| 1 | 1 | Excauvation of pits | | | |
|---|
| 2 | 1.01 | Pit excavation for 7.5 mts / 8 mts pole in ordinary soil including cleaning of site (each pit) | | | |
|---|
| 3 | 1.02 | 1.25 x 0.6 x 1.5m [ordinary soil] | Item 1 | 1 | Pit |
|---|
| 4 | 1.03 | Semi rocky soil | Item 2 | 1 | Pit |
|---|
| 5 | 2 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr | | | |
|---|
| 6 | 2.01 | Ordinary soil | Item 3 | 1 | Pit |
|---|
| 7 | 2.02 | Semi rocky soil | Item 4 | 1 | Pit |
|---|
| 8 | 2.03 | Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE] | Item 5 | 1 | Pit |
|---|
| 9 | 3 | Stay pit | | | |
|---|
| 10 | 3.01 | in ordinary soil [0.95 x 0.6 x 1.2m] | Item 6 | 1 | Pit |
|---|
| 11 | 3.02 | semi rocky soil | Item 7 | 1 | Pit |
|---|
| 12 | 3.03 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] | Item 8 | 1 | Pit |
|---|
| 13 | 4 | Erection of poles & stays (Including refilling of excavated earth) | | | |
|---|
| 14 | 4.01 | Erection of 7.5m / 8.0m poles [RCC / PSC] | Item 9 | 1 | Pole |
|---|
| 15 | 4.02 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles | Item 10 | 1 | Pole |
|---|
| 16 | 5 | Stay set | | | |
|---|
| 17 | 5.01 | Erection stay set complete | Item 11 | 1 | Set |
|---|
| 18 | 5.02 | Stay erection without rod and pit | Item 12 | 1 | Stay |
|---|
| 19 | 5.03 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) | Item 13 | 1 | E |
|---|
| 20 | 5.04 | Replacement of guy shackle only in existing stay | Item 14 | 1 | E |
|---|
| 21 | 6 | Erection of LINE MATERIALS | | | |
|---|
| 22 | 6.01 | Fixing of LT 1 ph \"X\" Arm | Item 15 | 1 | E |
|---|
| 23 | 6.02 | Fixing of LT/HT TI Fitting | Item 16 | 1 | E |
|---|
| 24 | 6.03 | Fixing of LT 3 ph \"X\" Arm | Item 17 | 1 | E |
|---|
| 25 | 6.04 | Fixing of 3[1/2]' ' V ` X ' arm | Item 18 | 1 | E |
|---|
| 26 | 6.05 | Fixing of 4[1/2]' V ` X ' arm | Item 19 | 1 | E |
|---|
| 27 | 6.06 | Fixing of 5' V X arm | Item 20 | 1 | E |
|---|
| 28 | 6.07 | Fixing of tapping channel / guarding \"X\" arm | Item 21 | 1 | E |
|---|
| 29 | 6.08 | Providing of line spacers in LT lines 1 phase | Item 22 | 1 | E |
|---|
| 30 | 6.09 | Providing of line spacers in LT lines 3 phase | Item 23 | 1 | E |
|---|
| 31 | 6.1 | Erection of AB Switch with PT insulator & Jumpering complete | Item 24 | 1 | Set |
|---|
| 32 | 6.11 | Erection of centre rotating Switch AB Switch complete | Item 25 | 1 | Set |
|---|
| 33 | 7 | FIXING OF HT PIN INSULATOR / STRAIN DISC | | | |
|---|
| 34 | 7.01 | 11 KV Pin insulator with pin | Item 26 | 1 | E |
|---|
| 35 | 7.02 | 11 KV strain disc / polymer disc with hardware | Item 27 | 1 | E |
|---|
| 36 | 7.03 | 22 KV Pin insulator with pin | Item 28 | 1 | E |
|---|
| 37 | 7.04 | 22 KV Strain disc / polymer disc with hardware | Item 29 | 1 | E |
|---|
| 38 | 7.05 | 33 KV Pin insulator with pin | Item 30 | 1 | E |
|---|
| 39 | 7.06 | 33 KV Pin Strain disc/polymer disc with hardware | Item 31 | 1 | E |
|---|
| 40 | 7.07 | Fixing of LT Pin insulator with pin | Item 32 | 1 | E |
|---|
| 41 | 7.08 | LT Shakle with hardware | Item 33 | 1 | E |
|---|
| 42 | 7.09 | Fixing of Aluminium knob | Item 34 | 1 | E |
|---|
| 43 | 8 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run | | | |
|---|
| 44 | 8.01 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | Item 35 | 1 | Per Span/ Per wire |
|---|
| 45 | 8.02 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | Item 36 | 1 | Per Span/ Per wire |
|---|
| 46 | 8.03 | ACSR 7/4.09 mm | Item 37 | 1 | Per Span/ Per wire |
|---|
| 47 | 8.04 | Above 7/4.09 mm ACSR & DOG conductor | Item 38 | 1 | Per Span/ Per wire |
|---|
| 48 | 8.05 | For LC Works( All Types of Conductor) | item 39 | 1 | Per Span/ Per wire |
|---|
| 49 | 9 | Route surveying and peg marking of HT/LT lines | item 40 | 1 | Per Km |
|---|
| 50 | 10 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] | | | |
|---|
| 51 | 10.01 | Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes | Item 41 | 1 | Each Set of Work |
|---|
| 52 | 10.02 | DP earthing including all works [double side earthing] | Item 42 | 1 | Each Set of Work |
|---|
| 53 | 10.03 | Erection of 4th Earth pipe including earthing | Item 43 | 1 | E |
|---|
| 54 | 10.04 | Earthing of poles | Item 44 | 1 | E |
|---|
| 55 | 10.05 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. | Item 45 | 1 | Each Set of Work |
|---|
| 56 | 10.06 | Replacement of detoriated earth pipe per location | Item 46 | 1 | E |
|---|
| 57 | 11 | Concreting with Mixture 1:3:6 [including All materials]. | | | |
|---|
| 58 | 11.01 | (a) Transformer Structure Poles Mass Concreting with coping 0.75Mx0.5Mx1.8M coping material supplied by the contractor (cement =100 kg river sand, 40 mm jully including labour 2 nos of pole in structure) | Item 47 | 1 | Set |
|---|
| 59 | 11.02 | (b) Mass concerting for pole in line 0.75Mx0.5Mx1.8M | Item 48 | 1 | E |
|---|
| 60 | 11.03 | (c ) Sleeve concret for poles in line 0.75M x 0.5x 0.9M | Item 49 | 1 | E |
|---|
| 61 | 11.04 | (d) Sleeve concret for Stay set 0.3x0.3x0.75 | Item 50 | 1 | E |
|---|
| 62 | 12 | Erection of Distribution Transformer Structure Complete | | | |
|---|
| 63 | 12.01 | Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr | Item 51 | 1 | 2Nos. |
|---|
| 64 | 12.02 | Transporting of pole to pit location 2 Nos. | Item 52 | 1 | 2Nos |
|---|
| 65 | 12.03 | Erection of poles 2 Nos | Item 53 | 1 | 2Nos |
|---|
| 66 | 12.04 | Excavation of stay pit 4 Nos | Item 54 | 1 | 4Nos |
|---|
| 67 | 12.05 | Erection of stay set (4 sets) | Item 55 | 1 | 4Nos |
|---|
| 68 | 12.06 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. | Item 56 | 1 | 2Nos |
|---|
| 69 | 12.07 | Erection of AB Switch | Item 57 | 1 | E |
|---|
| 70 | 12.08 | Transformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes | Item 58 | 1 | Set |
|---|
| 71 | 12.09 | Erection of Top Channel | Item 59 | 1 | E |
|---|
| 72 | 12.1 | Bed Channel [2 nos channel] Erection | Item 60 | 1 | Set |
|---|
| 73 | 12.11 | Cross with stud for bed channel Erection | Item 61 | 1 | E |
|---|
| 74 | 12.12 | Erection of belting angle / HG fuse angle | Item 62 | 1 | E |
|---|
| 75 | 12.13 | Erection of HG fuse Set | Item 63 | 1 | Se |
|---|
| 76 | 12.14 | Erection of HT LAS with jumpering and earthing | Item 64 | 1 | Set |
|---|
| 77 | 12.15 | Erection of LT LAS with jumbering and earthing | Item 65 | 1 | Set |
|---|
| 78 | 12.16 | Erection of Jumpering [HT Side] | Item 66 | 1 | E |
|---|
| 79 | 12.17 | Transformer wiring in LT side including Jumpering Bus bar etc. | Item 67 | 1 | Set |
|---|
| 80 | 12.18 | Erection LT open type fuse unit arrangement single | Item 68 | 1 | Set |
|---|
| 81 | 12.19 | Erection LT open type fuse unit arrangement Double | Item 69 | 1 | Pit |
|---|
| 82 | 12.2 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). | Item 70 | 1 | E |
|---|
| 83 | 12.21 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) | Item 71 | 1 | E |
|---|
| 84 | 12.22 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] | Item 72 | 1 | E |
|---|
| 85 | 12.23 | Painting name of SS at seating channel including paint. | Item 73 | 1 | E |
|---|
| 86 | 12.24 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. | Item 74 | 1 | E |
|---|
| 87 | 13 | Erection of Single Pole Mounted DT Erection Work ( Including Pole Concreting & 3Nos Earth Pipe & Paintimng) | Item 75 | 1 | Set |
|---|
| 88 | 14 | Erection of DT metering arrangement (Materials Supplied by the Board) | Item 76 | 1 | E |
|---|
| 89 | 15 | Erection of distribution Transformer /Dismantling of DT | | | |
|---|
| 90 | 15.01 | Upto 100 KVA | Item 77 | 1 | E |
|---|
| 91 | 15.02 | above 100 KVA and Upto 250 KVA | Item 78 | 1 | E |
|---|
| 92 | 15.03 | 500 KVA | Item 79 | 1 | E |
|---|
| 93 | 15.04 | Colour washing of RCC / PSC poles | Item 80 | 1 | E |
|---|
| 94 | 15.05 | Numbering of poles including cost of paint / loc [black background and yellow letters] | Item 81 | 1 | E |
|---|
| 95 | 15.06 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. | Item 82 | 1 | E |
|---|
| 96 | 16 | SERVICE CONNECTION | | | |
|---|
| 97 | 16.01 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling | Item 83 | 1 | E |
|---|
| 98 | 16.02 | Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc. | Item 84 | 1 | E |
|---|
| 99 | 16.03 | Fixing of street light fitting with 2 CFL/ 4 CFL | Item 85 | 1 | E |
|---|
| 100 | 16.04 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. | Item 86 | 1 | E |
|---|
| 101 | 16.05 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot | Item 87 | 1 | E |
|---|
| 102 | 16.06 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV | Item 88 | 1 | E |
|---|
| 103 | 17 | Fabrication Works. | | | |
|---|
| 104 | 17.01 | Labour charges for alteration of back clamp / stay clamp to suitable for works. | Item 89 | 1 | E |
|---|
| 105 | 18 | Providing of Holes. | | | |
|---|
| 106 | 18.01 | All size angles / channel upto 5/8\" | Item 90 | 1 | E |
|---|
| 107 | 18.02 | All size angles / channel above 5/8\" | Item 91 | 1 | E |
|---|
| 108 | 18.03 | Slot holes in flat / angles / channel upto 3/4\" | Item 92 | 1 | E |
|---|
| 109 | 18.04 | Slot holes in flat / angles / channel above 3/4\" | Item 93 | 1 | E |
|---|
| 110 | 18.05 | Fabrication of centre support only for DT structure | Item 94 | 1 | E |
|---|
| 111 | 18.06 | Cutting of RS Joist / Angles / MS Channels | Item 95 | 1 | E |
|---|
| 112 | 18.07 | Welding of RS Joist / Angles / MS Channels | Item 96 | 1 | E |
|---|
| 113 | 19 | GENERAL | | | |
|---|
| 114 | 19.01 | Set right the leaning pole in both HT & LT [ pin point ] location | Item 97 | 1 | Loc |
|---|
| 115 | 19.02 | Set right the leaning pole in both HT & LT [ cut point ] location | Item 98 | 1 | Loc |
|---|
| 116 | 19.03 | Resagging of lines for all sizes cut point location | Item 99 | 1 | Loc |
|---|
| 117 | 19.04 | Converting pin point into cut point HT lines | Item 100 | 1 | Loc |
|---|
| 118 | 19.05 | Converting pin point into cut point LT lines | Item 101 | 1 | Loc |
|---|
| 119 | 19.06 | Clearing tree branches of coconut tree | Item 102 | 1 | Per tree |
|---|
| 120 | 19.07 | Clearing tree branches of Neem, tamarind, country tree etc., | Item 103 | 1 | per tree |
|---|
| 121 | 19.08 | Releasing and Re-Erection of 1 ph SC wire [during conductor or support change] | Item 104 | 1 | E |
|---|
| 122 | 19.09 | Releasing and Re-erection 3 ph SC wire [during conductor or support change] | Item 105 | 1 | E |
|---|
| 123 | 19.1 | Destruction of pole concerting at site. | Item 106 | 1 | E |
|---|
| 124 | 19.11 | Retrieving grill from detoriated pole [grill separate from damaged pole] | Item 107 | 1 | E |
|---|
| 125 | 19.12 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe | Item 108 | 1 | Set |
|---|
| 126 | 19.13 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) | Item 109 | 1 | Set |
|---|
| 127 | 20 | Guarding Arrangement :- | | | |
|---|
| 128 | 20.01 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] | Item 110 | 1 | Span |
|---|
| 129 | 20.02 | Flat guarding with 4 wire | Item 111 | 1 | Span |
|---|
| 130 | 20.03 | Split Netural Guarding | Item 112 | 1 | Span |
|---|
| 131 | 21 | LOADING AND UNLOADING : | | | |
|---|
| 132 | 21.01 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] | Item 113 | 1 | E |
|---|
| 133 | 21.02 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] | Item 114 | 1 | E |
|---|
| 134 | 21.03 | Unloading of PSC / RCC / Metal Poles | Item 115 | 1 | E |
|---|
| 135 | 22 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT | | | |
|---|
| 136 | 22.01 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km | Item 116 | 1 | Loc |
|---|
| 137 | 22.02 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ] | Item 117 | 1 | km |
|---|
| 138 | 22.03 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km | Item 118 | 1 | Loc |
|---|
| 139 | 22.04 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof | Item 119 | 1 | km |
|---|
| 140 | 23 | TRANSPORT OF LINE MATERIALS | | | |
|---|
| 141 | 23.01 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms | Item 120 | 1 | MT |
|---|
| 142 | 23.02 | Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM | Item 121 | 1 | MT |
|---|
| 143 | 23.03 | Loading/ Unloading of Line Materials | Item 122 | 1 | MT |
|---|
| 144 | 24 | TRANSPORT OF EQUIPEMENTS | | | |
|---|
| 145 | 24.01 | Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km | item 123 | 1 | Trip |
|---|
| 146 | 24.02 | .Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM | ltem124 | 1 | Trip |
|---|
| 147 | 25 | DISMANTLING WORKS | | | |
|---|
| 148 | 25.01 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] | ltem125 | 1 | E |
|---|
| 149 | 25.02 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles | ltem126 | 1 | E |
|---|
| 150 | 25.03 | Dismantling stay set complete | ltem127 | 1 | Set |
|---|
| 151 | 25.04 | Dismantling of LT 1 ph \"X\" Arm / LT/HT TI Fitting | ltem128 | 1 | E |
|---|
| 152 | 25.05 | Dismantling of LT/HT TI Fitting | ltem129 | 1 | E |
|---|
| 153 | 25.06 | Dismantling of LT 3 ph \"X\" Arm | ltem130 | 1 | E |
|---|
| 154 | 25.07 | Dismantling of 3[1/2]' V ` X ' arm | ltem131 | 1 | E |
|---|
| 155 | 25.08 | Dismantling of Tapping channel and Guarding X Arm | ltem132 | 1 | E |
|---|
| 156 | 25.09 | Dismantling of 11 KV strain disc/polymer disc with hardware | ltem133 | 1 | E |
|---|
| 157 | 25.1 | Dismantling of 22 KV Pin insulator with pin | ltem134 | 1 | E |
|---|
| 158 | 25.11 | Dismantling of 22 KV Strain disc with hardware | ltem135 | 1 | E |
|---|
| 159 | 25.12 | Dismantling of 33 KV Pin insulator with pin | ltem136 | 1 | E |
|---|
| 160 | 25.13 | Dismantling of 33 KV Strain disc with hardware | ltem137 | 1 | E |
|---|
| 161 | 25.14 | Dismantling of LT Pin insulator with pin | ltem138 | 1 | E |
|---|
| 162 | 25.15 | Dismantling of LT Shackle with hardware | ltem139 | 1 | E |
|---|
| 163 | 25.16 | Dismantling of Aluminium knob | ltem140 | 1 | E |
|---|
| 164 | 25.17 | Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm | ltem141 | 1 | Km/ Run |
|---|
| 165 | 25.18 | Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm | ltem142 | 1 | Km/ Run |
|---|
| 166 | 25.19 | Dismantling of Conductor ACSR 7/4.09 mm | ltem143 | 1 | Km/ Run |
|---|
| 167 | 26 | SINGLE PHASE METER &3 PHASE METER | | | |
|---|
| 168 | 26.01 | Replacement ( Releasing & Fixing) of Single Phase Meter ( Including Transport Charges) | ltem144 | 1 | E |
|---|
| 169 | 26.02 | Replacement ( Releasing & Fixing) of Three Phase Meter ( Including Transport Charges) | ltem145 | 1 | E |
|---|
| 170 | 26.03 | Checking Healthiness of Agl.Meter | ltem146 | 1 | E |
|---|
| 171 | 26.04 | Checking Healthiness of Agl.Meter1 | ltem147 | 1 | E |
|---|