| 1 | 1 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | BI01010001010000000000000515BI0100001113 | 48.96 | cum |
|---|
| 2 | 2 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. S.I. No-275 | BI01010001010000000000000515BI0100001114 | 14.99 | cum |
|---|
| 3 | 3 | M-150 brick work in 1:6 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work.S.I. No-303 | BI01010001010000000000000515BI0100001115 | 16.61 | cum |
|---|
| 4 | 4 | R.C.C. Work with cement approved Course sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C. T-Beam and slab roofs and RCC column , excluding its fixing and binding the same with 24 B.W.G.G.I. bindng wire and including necessary centring and shuttering etc. and also including supply of all materials required for proper completion of work. Binding wire to be supplied by the contractor free of cost .S.I. No-288 (b) | BI01010001010000000000000515BI0100001116 | 16.65 | cum |
|---|
| 5 | 5 | Mild steel or iron work in plain work such as in Reinforced Concrete or reinforced Brick work ( when not ic in overall rates) wrought to required shape as nessary ic bending for proper completion of the work and ic supply of steel its westage. Bend hooks and authorized overlapping shall be measured. S.I. No-504 | BI01010001010000000000000515BI0100001117 | 16.24 | qtl |
|---|
| 6 | 6 | M-150 brick work in 1:6 Cement and sand of 1.25 fineness modulous mortar in S/Structure including supply of all material, labour and T&P etc. required for proper completion of work.S.I. No-303+309+310 | BI01010001010000000000000515BI0100001118 | 26.63 | cum |
|---|
| 7 | 7 | 12mm thick plaster with 1:6 cement & F/sand of 1.25 FM minimum thickness not to be less than 10 mm I/C supply of all materials labour and T & P etc required for proper completion of work. SI No. 586 | BI01010001010000000000000515BI0100001119 | 378.25 | sqm |
|---|
| 8 | 8 | Finishing walls with Water proof cement paint of approved make and qualitity on new work with two coat give to an even shade including supply of all material labour and tools and plants etc. required for proper complition to the work . S.I. No-660+661 | BI01010001010000000000000515BI0100001120 | 378.25 | sqm |
|---|
| 9 | 9 | Mild steel or iron work in heavy sizes such as Trusses, built up gates, record racks, roof work, gates etc. wrought to required from ic drilling holes riveting or welding where necessary & their fixing reuired for proper completion of work. S.I. No-503 | BI01010001010000000000000515BI0100001121 | 7 | qtl |
|---|
| 10 | 10 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | BI01010001010000000000000515BI0100001122 | 13.87 | cum |
|---|
| 11 | 11 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. S.I. No-275 | BI01010001010000000000000515BI0100001123 | 3.62 | cum |
|---|
| 12 | 12 | R.C.C. Work with cement approved Course sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C. T-Beam and slab roofs and RCC column , excluding its fixing and binding the same with 24 B.W.G.G.I. bindng wire and including necessary centring and shuttering etc. and also including supply of all materials required for proper completion of work. Binding wire to be supplied by the contractor free of cost .S.I. No-288 (b) | BI01010001010000000000000515BI0100001124 | 4.63 | cum |
|---|
| 13 | 13 | M-150 brick work in 1:6 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-303 | BI01010001010000000000000515BI0100001125 | 4.21 | cum |
|---|
| 14 | 14 | RCC work with cement, course sand & 2 cm gauge stone ballast 1:2:4 in Plinth Band lintels of door & window excluding S/O reinforcement and its bending but I/C its fixing and binding the same with 24 BWG GI binding wire and I/C necessary centring and shuttering etc.& also I/C S/O all materials required for proper completion of work. SI No 283 | BI01010001010000000000000515BI0100001126 | 0.82 | cum |
|---|
| 15 | 15 | M-150 brick work in 1:6 Cement and sand of 1.25 fineness modulous mortar in S/Structure including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-303+309 | BI01010001010000000000000515BI0100001127 | 9.84 | cum |
|---|
| 16 | 16 | Earth work filling in plinth in Rooms By cartege up to 3 km distance I/C all material labour T&P proper complition to the work . As per Analysis | BI01010001010000000000000515BI0100001128 | 14.96 | cum |
|---|
| 17 | 17 | Cast cement concrete as in Lintel door sills, chaukhat boundary post as similar precast unit with cement, approved coarse sand and 20,, gauge approved stone ballast in the proportion of 1:2:4 (class-150) exluding supply of reinforcement and its bending but including its fixing in position and binding with 24 B.W.G.G.I binding wire and including necessary scentring and shuttering etc. and also including supply of all material, labour, T&P etc. required for proper completion of work. Binding wire to be supplied by the contractor free of cost S.I. No-283 | BI01010001010000000000000515BI0100001129 | 0.7 | cum |
|---|
| 18 | 18 | R.C.C. Work with cement approved Course sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Slab , excluding its fixing and binding the same with 24 B.W.G.G.I. bindng wire and including necessary centring and shuttering etc. and also including supply of all materials required for proper completion of work. Binding wire to be supplied by the contractor free of cost S.I.No-288(b) | BI01010001010000000000000515BI0100001130 | 4.01 | cum |
|---|
| 19 | 19 | Mild steel or iron work in plain work such as in Reinforced Concrete or reinforced Brick work ( when not ic in overall rates) wrought to required shape as nessary ic bending for proper completion of the work and ic supply of steel its westage. Bend hooks and authorized overlapping shall be measured. S.I. No-504 | BI01010001010000000000000515BI0100001131 | 9.97 | qtl |
|---|
| 20 | 20 | Fabrication and supply of t-iron 40 x 40 x 5 mm door/ window chaukha tframe ic cost of steel, all carriage welding cutting, lab our, grinding smooth finishing, staple plate 6mm thick welded in back flange at hinges cost of 14 gauge hinges for 100 & 75mm and 16 gauge hinges for 50mm. size ic all drilling, machine threading, all screws, nuts bolts, arrangement for locking of tower bolt, tie rod. hold fasts made of 25 x 3 mm. flat iron 15 cm long complete job ic applying of one coat of red oxide steel primer paint required for proper completion of work as per direction of ingineer-in-charge. standard weight or actual weight which ever is less shall be paid. Chp.10 N.S.1 | BI01010001010000000000000515BI0100001132 | 2.01 | qtl |
|---|
| 21 | 21 | Door | BI01010001010000000000000515BI0100001133 | 1 | Nos |
|---|
| 22 | 22 | Window | BI01010001010000000000000515BI0100001134 | 2 | Nos |
|---|
| 23 | 23 | Ventilater | BI01010001010000000000000515BI0100001135 | 2 | Nos |
|---|
| 24 | 24 | Supply And Fixing of Fulush Door shutter 32 mm thick I/C all material labour T&P proper complition to the work . S.I. No-470(c) | BI01010001010000000000000515BI0100001136 | 5.91 | sqm |
|---|
| 25 | 25 | 12mm thick plaster with 1:6 cement & F/sand of 1.25 FM minimum thickness not to be less than 10 mm I/C supply of all materials labour and T & P etc required for proper completion of work. SI No. 586 | BI01010001010000000000000515BI0100001137 | 107.34 | sqm |
|---|
| 26 | 26 | 12mm thick plaster with cement mortor 1:4 cement and fine sand of 1.25 FM minimum thickness not to be less than 10 mm I/C supply of all materials labour and T & P etc required for proper completion of work. SI No. 584 | BI01010001010000000000000515BI0100001138 | 3.37 | sqm |
|---|
| 27 | 27 | 5.0 cm thick 1:1.5:3 PCC floor with base conc. consisting of brick ballast, sand & cement 8:4:1 laid in panels finished with 3 mm floating coat of neat cement or cement & marble dust in ratio of 5:1 as specified & I/C 8cm thick base conc. above & removing any overlapping mortor at the joints of the panels if any & giving them a uniform finish I/C S/O all materials labour T&P etc required for proper completion of the work. SI No 604 | BI01010001010000000000000515BI0100001139 | 15.75 | Nos |
|---|
| 28 | 28 | Material 15A (v) Tower bolt 300 mm | BI01010001010000000000000515BI0100001140 | 4 | Nos |
|---|
| 29 | 29 | Material 15A (iii) 150 mm | BI01010001010000000000000515BI0100001141 | 24 | Nos |
|---|
| 30 | 30 | Material 15 C (ii) Handle 150 mm | BI01010001010000000000000515BI0100001142 | 24 | Nos |
|---|
| 31 | 31 | Material 15 B (iii) Sliding bolt 300 mm long | BI01010001010000000000000515BI0100001143 | 2 | Nos |
|---|
| 32 | 32 | Material 15 D Door stoper | BI01010001010000000000000515BI0100001144 | 2 | Nos |
|---|
| 33 | 33 | One coat of cement primer and one coat oil distemper on new work including supply of all materials labour and Tools and plants etc. Required for proper complition to the work. S.I. No-649+650 | BI01010001010000000000000515BI0100001145 | 62.37 | sqm |
|---|
| 34 | 34 | Finishing walls wiwth Water proof cement paint of approved make and qualitity on new work with two coat give to an even shade including supply of all material labour and tools and plants etc. required for proper complition to the work . S.I. No-660+661 | BI01010001010000000000000515BI0100001146 | 64.09 | sqm |
|---|
| 35 | 35 | Painting or varnishing new iron work in small area or new wood with two coat of redy mixed priming paint and two coat of aproved superior quality ready mix paint (2nd quality synthetic enamel paint of approved brand such as British paint shalimar,Ashian,or equivalant as approvedby E/I)or varnish including supply of all material labour ,T&P etc. required for proper complition to the work paint to be used confirm the I.S.I. No 103-1950 S.I.NO-641+642 (65+28.60) | BI01010001010000000000000515BI0100001147 | 13.34 | sqm |
|---|
| 36 | 36 | Providing and wiring of light point with 1.5 sq mm coper conductor in PVC conduit ,concealed in partly slab and partly wall . 131 (C) | BI01010001010000000000000515BI0100001148 | 3 | Nos |
|---|
| 37 | 37 | Providing and wiring of fan point with 1.5 sq mm coper conductor in PVC conduit ,concealed in partly slab and partly wall . 133 (C) | BI01010001010000000000000515BI0100001149 | 1 | pt |
|---|
| 38 | 38 | Same as item No 1 but for Pluge point . 134 (C) | BI01010001010000000000000515BI0100001150 | 1 | Nos |
|---|
| 39 | 39 | S/wiring of sub main with 2 No 4 sqm &1 No 2.5 sqmm FR PVC insulated copper conductor cable in 20 mm dia heavy gauge P.V.C conduit concealed in wall complete of work. 216 (C) | BI01010001010000000000000515BI0100001151 | 20 | Nos |
|---|
| 40 | 40 | Supply and fixing of 100W Bulb . M.R | BI01010001010000000000000515BI0100001152 | 1 | Nos |
|---|
| 41 | 41 | Supply and fixing of HPF box type 1x40 watt fluorescent tube light complete of work. S.I. No 453 | BI01010001010000000000000515BI0100001153 | 2 | Nos |
|---|
| 42 | 42 | supply and fixing of single light wall bracket fixed on matching M.D.F.E.G. board base etc. complit in all respects. S.I. No-412 | BI01010001010000000000000515BI0100001154 | 1 | Nos |
|---|
| 43 | 43 | Excavation in founadtion in ordinary soil (loamclay or sand) including lift up to 1.5 m and lead up to 30m. And including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m, from the foundation trenches including all T & P phowarah and basket etc. complete. S.I. No-251 | BI01010001010000000000000515BI0100001155 | 22.23 | cum |
|---|
| 44 | 44 | Concrete with 4cm. Gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. S.I. No-275 | BI01010001010000000000000515BI0100001156 | 3.4 | cum |
|---|
| 45 | 45 | R.C.C. Work with cement approved Course sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in R.C.C. T-Beam and slab roofs and RCC column , excluding its fixing and binding the same with 24 B.W.G.G.I. bindng wire and including necessary centring and shuttering etc. and also including supply of all materials required for proper completion of work. Binding wire to be supplied by the contractor free of cost .S.I. No-288 (b) | BI01010001010000000000000515BI0100001157 | 7.51 | cum |
|---|
| 46 | 46 | M-150 brick work in 1:6 Cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. S.I. No-303 | BI01010001010000000000000515BI0100001158 | 9.97 | cum |
|---|
| 47 | 47 | RCC work with cement, course sand & 2 cm gauge stone ballast 1:2:4 in Plinth Band lintels of door & window excluding S/O reinforcement and its bending but I/C its fixing and binding the same with 24 BWG GI binding wire and I/C necessary centring and shuttering etc.& also I/C S/O all materials required for proper completion of work. SI No 283 | BI01010001010000000000000515BI0100001159 | 1.91 | cum |
|---|
| 48 | 48 | Earth work filling in plinth in Rooms By cartege up to 3 km distance I/C all material labour T&P proper complition to the work . As per Analysis | BI01010001010000000000000515BI0100001160 | 47.03 | cum |
|---|
| 49 | 49 | R.C.C. Work with cement approved Course sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Slab , excluding its fixing and binding the same with 24 B.W.G.G.I. bindng wire and including necessary centring and shuttering etc. and also including supply of all materials required for proper completion of work. Binding wire to be supplied by the contractor free of cost S.I.No-288(b) | BI01010001010000000000000515BI0100001161 | 10.61 | cum |
|---|
| 50 | 50 | Mild steel or iron work in plain work such as in Reinforced Concrete or reinforced Brick work ( when not ic in overall rates) wrought to required shape as nessary ic bending for proper completion of the work and ic supply of steel its westage. Bend hooks and authorized overlapping shall be measured. S.I. No-504 | BI01010001010000000000000515BI0100001162 | 19.65 | qtl |
|---|
| 51 | 51 | 5.0 cm thick 1:1.5:3 PCC floor with base conc. consisting of brick ballast, sand & cement 8:4:1 laid in panels finished with 3 mm floating coat of neat cement or cement & marble dust in ratio of 5:1 as specified & I/C 8cm thick base conc. above & removing any overlapping mortor at the joints of the panels if any & giving them a uniform finish I/C S/O all materials labour T&P etc required for proper completion of the work. SI No 604 | BI01010001010000000000000515BI0100001163 | 49.5 | sqm |
|---|
| 52 | 52 | One coat of cement primer and one coat oil distemper on new work including supply of all materials labour and Tools and plants etc. Required for proper complition to the work. S.I. No-649+650 | BI01010001010000000000000515BI0100001164 | 49.5 | sqm |
|---|
| 53 | 53 | S/ Fixing of information signboard | BI01010001010000000000000515BI0100001165 | 1 | Nos |
|---|