| 1 | 1 | Supply, Installation, testing and commissioning of SCADA software for data logging | | 1 | ea |
|---|
| 2 | 2 | Suuply of PC (Processor - i7, Windows 10, Storage 1 TB, RAM 8/16 GB, 24\" LED monitor, mouse, keyboard\nMake - HP, DELL, LENOVO, HCL) | | 1 | ea |
|---|
| 3 | 3 | Supply of 6-core armoured Optical Fibre Cable | | 500 | m |
|---|
| 4 | 4 | Supply and installation of sensors (with FLP enclosures, stand for mounting) for equipment | | 7 | ea |
|---|
| 5 | 5 | Supply and installation of limit switch (with FLP enclosures, stand for mounting) for equipment | | 7 | ea |
|---|
| 6 | 6 | Supply and installation of FLP pressure switch for VCWE machines with mounting arrangement | | 3 | ea |
|---|
| 7 | 7 | Supply of PLC with required no. of I/O modules (Make - Allen Bradley/ Schneider/ Siemens/ Yokogawa/ Emerson or equivalent) | | 1 | ea |
|---|
| 8 | 8 | Supply of SMPS 24 Volt | | 1 | ea |
|---|
| 9 | 9 | Supply of FLP Panel (Make- CEAG, Baliga, Stahl, FCG or equivalent) | | 1 | ea |
|---|
| 10 | 10 | Supply of Double Compression Cable Glands (Make- CEAG, Baliga, Stahl, FCG or equivalent) | | 100 | ea |
|---|
| 11 | 11 | Supply of Media converter (Optical to Ethernet) | | 2 | ea |
|---|
| 12 | 12 | Supply of 4 core, 1.5 sqmm armoured copper cable (Make - Havells, Polycab, KEI) | | 1000 | m |
|---|
| 13 | 13 | Supplying, fabricating and installing \nperforated GI cable trays (100mm) | | 200 | m |
|---|
| 14 | 14 | Cable laying alongwith glanding/ termination | | 1500 | m |
|---|
| 15 | 15 | Excavation in all kinds of soil for making trench for cable laying | | 90 | m3 |
|---|
| 16 | 16 | Back filling of excavated earth in trenches | | 90 | m3 |
|---|
| 17 | 17 | Brick work wherever required | | 7.5 | m3 |
|---|
| 18 | 18 | Supervision/ programming/ commissioning charges/ OFC jointing as per requirement/ Installation & Commissioning of all equipment etc | | 1 | ea |
|---|