| 1 | 1 | Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead :\n15.40.1 Thickness up to 40 mm | 11 | 32 | Square Metre |
|---|
| 2 | 2 | Dismantling precast concrete or stone slabs in coping of external walls, toe wall, partition walls etc. Including dismantling of old plaster stacking within 50 metres lead : Thickness upto 40mm. | 11 | 13 | Square Metre |
|---|
| 3 | 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 11 | 45 | Square Metre |
|---|
| 4 | 4 | Stone work with old stone slab for wall lining etc. (veneer work) upto plinth level, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade including cutting of stone slab in upto required size : (Stone slab will be provided free of cost at site) upto 40mm thick stone slab. | 11 | 16 | Square Metre |
|---|
| 5 | 5 | Stone work (machine cut edges) for wall lining etc. (veneer work) upto plinth level, backing filled with a grout of average 12mm thick cement mortar 1:3 (1 cement : 3 coarse sand) indlucing pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : Red sand stone - Exposed face machine cut and table rubbed with rought backing. 30mm thick. | 11 | 44 | Square Metre |
|---|
| 6 | 6 | Old stone work, plain in copings, cornices, string courses and plinth courses, upto 75mm thick in cement mortar 1:6 (1 cement : 6 coase sand), including pointing with white cement mortar 1:2 ( 1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. (Stone slab will be provided free of cost at site). Red/White sand stone. | 11 | 7 | Square Metre |
|---|
| 7 | 7 | Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. Red sand stone | 11 | 2.11 | Cubic Metre |
|---|
| 8 | 8 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.\nWedge expansion type Fastener with threaded dia 10 mm. | 11 | 128 | Each |
|---|
| 9 | 9 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 11 | 6 | Cubic Metre |
|---|
| 10 | 10 | Brick work with old F.P.S. Bricks of class designation 75 in foundation and plinth in. (a) cement mortar 1:6 (1 cement : 6 coarse and) brick shall be supplied by Department free of cost at site. | 11 | 3 | Cubic Metre |
|---|
| 11 | 11 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). | 11 | 3 | Cubic Metre |
|---|
| 12 | 12 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 11 | 5 | Cubic Metre |
|---|
| 13 | 13 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 11 | 13 | Cubic Metre |
|---|