Road Transport and Highways Government Departments Closing in 0 days TDR #28389433

Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Mr , Stage-Ii . ( Wapcos ) Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Motor Road Stage-Ii With 5 Year Maintenance Under Pbmc

Issued by Government Departments · Mori, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Jul 2021
0 days left
EMD
17.67 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Rate Contract
Location / State
Mori → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Mr , Stage-Ii . ( Wapcos ) Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Motor Road Stage-Ii With 5 Year Maintenance Under Pbmc

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 05-Jul-2021 Corrigendum-01 BOQ 21-Jul-2021
2 19-Jul-2021 Corrigendum-02 Date 28-Jul-2021

BOQ

Name of Work: Construction of Kotgaon (Naitwar) to Kalap Motor Road Under PMGSY Phase-XVII (Length: 15.00 Km) (Stage-II) Cold Mix Technology With 05 Years Maintenance.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Maintenace During ConstructionItem1
22Removal of Land slides (Slip Clearence) Removal Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side complete as directed by the Engineer-in-charge.Item23645.83Cum
33Protection WorkItem3
44Excavation of Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing\nof sides and bottom and backfilling in trenches with excavated suitable material (R/W, B/W, Dry Scupper, Catchpit etc.)\n(For R/W and B/W)Item4388.6Cum
55Random rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for cross drainage structures, retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge.\n(For R/W and B/W)Item566Cum
66Random rubble stone masonry laid dry in breast walls, retaining walls, etc. including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification clauses 702,704,1202 & 1203.\n(For R/W and B/W)Item61381.08Cum
77Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)\n(For R/W and B/W)Item7269.56Cum
88Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@\n32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh\n(woven diagonally) including 10 per cent extra for laps and joints laid with stone\nboulders weighing not less than 25 kg each as per drawing and technical\nspecifications Clause 1301Item8168.75Cum
99Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications\nClause 802, 803, 1202 & 1203 of MORD SpecifictionItem9135Cum
1010Drainage WorkItem10
1111Side DrainItem11
1212Construction of Hill side Pucca KC Drain in accordance with the requirment of specification true to line and grades.s Dimensions and other particulars as per drawing including all material labour T&P. etc required for proper completion of the work as directed by engineer in charge.Item12
1313Excavation in foundationItem13122.5Cum
1414Stone masonary in RR1:5Item1483.5Cum
1515Cement plastyer 15 mm thick 1:4 on stone masonaryItem15412.5Sqm
1616Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.Item1614500Rm
1717Earthen Shoulder & Super ElevationItem17
1818Repairs of damages caused by rain/spillage of water Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1 (Extra for curve widening 10% of total quantity.)\nItem1864350Sqm
1919Excavation in Marshy Soil Excavation for roadway in marshy soil with hydraulic excavator 0.9 Cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per technical Specification Clause 302.3.6. (For making damage Super Elevation)Item191460.25Cum
2020Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (For Pattri filling)Item209900Cum
2121Construction of coolie walling including supply of all material, labour, T&P\netc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)Item211620Cum
2222Payment WorkItem22
2323Granular sub base/Base/Surface cource with local materials (Table 400.13) by mixin place method normal (construction of Granual sub base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavetor at once and complcting with smooth wheel roller to achieve the desired density completed as per clause 401.4 as per Technical specification clause 408.Item237952.63Cum
2424WBM Gradinjg 2 Providing, laying, spreading and compacting stone aggregate of specific sizes to water bond macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100KN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of course aggregate, eatering and compacting to the required density grading 2 as per technical specification clause 405, By mechanical meansItem244587.98Cum
2525WBM Grading 3 Providing and laying, spreading and compacting stone aggregate of specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of course aggregate, watering and compacting to the required density grading 3 as per MORD specification clause 405 by mechnical means.Item254590Cum
2626Prime Coat Medium Porosity Providing and applying Primer coat with low porosity with Bitumen emulsion (SS-1) complying with IS:8887 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.9+0-102 kg/sqm using mechanical means as per Technical Specification Clause 502.Item2661200Sqm
2727Tack Coat Providing and applying tack coat with Bitumen emulsion (Rapid setting RS-1 Grade complying with IS:8887) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503Item2761200Sqm
2828Pre-Mix Carpet Providing, laying and rolling of cold mixed open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2 mm aggregates using cationic bitumen emulsion( medium setting MS grade complying with IS:8887) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per MORD Specification Clause 506.2Item2861200Sqm
2929Seal Coat Providing and laying seal coat by Bitumen emulsion (SS-2) as for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 508Item2961200Sqm
3030Road FurnitureItem30
3131Kilometer stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703\nItem31
32325th Kilometre Stone (precast)Item323Nos
3333Ordinary Kilometer Stone (Precast)Item3312Nos
3434200 m stone (precast)Item3460Nos
3535Prioviding Edge Stones of Size 450x350x100 mm no valley side of formation as per drawing and technical specification clause 1608.2.6Item35150Nos
3636Construction of parapet in RR stone masonry laid in 1:5 C/S mortar & flush pointing in 1:3 C/S mortar as required and specified in detailed drawing with white wahing complete as per the direction of Engineer in charge.Item36
3737Excavation in foundation.Item378.1Cum
3838Construction of PCC-M10 in foundation.Item388.1Cum
3939Construction of RR 1:5Item3932.4Cum
4040Construction of Plaster 1:4Item40104.4Sqm
4141Providing 50mm thick M 20 architectural coping on top of wallItem4154Rm
4242Pointing in 1:3Item4272Sqm
4343Providing laying of white wash work as per drawing detailed.Item43230Sqm
4444Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 km distance of road length as per attached standard drawing duly painted and written and as directed by Engineer in charge. As per MORD specification Clause 1701Item447Nos
4545Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MORD specification Clause 1701.Item451Nos
4646Providing fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. Of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. As per MORD specificaion Clause 1701.Item462Nos
4747Providing & fixing of Maintenance Information Board with PMMGSY logo at starting or prominent location (where maimum no. Of citizens can view the details of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701.Item471Nos
4848Providing & fixing of Traffic Sign Boards cautionary, mandatory and informatory as per attached drawing and as per the MORD Specification and as derected by Engineer in charge.Item4840Nos
4949Other WorksItem49
5050Construction of Job Pillers of RR 1;6 stone masonary and Plastered with 1:4 Mortar, of length 400 mm, width 400 mm and height 600 mm of which 100 mm shall be below ground level as per fig. 1600.1 (d) and Technical Specification Clause 1602.4 of MORD specifications.Item502Nos
5151Emergency MaintenanceItem51
5252Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611Item52
5353Ist yearItem53900Cum
5454Iind yearItem54810Cum
5555IIIrd yearItem55729Cum
5656Ivth yearItem56656.1Cum
5757Vth yearItem57590.55Cum
5858Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of workItem58
5959Ist yearItem5930Hours
6060Iind yearItem6027Hours
6161IIIrd yearItem6124.3Hours
6262Ivth yearItem6221.9Hours
6363Vth yearItem6319.65Hours
6464Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301Item64
6565Ist yearItem6530Cum
6666Iind yearItem6627Cum
6767IIIrd yearItem6724.3Cum
6868Ivth yearItem6821.9Cum
6969Vth yearItem6919.65Cum
7070Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)Item70
7171Ist yearItem7145Cum
7272Iind yearItem7240.5Cum
7373IIIrd yearItem7336.45Cum
7474Ivth yearItem7432.85Cum
7575Vth yearItem7529.55Cum
7676Routine Maintenance- Under PBMCItem76
7777Maintenance under PBMC for \n1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. \n2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as well as catch water drains as per technical specification Clause 1907.\n3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 .\n4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908.\n5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. \n6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910.\n7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912.\n8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year).\n9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.\nItem77
7878Ist yearItem7815Km
7979Iind yearItem7915Km
8080IIIrd yearItem8015Km
8181Ivth yearItem8115Km
8282Vth yearItem8215Km

AI Tender Summary

OUR REF NO 28389433
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-07-2021
Authority
Authority Name Pradhan Mantri Gram Sadak Yojana
Work Description Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Mr , Stage-Ii . ( Wapcos ) Construction And Maintenance Of Kotgaon ( Naitwar ) To Kalap Motor Road Stage-Ii With 5 Year Maintenance Under Pbmc
Basic Detail
Tender No UT1347
Bidding Type Rate Contract
Location
City Mori
State Uttarakhand
Key Dates
Publish Date 19 Jul 2021
Submission Date 28 Jul 2021
Open Date 28 Jul 2021
Finance
Tender Value Ref. Documents
Tender Fee 5900
EMD 17.67 Lakhs
Exemption Not Available
Document List
C2AD4715-457A-40D0-8FAE-048CE14C9500.html
BOQ_180332.xls
Tendernotice_1.pdf
ModelSBDKotgaontoKalapII.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 19, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 21, 2021
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 28, 2021
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jul 28, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 28, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

C2AD4715-457A-40D0-8FAE-048CE14C9500.html

xls

BOQ_180332.xls

pdf

Tendernotice_1.pdf

pdf

ModelSBDKotgaontoKalapII.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders