUMPSUM job |
|---|
| 78 | 78 | Dismantling, cleaning, Testing, Painting and refitting of Gilled Type Economiser Elements. No. of elements are 48 no.'s. Hydraulic Test also to be done after fitting of all elements. | t78 | 1 | LUMPSUM Rate for complete job |
|---|
| 79 | 79 | Dismantling, Fabrication and erection of perforated plate of Wet scrubber for Boiler no.1 &2 | t79 | 1 | LUMPSUM Rate for complete job |
|---|
| 80 | 80 | Fabrication and Erection of Staircase at cane unloader along with railing, platform etc. | t80 | 1 | LUMPSUM Rate |
|---|
| 81 | 81 | Dismentling, Fabrication and Erection of broken arm/ribbon of any crystalizer | t81 | 1 | RATE PER ARM/RIBBON |
|---|
| 82 | 82 | Replacement of old brass/SS tubes of with new SS tubes of Second body of Quad by Dismantling, fitting and expansion of tubes, (Approx. quantity of Tubes : 1100 no.'s) Hydraulic testing after replacement of tubes | t82 | 1 | Rate per tube |
|---|
| 83 | 83 | Replacement of old brass/SS tubes of with new SS tubes of Quad/vapour cell (other than second body of Quod ) by Dismantling, fitting and expension of tubes | t83 | 1 | Rate per tube |
|---|
| 84 | 84 | Replacement of SS tube of Juice Heaters/ VLJH by Dismantling, fitting and expension of tubes | t84 | 1 | Rate per tube |
|---|
| 85 | 85 | Replacement of brass/SS tube of any Pan by Dismantling, fitting and expension of tubes | t85 | 1 | Rate per tube |
|---|