Sdrf-2020-21-Repair And Restoration Works To Pallivayal Mundery Road Sdrf-2020-21-Repair And Restoration Works To Pallivayal Mundery Road In Between Ch 0/00Km And 1/200Km In Kurumathur Gp
Tender Value
7.13 Lakhs
Estimated cost
Bid Submission
08 Jul 2021
0 days left
EMD
10700
Bank guarantee accepted
Document Fee
1680
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kurumathur → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Sdrf-2020-21-Repair And Restoration Works To Pallivayal Mundery Road Sdrf-2020-21-Repair And Restoration Works To Pallivayal Mundery Road In Between Ch 0/00Km And 1/200Km In Kurumathur Gp
BOQ
| Work Name:SDRF-2020-21-Repair And Restoration Works To Pallivayal -Mundery Road In Between ch:0/00km and 1/200km In Kurumathur GP. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | Detailed Estimate | BI01010001010000000000000515BI0100001113 | ||
| 2 | 1.001 | 75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates\n<br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | BI01010001010000000000000515BI0100001114 | 323.94 | sqm |
| 3 | 1.002 | 3.1 : Preparation of Foundation for EmbankmentScarifying Existing Granular Surface to a Depth of 50 mm by Manual Means Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. | BI01010001010000000000000515BI0100001115 | 270 | sqm |
| 4 | 1.003 | 4.9 : Wet Mix Macadam\t<br>\t\t\nProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.\t\t<br>\t\nBy Mechanical Means with 1 km lead | BI01010001010000000000000515BI0100001116 | 35.1 | cum |
| 5 | 1.004 | 75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | BI01010001010000000000000515BI0100001117 | 270 | sqm |
| 6 | 1.005 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001118 | 270 | sqm |
| 7 | 1.006 | 75.5.2.1pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | BI01010001010000000000000515BI0100001119 | 1530 | sqm |
| 8 | 1.007 | 75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br>\t\t\t\t\t\t\t\t\nProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.\t\t<br>\t\t\t\t\t\t\nCase - I By Manual Means\t<br>\t\t\t\t\t\t\t\n(II)\tBitumen (S-65) | BI01010001010000000000000515BI0100001120 | 1800 | sqm |
| 9 | 1.008 | 75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510\t<br>\nA.\tBy Manual Means\t<br>\nCase III : Type C\t<br>\t\t\t\n(II)\tBitumen (S-65) | BI01010001010000000000000515BI0100001121 | 1800 | sqm |
| 10 | 1.009 | 3.8.1 : Excavation in ordinary Rock by manual meansExcavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3.5. | BI01010001010000000000000515BI0100001122 | 30 | cum |
| 11 | 1.01 | 3.14 : Construction of Subgrade and Earthen Shoulders<br>\nConstruction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | BI01010001010000000000000515BI0100001123 | 36 | cum |
| 12 | 1.011 | od1101242/2020_2021 : Providing And Fixing Name Board Of Size 0.60x0.60m made with vertical post 32mm dia: GI Pipe and RHS 25X25MM 16 guage frame and 0.80mm thick GI Sheet and painting two sides with synthetic enamel paint including painting the letters with synthetic enamel paint etc.........complete. | BI01010001010000000000000515BI0100001124 | 1 | each |
AI Tender Summary
Tender Timeline
Jun 28, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedJul 08, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 13, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender