Name of Work: TANGEDCO- Ennore SEZ STPP(2x660 MW)-Proposed comprehensive rehabilitation Reconstruction and raising of NCTPS Ash dyke bund- Conducting Reconnaissance survey, topographic survey , Contour survey, quantity survey, including plotting and submission of drawings for areas in and around the existing Ash dyke of NCTPS STAGE-I.
Sl.No.
Item Description
Item Code / Make
Quantity
Units
1
1
Reconnissance survey, Conducting topography, Contour survey around the existing Ash dyke primary pond-II , secondary pond , pump house and water conducting system of Ash dyke of NCTPS STAGE-I, peripheral canal , dedicated road ,Ennore SEZ plant boundary wall ,ash slurry pipe line of Stage-I,II & III, etc., including cost of all labour charges, hire charges for all latest technology surveying instruments, tools and tackles, jungle clearance, etc.,complete and as per direction of the engineer in charge at site.
BI01010001010000000000000515BI0100001127
7
km
2
2
Plotting longitudinal section cross sections and quantity calculations, computation contour map drawings, and submission of drawings & particulars in five sets of copies (A0 to A4 size),etc., complete and as per direction of the engineer in charge at site.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.